40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
OMC elog |
Not logged in |
 |
|
Wed May 8 15:36:50 2013, Koji, General, General, Latest OMC schedule
|
Mon May 13 15:00:23 2013, Koji, General, General, Current most reliable OMC schedule
|
Tue May 21 18:28:08 2013, Koji, General, General, Current most reliable OMC schedule
|
|
Message ID: 122
Entry time: Wed May 8 15:36:50 2013
Reply to this: 126
|
Author: |
Koji |
Type: |
General |
Category: |
General |
Subject: |
Latest OMC schedule |
|
|
May
(done) Mon 6th: Invar plate arrival / Spot position measurement
(done) Tue 7th: Invar plate cleaning / Spot position measurement / EP30-2 arrival / Invar plate gluing to the test mounting brackets
(done) Wed 8th: Invar plate cleaning done / Baking of the test pieces (with Bob's oven)
Thu 9th: ***After bake torque/force test***
***If the invar plate passes the test***
Thu 9th Light side invar plate gluing
Fri 10th Cable side invar plate gluing
Mon 13th The OMC given to Bob (Air bake & Vac bake)
Mon 20th The OMC received from Bob
Apply First contact
Diode mount adjustment / Electronic tests
Tue 21st Diode mount adjustment / Electronic tests / Optical tests
Wed 22nd Final cabling (***Chub***)
Thu 23rd Final cabling / Packing
Fri 24th Packing / Shipping
Mon 27th? Arrival to LLO / Koji fly to LLO
Tue 28th Test on the optical bench
Wed 29th Test on the optical bench
Thu 30th Suspension test? (***Jeff B***)
June
Tue 4th Suspension test done? |