  3344   Sun Aug 1 18:50:35 2010 KojiUpdateVACP1 = 0.48 torrI resumed the pumping today. Now the pressure
is 0.48 torr. The pump was stopped.

  
  3348   Mon Aug 2 17:12:28 2010 KojiUpdateGeneralLab schedule for the week of Aug. 2Aug
2 Mon - 5 Thu WFS work (Nancy)
 PSL_work_schedule.pdf 
  3350   Mon Aug 2 21:52:57 2010 KojiUpdateIOOMC is running at the full power[Nancy and Koji]
We restored the full power operation
of the MC.
  
  3355   Wed Aug 4 01:44:56 2010 KojiConfigurationPEMAccelerometer located on and below the PSL table[Jenne and Koji] 
In order to characterize the seismic vibration
 IMG_2675.jpgIMG_2678.jpgIMG_2682.jpg 
  3364   Thu Aug 5 00:17:41 2010 KojiUpdatePSLPSL preparation workWe start the work on the cables at around
the PSL table.
  
  3367   Thu Aug 5 13:05:53 2010 KojiUpdateIOOMode Cleaner WFSUpon Nancy's request, I checked the status
of the suspensions.
I found that the power strip of the
  
  3369   Thu Aug 5 17:59:23 2010 KojiUpdatePSLCable removal from the control room[Alberto, Kiwamu, and Koji]
We removed the BNC cables from the
control room. 
 IMG_2684.jpg 
  3370   Thu Aug 5 22:36:11 2010 KojiUpdatePSLPSL preparation workPSL preparation work

  
  3374   Fri Aug 6 12:33:10 2010 KojiUpdateIOOMode Cleaner WFS


   
        
            
  
  3375   Fri Aug 6 12:44:29 2010 KojiUpdateIOOMC data taking over the weekendQuestion:
Do you like to keep the WFS turned
on? 
  
  3381   Fri Aug 6 20:00:03 2010 KojiUpdatePSLPSL preparation workPSL preparation work report
Aug 6th
10am-5pm: (Steve
 PSL_cable_map.pdf 
  3382   Sat Aug 7 10:47:38 2010 KojiSummaryelogelog restarted / source of the trouble eliminatedNancy
notified me that the elog crashed. It was
  
  3383   Sat Aug 7 11:07:44 2010 KojiConfigurationPSLMC kept locked / PMC control gain reduced to +13dBJenne asked us to keep th MC locked
and let the seismometers happy through this
weekend.
  
  3388   Mon Aug 9 15:54:43 2010 KojiUpdateIOOMode Cleaner ASCThe WFS and QPD servos were working.
That was great.
Everything was fine except for the
  
  3391   Tue Aug 10 05:56:07 2010 KojiUpdatePSLPSL Table Lifting PreparationWork
on Aug 9th
Steve, Jenne,
Koji, Alberto, Aidan, Jan, Sharmila, Katherine
From
 IMG_2686.jpgIMG_2691.jpgIMG_2692.jpgIMG_2711.jpg 
  3395   Tue Aug 10 22:40:55 2010 KojiSummaryPEMAccelerometer located on and below the PSL tableResult
of the accelerometer measurement
Introduction

We wanted to characterize
 PEM_100809.pdf 
  3403   Wed Aug 11 16:56:00 2010 KojiSummaryEnvironmentCovering of the IFOKatharine, Sharmila, Gopal, Kiwamu,
Jenne, Aidan, Steve, and Koji
A guy from the carpenter shop has
 IMG_2732.jpg 
  3412   Thu Aug 12 17:10:07 2010 KojiUpdatePhase CameraSideband power measurement (updated)This sounds very relieving although this
could be a lower bound of the number.
Why didn't you use the output on the
  
  3487   Mon Aug 30 13:57:25 2010 KojiSummaryPSLPSL table vibrational performance after the upgradeJenne and Koji
Last week Jenne has put the accelerometers
on and under the PSL table immediately after
 PEM_100830_SPE.pdfPEM_100830.pdf 
  3502   Wed Sep 1 08:28:43 2010 KojiUpdatePSLPSL upgrade update


   
        
            
  
  3503   Wed Sep 1 08:36:59 2010 KojiHowToPSL2W NPRO Mount designed with emachineshop.com software1. I can not see whether the attaching
surface is flat or not.
It should have ~1mm step to avoid
  
  3522   Fri Sep 3 13:04:30 2010 KojiFrogsElectronicsCable cutting toolsYeah, this looks nice.
And I also like to have something
I have attached. This is "HOZAN P-90",
 P90.jpg 
  3527   Mon Sep 6 20:38:58 2010 KojiUpdateCDSSusension model reviewedI have reviewed the suspension model of
C1SUS and refined it.
It is comaptible to the current one
 suspension_model.pdf 
  3575   Wed Sep 15 03:08:26 2010 KojiUpdatePSLFSS lockingBrilliant! This is the VERY way
how the things are to be conquered!

  
  3581   Fri Sep 17 03:06:06 2010 KojiUpdateSUSSOS sent for bakingTwo SOS suspensions for the ETMs were
disassembled and packed for cleaning and
baking by Bob.
 IMG_3596.jpgIMG_3597.jpg 
  3582   Fri Sep 17 03:32:11 2010 KojiUpdateSUSArrangement of the SUS towersThe day before yesterday, I was cleaning
a flow bench in the clean room.
I found that one SOS was standing
  
  3595   Wed Sep 22 22:22:12 2010 KojiConfigurationComputersNetgear Network Switch fan broken.Net switch mumbo-jumbo:
Although Rana is going to buy a replacement
for the Netgear Switch for martian, I opened
  
  3597   Thu Sep 23 02:45:30 2010 KojiSummaryComputersnodus gracefully rebootedZach> Nodus seemed to be working fine
again, and I was browsing the elog with no
  
  3599   Thu Sep 23 11:15:20 2010 KojiFrogsComputersnodus gracefully rebootedsvn is back after starting apache on nodus.
http://lhocds.ligo-wa.caltech.edu:8000/40m/ApacheOnNodus

  
  3601   Thu Sep 23 13:16:57 2010 KojiFrogsComputersnodus gracefully rebootedmafalda is up now.
I found that the cable for mafalda
(the sole red cable) had a broken latch.
  
  3608   Sat Sep 25 19:01:13 2010 KojiUpdateElectronicstesting TTFSSHow much current do you need for each voltages?
GE-82 was the only PNP transister
I could find in the lab. It's too old but
  
  3669   Thu Oct 7 15:05:46 2010 KojiUpdatePSLmeasured PMC's laser power-output relationIt was a bit difficult to comprehend the
result.
Is it good? or bad? Have you seen
  
  3671   Thu Oct 7 16:21:02 2010 KojiOmnistructureCDSBig 3Both Rolf and Alex (at least his elbow)
together visited the 40m to talk with Joe
for the CDS.
 IMG_3642.jpg 
  3683   Sun Oct 10 16:44:59 2010 KojiOmnistructurePhotosKepco Tube HV supply   IMG_3637.jpgIMG_3640.jpg 
  3684   Sun Oct 10 16:59:20 2010 KojiOmnistructureCOCPRM phase map measurement at Downs SB 014[Kiwamu, Yuta, Koji]
We went to the new metrology lab
at Downs subbasement (Rm014) in order to
 IMG_3646.jpgIMG_3647.jpg 
  3685   Sun Oct 10 18:09:02 2010 KojiSummaryCOCPhase map interferometer calibration for the data on Oct 8th, 2010 Summary:
Calibration
of the phase map interferometer was calculated
for the data on Oct 8th, 2010.
 calibration.pdf 
  3724   Thu Oct 14 22:26:38 2010 KojiUpdateComputersNew Netgear SwitchThe network cables for the Martian network were
moved to the new Netgear switch
  
  3726   Fri Oct 15 00:15:52 2010 KojiUpdateIOO2W NPRO laser output power versus temperatureFrom the plot, you observed the reduction
of the output power only by 1% between 25deg
to 45deg.
  
  3737   Mon Oct 18 18:00:36 2010 KojiUpdateSUSOld PRM, SRM stored, new PRM drag wiped- Steve is working on the storage shelf
for those optics.
- PRMU002 was chosen as it has the
  
  3738   Mon Oct 18 18:33:46 2010 KojiSummaryCOCSummary of the main mirrors & their phasemap measurementI have made a summary web page for the
40m upgrade optics.
https://nodus.ligo.caltech.edu:30889/40m_phasemap/
  
  3743   Tue Oct 19 22:37:28 2010 KojiUpdatePSLPSL table cleaning upI cleaned up the scattered tools, optics,
and mounts of the PSL table. I gathered those
stuffs at the two coners.
  
  3753   Thu Oct 21 13:05:19 2010 KojiSummaryComputerselog change and rossa texThis is cool    
  3755   Thu Oct 21 18:45:50 2010 KojiUpdatePSLFound the beat at 1064nm[Koji Suresh]
We found the beat at 1064nm. T(PSL)=26.59deg,
  
  3759   Fri Oct 22 01:23:13 2010 KojiUpdatePSLFound the beat at 1064nm[Koji / Suresh]
We worked on the 1064 beating a bit
more.
 101021_beat.pdf 
  3774   Mon Oct 25 02:14:38 2010 KojiSummaryLockingsetup for green beat- What is the actual photocurrent for the
beam1 and beam2? We don't care how much power
do you have before the BS, but care how much
  
  3775   Mon Oct 25 02:23:47 2010 KojiConfigurationelogELOG 2.8.0When I push the reply button, the raw html
shows up in the edit window and have to use
HTML to write the entry.
  
  3776   Mon Oct 25 02:25:21 2010 KojiUpdatePSLQuarter Wave Plate MeasurementsQ1. Suppose the laser beam has a certain
(i.e. arbitrary) polarization state but contains
only TEM00. Also suppose the PSB is perfect
  
  3779   Mon Oct 25 23:10:06 2010 KojiUpdateIOOMC is now flashing[Suresh / Koji]
The MC
  
  3780   Mon Oct 25 23:59:37 2010 KojiConfigurationelogELOG 2.8.0 -> ELOG 2.7.5ELOG
reverted to 2.7.5 due to editing difficulties
  
  3784   Tue Oct 26 10:50:08 2010 KojiConfigurationelogELOG 2.8.0 -> ELOG 2.7.5 -> ELOG 2.8.0ELOG
restarted with 2.8.0 again.
  