40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 97 of 171  Not logged in ELOG logo
Entry  Thu Sep 15 01:17:10 2011, Keiko, Update, LSC, MICH locked and attempt to lock PRCL 
    Reply  Thu Sep 15 02:18:19 2011, Anamaria, Update, LSC, MICH locked and attempt to lock PRCL 
Entry  Wed Sep 14 22:07:41 2011, rana, Update, SUS, ITM Oplevs are broken mm.jpg
Entry  Tue Sep 13 03:18:14 2011, kiwamu, Update, LSC, Y arm locking prep image.png
    Reply  Tue Sep 13 19:31:09 2011, kiwamu, Update, LSC, Y arm locking prep Yarmlocked.png
       Reply  Wed Sep 14 01:17:51 2011, kiwamu, Update, LSC, measurement of spot position on Y arm misposition.png
          Reply  Wed Sep 14 15:00:00 2011, kiwamu, Update, LSC, measurement of spot position on Y arm DSC_3408_small.jpg
    Reply  Wed Sep 14 21:18:45 2011, kiwamu, Update, LSC, Y arm locking prep 
Entry  Wed Sep 14 20:04:05 2011, jamie, Update, CDS, Update to frame builder wiper.pl script for GPS 1000000000 
Entry  Wed Sep 14 14:06:44 2011, kiwamu, Update, General, minutes of 40m meeting : plans 
Entry  Wed Sep 14 01:19:20 2011, Anamaria, Configuration, LSC, 3f PD Install in Progress 
Entry  Tue Sep 13 19:12:53 2011, Suresh, Update, Computer Scripts / Programs, changes to the c1ioo, c1mcs and c1rfm 
Entry  Tue Sep 13 19:04:58 2011, Suresh, Update, Computer Scripts / Programs, Restarted Frame builder several times while compiling c1ioo, c1mcs and c1rfm 
Entry  Sat Sep 10 19:03:57 2011, rana, Update, LSC, Y Arm work 
    Reply  Sat Sep 10 19:45:29 2011, Jenne, Update, LSC, Y Arm work 
    Reply  Tue Sep 13 16:57:44 2011, steve, Update, LSC, ITMX oplev ** 
Entry  Tue Sep 13 09:16:00 2011, Suresh, Update, IOO, MC spots recentered and input beam aligned mcdecenter20110912_1.pngmcdecenter20110912_2.png
Entry  Mon Sep 12 23:45:14 2011, Suresh, Configuration, Computer Scripts / Programs, StripTool does not scale properly on Pianosa 
Entry  Mon Sep 12 18:45:04 2011, Anamaria, Configuration, LSC, AP table current layout 40mAPtable.pdf
Entry  Sat Sep 10 20:30:01 2011, rana, Update, IOO, MC trans re-aligned / MC2 shifted mysteriously / MC2 re-aligned MCdecenter.png
Entry  Sat Sep 10 18:52:45 2011, rana, Update, Computers, conlog getting filled up 
Entry  Sat Sep 10 01:36:15 2011, kiwamu, Update, ASC, interferometer coarsely aligned 
Entry  Fri Sep 9 16:16:59 2011, kiwamu, Update, IOO, spot positions on MC mirrors (in-vac) 
    Reply  Fri Sep 9 20:52:59 2011, kiwamu, Update, IOO, spot positions on MC mirrors (in-vac) 
Entry  Fri Sep 2 13:12:08 2011, kiwamu, Update, IOO, triple resonant box : ready to install refl_eom.png
    Reply  Fri Sep 2 15:56:32 2011, Koji, Update, IOO, triple resonant box : ready to install 
       Reply  Sat Sep 3 14:47:50 2011, kiwamu, Update, IOO, triple resonant box : brief estimations about reflections and mode. depths 
          Reply  Wed Sep 7 22:17:04 2011, rana, Update, IOO, RF Amp for EOM on PSL Table 
             Reply  Fri Sep 9 19:15:17 2011, rana, Update, IOO, RF Amp for EOM on PSL Table 
Entry  Fri Sep 9 14:55:03 2011, kiwamu, Update, SUS, OSEM pictures on ITMs 
Entry  Fri Sep 9 11:59:58 2011, kiwamu, Update, IOO, PZT1 doesn't work 
    Reply  Fri Sep 9 13:29:09 2011, kiwamu, Update, IOO, a history of PZT mirror 
Entry  Thu Sep 8 20:13:24 2011, kiwamu, Update, IOO, MC is back to full power 
Entry  Wed Sep 7 12:03:49 2011, steve, Update, VAC, Pump down has started 
    Reply  Wed Sep 7 18:19:37 2011, steve, HowTo, VAC, stop pump down for overnight 
       Reply  Wed Sep 7 21:45:16 2011, kiwamu, Update, VAC, pump stopped. Pressure is at 450 mtorr vacuum.png
       Reply  Thu Sep 8 10:50:44 2011, steve, Update, VAC, pumpdown #71 comleted pd#71.jpgmaglevpd.jpg
Entry  Wed Sep 7 20:44:11 2011, Suresh, Update, elog, restarted 
Entry  Fri Jul 29 16:25:06 2011, kiwamu, Update, ASC, beam axis and Y arm aligned 
    Reply  Sat Jul 30 06:24:06 2011, kiwamu, Update, ASC, Y arm ASS fixed 
       Reply  Sat Jul 30 21:04:23 2011, kiwamu, Update, ASC, Y arm ASS fixed 
       Reply  Sun Jul 31 00:05:52 2011, kiwamu, Update, LSC, script for loss measurement : modified 
          Reply  Sun Jul 31 22:35:35 2011, kiwamu, Update, LSC, arm loss measurement : done 
             Reply  Wed Sep 7 16:21:35 2011, kiwamu, Update, LSC, arm loss measurement : resluts Yarmloss.pngXarmloss.png
                Reply  Wed Sep 7 17:28:41 2011, kiwamu, Update, LSC, X arm loss measurement : not good Xarmlossmeasurement.png
Entry  Tue Sep 6 22:51:53 2011, rana, Summary, Cameras, All Camera setups a need upgrading 
    Reply  Wed Sep 7 13:28:25 2011, steve, Summary, Cameras, All Camera setups a need upgrading 
Entry  Wed Sep 7 09:21:57 2011, jamie, Update, SUS, SUS spectra before close up 9x
Entry  Wed Sep 7 08:14:01 2011, steve, Update, SUS, final OSEM check finalcheck.jpgITMX10min.jpgfinalsum.png
Entry  Wed Sep 7 00:47:51 2011, Jenne, Update, VAC, PUMP is a GO! 
Entry  Wed Sep 7 00:44:51 2011, Jenne, Update, SUS, Freeswing all 
Entry  Wed Sep 7 00:39:34 2011, rana, Update, SUS, ITMX adjustments 
Entry  Wed Sep 7 00:01:23 2011, Suresh, Update, IOO, ITMY chamber ready for heavy doors 
Entry  Tue Sep 6 21:33:21 2011, Jenne, Update, SUS, Diagonalizability of ITMX and ITMY is acceptable ITMX.pngITMY.png
Entry  Tue Sep 6 21:00:48 2011, Zach, Update, elog, elog restarted 
Entry  Tue Sep 6 17:43:01 2011, Suresh, Update, IOO, Free Swing ITMY started 
    Reply  Tue Sep 6 17:56:53 2011, Jenne, Update, IOO, Free Swing ITMY started 
Entry  Tue Sep 6 17:48:57 2011, kiwamu, Update, SUS, free swinging test on ITMY 
    Reply  Tue Sep 6 17:56:12 2011, Jenne, Update, SUS, free swinging test on ITMX 
Entry  Tue Sep 6 11:27:19 2011, Jenne, Update, General, Afternoon pre-pumpdown todo list 
Entry  Tue Sep 6 11:21:33 2011, Jenne, Update, SUS, ITMX rehung (Friday) 
Entry  Fri Sep 2 17:52:16 2011, kiwamu, Update, SUS, ITMX realigned 
    Reply  Tue Sep 6 08:05:53 2011, steve, Update, SUS, ITMX must be touching osemITMX.jpg
Entry  Thu Aug 25 17:40:07 2011, Dmass, Update, Computer Scripts / Programs, elog broke, fixed 
    Reply  Mon Sep 5 21:12:05 2011, Dmass, Update, Computer Scripts / Programs, elog broke, fixed 
Entry  Mon Aug 29 18:24:11 2011, jamie, Update, SUS, ITMY stuck to OSEMs? 
    Reply  Tue Aug 30 14:44:06 2011, kiwamu, Update, SUS, ITMY released without opening chambers 
       Reply  Fri Sep 2 17:57:18 2011, kiwamu, Update, SUS, Re: ITMY released without opening chambers 
Entry  Sat Aug 20 00:42:22 2011, Keiko, Update, LSC, Tolerance of PRC, SRC, MICH length = 2 mm ? 
    Reply  Tue Aug 23 17:51:37 2011, Keiko, Update, LSC, Tolerance of PRC, SRC, MICH length = 2 mm ? 
    Reply  Fri Sep 2 04:41:35 2011, Keiko, Update, LSC, Tolerance of PRC, SRC, MICH length = 5 mm ? MATRIX.pngdphase.png
Entry  Thu Sep 1 15:59:46 2011, steve, Update, SUS, light doors on at the ITMs 
Entry  Thu Sep 1 15:07:45 2011, steve, Update, SUS, why ITMY is moving more ? itmy_srm_etmx.jpgP8220152.JPG
Entry  Thu Sep 1 11:03:22 2011, steve, Update, VAC, back ground rga scan v70-bg-d29scan.jpgvent70tempres.jpg
Entry  Fri Aug 26 15:59:33 2011, steve, Update, General, drawer cabinet moves in P1080192.JPG
    Reply  Fri Aug 26 16:17:31 2011, Jenne, Update, General, drawer cabinet moves in 
       Reply  Wed Aug 31 16:18:25 2011, Jenne, Update, General, New Optics Drawers 
Entry  Tue Aug 23 00:55:13 2011, Jenne, Update, General, IFO ready for doors 
    Reply  Wed Aug 31 14:50:18 2011, kiwamu, Update, Photos, pictures of OSEMs 
Entry  Tue Aug 30 17:31:55 2011, Suresh, Update, IOO, C1IOO model reverted and fb restarted 
Entry  Sun Aug 28 22:49:40 2011, Suresh, Update, CDS, fb down 
    Reply  Mon Aug 29 00:49:00 2011, kiwamu, Update, CDS, Re : fb down 
       Reply  Mon Aug 29 12:05:32 2011, jamie, Update, CDS, Re : fb down 
          Reply  Mon Aug 29 18:16:10 2011, jamie, Update, CDS, Re : fb down 
             Reply  Tue Aug 30 11:28:56 2011, jamie, Update, CDS, framebuilder back up 
                Reply  Tue Aug 30 14:33:52 2011, jamie, Update, CDS, all front-ends back up and running 
Entry  Tue Aug 30 11:42:29 2011, jamie, Update, CDS, testpoint.par file found to be completely empty 
Entry  Tue Aug 30 10:49:29 2011, steve, Update, SUS, BS & PRM damping restored 
Entry  Mon Aug 29 19:14:31 2011, Suresh, Update, IOO, WFS phase adjustments Screenshot-1.png
ELOG V3.1.3-