Entry  Mon Oct 18 18:33:46 2010, Koji, Summary, COC, Summary of the main mirrors & their phasemap measurement 
Entry  Tue Oct 19 22:37:28 2010, Koji, Update, PSL, PSL table cleaning up 
    Reply  Thu Oct 21 13:05:19 2010, Koji, Summary, Computers, elog change and rossa tex 
Entry  Thu Oct 21 18:45:50 2010, Koji, Update, PSL, Found the beat at 1064nm 
    Reply  Fri Oct 22 01:23:13 2010, Koji, Update, PSL, Found the beat at 1064nm 101021_beat.pdf
    Reply  Mon Oct 25 02:14:38 2010, Koji, Summary, Locking, setup for green beat 
    Reply  Mon Oct 25 02:23:47 2010, Koji, Configuration, elog, ELOG 2.8.0 
    Reply  Mon Oct 25 02:25:21 2010, Koji, Update, PSL, Quarter Wave Plate Measurements 
Entry  Mon Oct 25 23:10:06 2010, Koji, Update, IOO, MC is now flashing 
    Reply  Mon Oct 25 23:59:37 2010, Koji, Configuration, elog, ELOG 2.8.0 -> ELOG 2.7.5 
    Reply  Tue Oct 26 10:50:08 2010, Koji, Configuration, elog, ELOG 2.8.0 -> ELOG 2.7.5 -> ELOG 2.8.0 
    Reply  Thu Oct 28 11:54:31 2010, Koji, Update, Green Locking, checked frequency counter SR620 
Entry  Fri Oct 29 01:18:03 2010, Koji, Summary, SUS, PRM standoff glued IMG_3674.jpg
Entry  Fri Oct 29 04:24:34 2010, Koji, Update, IOO, PMC output increased: need attention 
    Reply  Sat Oct 30 14:35:43 2010, Koji, Summary, CDS, CDS time delay measurement CDS_system_investigation_090323.pdf
    Reply  Mon Nov 1 16:43:24 2010, Koji, Summary, CDS, CDS time delay measurement 
Entry  Tue Nov 2 16:24:07 2010, Koji, Update, Auxiliary locking, Alignment for the green in the X trans table  
    Reply  Wed Nov 3 03:00:47 2010, Koji, Summary, Green Locking, coarse locked green beat frequency 
Entry  Sat Nov 6 00:49:04 2010, Koji, Update, IOO, IMC table work 
Entry  Mon Nov 8 10:37:14 2010, Koji, Update, IOO, The 10% pick-off for MCREFL was replaced to a HR mirror 
    Reply  Wed Nov 10 11:46:19 2010, Koji, Summary, IOO, limitation of current MC aligning 
    Reply  Wed Nov 10 14:28:33 2010, Koji, Summary, IOO, limitation of current MC aligning 
    Reply  Thu Nov 11 11:51:30 2010, Koji, Summary, CDS, found poor contact of DAC cable, previous A2L results were wrong 
    Reply  Thu Nov 11 23:35:23 2010, Koji, Summary, CDS, found poor contact of DAC cable, previous A2L results were wrong IMG_3698.jpgbad-boys.pngIMG_3705.jpgIMG_3706.jpg
    Reply  Fri Nov 12 19:24:56 2010, Koji, Update, CDS, Test of ADC noise 
Entry  Mon Nov 15 14:36:37 2010, Koji, Update, PSL, C1PSL rebooted?  
Entry  Mon Nov 15 15:02:00 2010, Koji, Summary, PSL, power measurements around the PMC 
    Reply  Fri Nov 19 15:51:50 2010, Koji, Update, Electronics, REFL55 Characterizations 
Entry  Tue Nov 23 10:48:31 2010, Koji, Update, IOO, the plan of the day 
    Reply  Mon Dec 6 11:57:21 2010, Koji, Summary, all down cond., power outage 
Entry  Wed Dec 15 12:46:18 2010, Koji, Summary, IOO, Finishing up the vac work 
    Reply  Wed Dec 15 14:23:32 2010, Koji, Update, CDS, ETMY IO chassis update 
Entry  Wed Dec 15 23:10:40 2010, Koji, Update, IOO, SRM Oplev / Dark Steering mirrors installed 
Entry  Fri Dec 17 00:30:05 2010, Koji, Update, IOO, ITMY / SRM / BS / PRM OPLEVs aligned 
Entry  Fri Dec 17 00:55:30 2010, Koji, Update, IOO, The dark port beams reached the AP table 
    Reply  Sat Dec 18 23:33:06 2010, Koji, Update, elog, restarted 
    Reply  Sun Dec 19 11:19:42 2010, Koji, Update, elog, restarted 
Entry  Mon Dec 20 10:47:29 2010, Koji, Update, IOO, Plan for closing the vacuum chambers 
Entry  Wed Dec 22 15:47:22 2010, Koji, Update, VAC, Tank closing procedure 
    Reply  Thu Dec 23 03:15:11 2010, Koji, Update, elog, elogd is getting killed by Suresh 
Entry  Thu Dec 23 22:13:50 2010, Koji, Update, General, PZT HV turned on 
    Reply  Tue Jan 4 11:06:32 2011, Koji, Update, IOO, Power into Mode Cleaner increased 
    Reply  Wed Jan 5 10:45:51 2011, Koji, Update, elog, restarted 
    Reply  Thu Jan 6 00:03:05 2011, Koji, Update, Cameras, Aligned the Xarm, no big deal 
    Reply  Thu Jan 6 10:47:11 2011, Koji, Update, elog, ELOG fixed (re: restarted) 
    Reply  Wed Jan 12 01:38:52 2011, Koji, Update, IOO, Put MC PZT offset onto MC board, instead of on awkward cart 
Entry  Wed Jan 12 22:19:54 2011, Koji, Update, IOO, MC flakiness solved 
Entry  Fri Jan 14 12:29:57 2011, Koji, Update, Locking, Next steps for the green 
    Reply  Fri Jan 14 12:34:08 2011, Koji, Update, LSC, X arm locked with C1LSC digital control 
    Reply  Wed Jan 19 10:45:00 2011, Koji, Update, Electronics, POX Transfer Functions 