40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 97 of 344  Not logged in ELOG logo
ID Date Author Type Categorydown Subject Text Attachments
  10539   Thu Sep 25 11:38:47 2014 JenneUpdatePEMSeismometers in place[Zach, Jenne, Steve]
This work happened on Tuesday. 
Bad Jenne for forgetting to elog it!
  
  10560   Thu Oct 2 14:36:52 2014 steveUpdatePEMoil drops on vertex crane

    

       
            
 VertexOilDrops.jpg 
  10665   Tue Nov 4 10:40:46 2014 steveUpdatePEMlab temperatures and particle counts 
 
 PEM100d.png 
  10711   Thu Nov 13 22:52:48 2014 kateUpdatePEMSeismometers set up for huddle testJenne, Diego, Kate
We want to conduct a huddle test
with the three 40m seismometers (2 Guralps
 Seismic_13Nov2014.pdfseism_closed.jpgseism_open.jpg 
  10721   Sat Nov 15 21:51:09 2014 ranaUpdatePEMSeismometers set up for huddle test  In order to do high quality
huddle subtraction, we need to align the
seismometer axes to high precision. We would
  
  10761   Mon Dec 8 09:03:49 2014 steveUpdatePEMair cond maintenance tomorrow morning 
 AC maintenance is scheduled
from 8am till 11am tomorrow morning.
  
  10773   Wed Dec 10 14:26:13 2014 steveUpdatePEMair cond maintenance and particle plot

    

       
            
 05.png 
  10790   Fri Dec 12 10:38:22 2014 SteveUpdatePEMleaky roofThe first real rain of this year finds
only one leak at the 40m
 leakyroof.jpg 
  10922   Tue Jan 20 09:32:19 2015 SteveUpdatePEMdusty Monday morningYesterday morning was dusty. I wonder why?

The PRM sus damping was restored
this morning.
 dustyMorning.png 
  10939   Mon Jan 26 13:07:28 2015 JenneUpdatePEMSeismometers back in nominal placesI have just put the seismometers back into
their nominal positions, on the concreted
slabs.  The T-240 is in the vertex,
 IMG_1800.JPGIMG_1805.JPG 
  10948   Wed Jan 28 08:53:01 2015 SteveUpdatePEMSeismometer Vertex is covered 




  
  10976   Wed Feb 4 19:21:45 2015 JenneUpdatePEMSeismometer Vertex is coveredI opened up the spaghetti pot over the
vertex seismometer, and taped the cable to
the slab.  The way the cable is coiled,
  
  10983   Fri Feb 6 10:03:23 2015 SteveUpdatePEMdusty days 




 duststorm.png 
  11089   Tue Mar 3 02:43:06 2015 JenneOmnistructurePEMNo heat??It's super cold in the control room
and EE bench area tonight.  I'm
wondering if, similar to what happened on
  
  11091   Tue Mar 3 04:43:12 2015 JenneOmnistructurePEMOttavia is dead? After some searching, including help from
4 security guys (I think they don't have
a lot to do at 4:30am :), we found that 
  
  11188   Wed Apr 1 10:50:59 2015 SteveUpdatePEMconstruction aheadThe 40m fenced area will start storing
this large ~ 8000 lbs chamber on April 14.
The asphalt will be cut, jack hammered the
 largeMITchamber.jpg 
  11203   Mon Apr 6 09:13:49 2015 SteveUpdatePEMjackhammering at ETMX


 jackhammerCalb.pngjackHcalETMX.jpgjackHetmx.png 
  11204   Mon Apr 6 13:23:40 2015 ranaUpdatePEMjackhammering at ETMXUnfortunately, this kind of trend plot
is not detailed enough to know if something
has gone bad in a quantitative way. But at
  
  11205   Tue Apr 7 04:17:42 2015 JenneUpdatePEMjackhammering at ETMXQ is writing the locking elog for the night,
but just to reply to this thread:  The
IFO worked well tonight, so things are at
  
  11211   Thu Apr 9 07:41:22 2015 SteveUpdatePEMjackhammering at ETMXThere was a period of short unexpected
jackhammering this morning. I asked them
to stop.
 moreJackHam.pngGTRX.jpg 
  11217   Tue Apr 14 11:19:52 2015 SteveUpdatePEMlarge chamber has arrivedIt is here.




 ETMXfriend.png8000lbs.png 
  11259   Mon Apr 27 09:09:15 2015 SteveUpdatePEMair cond filters checked 




 400d.png 
  11268   Sun May 3 01:04:19 2015 ranaSummaryPEMSeismo signals are badhttps://ldas-jobs.ligo.caltech.edu/~max.isi/summary/day/20150502/pem/seismic/

Looks like some of our seismometers
are oscillating, not mounted well, or something
  
  11289   Wed May 13 10:07:36 2015 ranaFrogsPEMGuralp breakout paddleReward being offered for the safe return
of this thing:

 100000000000040B000007E373805766.png 
  11290   Wed May 13 13:33:34 2015 SteveFrogsPEMGuralp breakout box recoveredCOD_Sugar napolion is due to Steve: 
Item delivered, model CMG-SCU-0013, sn G9536

  
  11291   Thu May 14 17:41:10 2015 ranaUpdatePEMweather station and Guralp maintenanceToday Steve and I tried to recenter the
Guralps. The breakout box technique didn't
work for us, so we just turned the leveling
 GurPost_150514.pngsecretWeatherTrends.png 
  11295   Sat May 16 21:40:29 2015 ranaUpdatePEMGuralp maintenanceTried swapping cables at the Guralp interface
box side. It seems that all of our seismic
signal problems have to do with the GUR2
 GurPost_150516.png 
  11309   Tue May 19 11:50:52 2015 manasaUpdatePEMNo noticeable effect from M4.0 earthquakeThere was an earthquake: M4.0
- 40km SSW of South Dos Palos, California 

No noticeable effects on the IFO.
  
  11316   Tue May 19 19:24:30 2015 ranaUpdatePEMSeismic BLRMS filtersI was wondering about the design of the
BLRMS fitlers for the seismic channels since
the STS ones seem to have so little gain
 BLRMS_BP.pdfBLRMS_imp.pdf 
  11324   Tue May 26 11:05:10 2015 SteveUpdatePEMworked around ETMY seism.The cable tray holder cross beam is removed
and cut short for good access to seismometer.
 ETMYseismic.pngcut.jpg 
  11329   Thu May 28 10:42:19 2015 SteveUpdatePEMbad Guralp X-cable


 Gurs180dXbad.pngswappedGurs.png 
  11330   Thu May 28 15:10:44 2015 ranaUpdatePEMSeismic ConfusionYou are plotting the STS channels,
not Guralp. These are for the Trillium
240 seismometer.
  
  11331   Thu May 28 16:43:52 2015 SteveUpdatePEMGuralps swappedKoji and Steve,

The result: bad Guralp x-arm cable.

I will swap the short cables tomorrow
 GursSwapped.png 
  11341   Mon Jun 1 15:22:19 2015 SteveUpdatePEMGuralps X- short cable is bad 




 seismGur1-2.png 
  11345   Wed Jun 3 17:04:08 2015 ericqUpdatePEMWilcoxon Accelerometer Huddle TestI've set up the Wilcoxon accelerometers
on the SP table for a huddle test, to estimate
their noise levels. 
 AccHuddle.jpg 
  11350   Wed Jun 10 02:50:39 2015 ericqUpdatePEMWilcoxon Accelerometer Huddle TestHere are some results for the 3-corner
hat subtraction for the six accelerometers,
from ~1 hour of data that didn't
 hats2Acc.png3hatcode.zip 
  11359   Mon Jun 15 16:55:39 2015 ericqUpdatePEMAccelerometers installedThe accelerometers have been installed
at MC1 and MC2. MC2 data is live, I haven't
yet run the cables from the MC1 set to the
 MC2.jpgMC1.jpgmc2accspectra.png 
  11362   Wed Jun 17 15:31:50 2015 ericqUpdatePEMAccelerometers fully installedMC1 accelerometer has been plugged in.
The modecleaner locking has been intermittent
today, but I looked at a 15 minute lock in
 IMCcoherence_Jun172015.xml.zipIMCcoherence.png 
  11367   Sun Jun 21 13:21:03 2015 ranaUpdatePEMWilcoxon Accelerometer Huddle TestTo improve our sensor
noise estimate, the ACC cables should
be clamped using a rubber pad and a big dog
  
  11372   Tue Jun 23 11:18:20 2015 SteveUpdatePEMcleaning around chambersKeven is our regular janitor is out for
a few weeks.

The sub is careful- gentel Mario.
  
  11388   Wed Jul 1 11:45:48 2015 SteveUpdatePEMcleaning around ETMX chamber


  
  11391   Sun Jul 5 18:14:13 2015 IgnacioUpdatePEMWilcoxon Accelerometer Huddle TestUpdated: On Thursday/Friday (sorry
for late elog) I was messing with Eric's
Wilcoxon 731A accelerometer huddle test data
 8x 
  11439   Thu Jul 23 15:41:41 2015 SteveUpdatePEMfitting ants with TERROPasadena got 0.2" of  rain on
Saturday. Temperatures were high with high
humidity since than.The ants were back in
  
  11446   Fri Jul 24 23:08:53 2015 IgnacioUpdatePEMMC1 accelerators moved for future huddle testI have moved the MC1 accelerators and cable
to the huddle test set up, in order to see
how a six witness huddle test with the improved
 image1.JPG 
  11460   Wed Jul 29 17:51:56 2015 IgnacioUpdatePEMAccelerators moved back to MC1 and MC2We are done taking accelerator huddle test
data. So I moved back all six accelerometers
and cables to MC1 and MC2. I also relabel
 FullSizeRender.jpgFullSizeRender_2.jpg 
  11464   Thu Jul 30 10:38:18 2015 SteveUpdatePEMY sesimostation is back onKoji soldered new 50" long cable for
the Y station.

 
 Guralps_are_back_on.pngYstation.jpg 
  11466   Thu Jul 30 13:34:52 2015 KojiUpdatePEMY sesimostation is back onPlease check the spectra. If something
is wrong, please swap the cables between
X and Y in order to see if the cable is still
  
  11469   Thu Jul 30 15:24:54 2015 SteveUpdatePEMY sesimostation is back onAtm1,  New short-50" long cable
was installed at ETMY end ( Y-station ) between
Guralp-B ( MIT ) and granite base.
 NewShortCable-Y-B-Gur2.pnginterfaceInputSwapped.pngsameasAtm2.png 
  11473   Fri Jul 31 10:36:22 2015 SteveUpdatePEMX seismo station short cable removed 




 IMG_0009.JPG 
  11475   Sat Aug 1 20:46:29 2015 KojiUpdatePEMX seismo station short cable removedOMG   
ELOG V3.1.3-