Entry  Fri Sep 16 16:34:54 2011, Paul, Update, SUS, ITMY SRM oplev telescope plan ITMY_SRM_telescope.png
I've calculated a suitable collimating telescope for the ITMY/SRM oplev laser, based on the specs for the soon-to-arrive 2mW laser (model 1122/P) available
here: http://www.jdsu.com/ProductLiterature/hnlh1100_ds_cl_ae.pdf
Based on the fact that the 'beam size' value and 'divergence angle' value quoted don't match up, I am assuming that the beam radius value of 315um
Entry  Thu Sep 15 15:11:38 2011, kiwamu, Update, SUS, f2a filters on BS and PRM PRMf2a.pngBS_f2a.png
The f2a filters were newly designed and installed on BS and PRM. 
So the lock of PRMI will be more stable .
    Reply  Fri Sep 16 16:29:05 2011, kiwamu, Update, SUS, f2a filters on SRM F2ASRM_Sep16.png
New f2a filters were installed on SRM.
The lock of DRMI should be more stable than last night.


    
        
            
Entry  Fri Sep 16 16:07:28 2011, steve, Update, SAFETY, visitors safety training P1080241.JPG
Paul, Mirko and Katrin visiting grad students received the 40m basic safety training.
Entry  Fri Sep 16 14:43:43 2011, Suresh, Update, Computer Scripts / Programs, Changed c1ioo model and restarted fb 
I had to change the c1ioo model and restart the fb since the paths allowing us to select various signals to demodulate using the lockins were not correct.
The signal selection vector was not flexible enough to permit us to select the signals to demod.
fb was restarted twice at following times.  The changes have been commited to the svn.
Entry  Fri Sep 16 14:03:53 2011, Paul, Update, SUS, SRM oplev QPD noise measurement SRM_oplev_dark_noise_vs_bright_noise.pdfSRM_ITMY_QPD_dark_noise_comparison.pdf
 I checked the dark and bright noise of the SRM oplev QPD. The SRM QPD has a rather high dark level for SUM of 478 counts. The dark noise for the
SRM QPD looked a little high in the plot against the bright noise (see first attachment), so I plotted the dark noise with the ITMY QPD dark noise (see
second attachment). It seems that the SRM QPD has a much higher dark noise level than the ITMY! In case anyone is wondering, to make these traces I record
Entry  Fri Sep 16 03:22:11 2011, Anamaria, Update, LSC, More Refl PDs Work and Attempt at DRMI 
Kiwamu, Keiko, Anamaria
I started today with a different input beam, so I had to realign the REFL path again. Then we measured the RF signal out of the 4 REFL PDs and
found them to be too low. We increased the power to around 10mA for each diode, and we can see the right modulation frequency on each diode, though REFL165
Entry  Fri Sep 16 00:08:30 2011, Paul, Update, SUS, ITMY Oplev QPD dark and bright noise spectra ITMY_oplev_dark_noise_vs_bright_noise.pdf
 I tried again at plotting the ITMY_QPD noise spectra in for dark and bright operation. Before we had the strange situation where the dark noise
seemed higher, but Kiwamu noticed this was caused by dividing by the SUM before the testpoint I was looking at. This time I tried just multiplying by the
measured SUM for bright and dark to normalise the spectra against each other. The results looks more reasonable now, the dark noise is lower than the bright
Entry  Thu Sep 15 22:26:32 2011, Paul, Update, SUS, ITMY Oplev QPD dark noise PSD ITM_dark_QPD_PSD.pdf
 I took a dark noise measurement for the ITMY QPD, for comparison with measurements of the oplev noise later on. Initially I was plotting the data
from test points after multiplication by the oplev matrix (i.e. the OLPIT_IN1 / OLYAW_IN1), but found that the dark noise level seemed higher than the
bright noise level (!?). Kiwamu realised that this is because at that test point the data is already divided by QPD SUM, thus making the dark noise level
Entry  Thu Sep 15 21:56:01 2011, Mirko, Update, CDS, c1oaf check, possible shmem problem c1lsc_to_c1oaf_via_shmem.pngc1oaf_to_c1lsc_via_shmem_fixed_sine_inj_at_100Hz.pngc1oaf_to_c1lsc_via_shmem_white_noise_inj.pngc1pem_to_c1oaf_via_rfm.pngc1lsc_to_c1oaf_via_shmem.png
After Jamie installed the c1oaf model ( entry 5424 ) I went and checked the intermodel communication.
Remember the config is:

c1lsc ->SHMEM-> c1oaf
c1oaf ->SHMEM-> c1lsc
c1pem ->SHMEM-> c1rfm ->PCIE-> c1oaf

I checked at least one of
Entry  Thu Sep 15 20:30:52 2011, Mirko, Update, LSC, Plan for long term optical spec. analyzer setup DSC_3430b.jpg
Just to give some heads up on how the setup on the PSL table does / will look. We start out with one of the two reflections of a window. Power about
2mW.
Entry  Thu Sep 15 20:16:15 2011, jamie, Update, CDS, New c1oaf model installed and running 
[Jamie, Jenne, Mirko]
New c1oaf model installed
We have installed the new c1oaf (online adaptive feed-forward) model.  This model is now running
on c1lsc.  It's not really doing anything at the moment, but we wanted to get the model running, with all of it's interconnections to the other models.
Entry  Thu Sep 15 18:24:54 2011, Paul, Update, SUS, ITMY and SRM Oplev current status - comparison with ITMY oplev_spectra_comparison.pdf
Just to find out where we are currently, I plotted the ITMY and SRM oplev spectra along with the ETMY oplev spectra. ETMY seems to be very good, so comparing
with this seemed useful, so we know how much we have to improve by. The SRM power spectrum appears to be around 2 orders of magnitude higher than ETMY
over pretty much the whole measurement band. The ITMY power spectrum is not so bad as the SRM above about 60Hz. Next thing to do is to check the dark noise
    Reply  Thu Sep 15 18:31:27 2011, Paul, Update, SUS, ITMY and SRM Oplev current status - comparison with ITMY 


    
        
            Quote:
        
        
            

           Just to find out where we are currently, I plotted the ITMY and SRM oplev spectra along with the ETMY oplev spectra. ETMY seems to be very
Entry  Thu Sep 15 17:12:29 2011, Mirko, Update, LSC, RF modulation depth measurement 
[Mirko, Kiwamu]
Put up a temp. setup on the laser table to measure the RF modulation depths using the optical spectrum analyzer. First with a pickoff beam with
about 2mW => SNR of 8 of 1 peak per FSR.
Entry  Thu Sep 15 17:00:10 2011, Paul and Steve, Update, SUS, New ITMY and SRM oplev plan oplev_plan1.png
 We have made a new plan for the ITMY and SRM oplev optical path which uses as few optics as possible. This should help to reduce coupling from
vibrations of optics in the oplev path back into the GW channel. To get enough room for the turning mirror into the SRM it might be necessary to move the
POY optics a bit nearer to the tank. 
Entry  Thu Sep 15 16:45:59 2011, Paul, Update, SUS, ITMY and SRM Oplev status 
Today I worked on getting the ITMY and SRM oplevs back in working order. I aligned the SRM path back onto the QPD. I put excitations on the ITMY and
SRM in pitch and yaw and observed the beam at the QPDs to check for clipping. They looked clean from clipping.
 
Measurements of the beam power at various points:
 
Straight after the laser - 7.54mW
After
Entry  Thu Sep 15 11:37:24 2011, Suresh, Update, Computer Scripts / Programs, fb restarted at Thu Sep 15 11:30:30 PDT 2011 
I changed a filter bank name (C1IOO-WFS1_PIT) in c1ioo model reverting it to its earlier name.  Had to restart c1ioo model and the fb
Entry  Wed Sep 14 07:51:20 2011, steve, Update, SUS, PRM damping restored 
The PRM damping was restored at side sensor var 1050
    Reply  Thu Sep 15 07:28:08 2011, steve, Update, SUS, PRM damping restored 


    
        
            Quote:
        
        
            
            The PRM damping was restored at side sensor var 1050
Entry  Thu Sep 15 01:17:10 2011, Keiko, Update, LSC, MICH locked and attempt to lock PRCL 
 Anamaria, Keiko
- We aligned MICH and were successfully locked MICH using AS55Q. The other mirrors were misaligned so that the other degrees of freedom
didn't exist. AS55 was fed back to BS. The f2a filters on BS suspension were required to lock, because the pos feedback was unbalanced to angle degrees
    Reply  Thu Sep 15 02:18:19 2011, Anamaria, Update, LSC, MICH locked and attempt to lock PRCL 
Kiwamu, Keiko, Anamaria
 
We were able to lock PRC using REFL11I after improving the MICH dark fringe a bit (moving BS) and rotating AS55 and REFL11 such that the signal
Entry  Wed Sep 14 22:07:41 2011, rana, Update, SUS, ITM Oplevs are broken mm.jpg
I went to see what was wrong with the ITMs and found that people have been working on them and have left them in a broken state with no elog entry.
This is sad and unacceptable.
Whoever is working on these should post into the elog what the Oplev layout plan is,
have someone check it, and ONLY THEN get to work on it.
Entry  Tue Sep 13 03:18:14 2011, kiwamu, Update, LSC, Y arm locking prep image.png
(Preparation of Y arm locking)
(A) The f2a filters were newly designed and applied to ETMY (see the attachment)
(B) Once the Y arm is aligned such that the TEM00 mode flashes, the transmitted light is visible on the
    Reply  Tue Sep 13 19:31:09 2011, kiwamu, Update, LSC, Y arm locking prep Yarmlocked.png
The Y arm has been locked with AS55. 
A next thing is to check the spot positions on the ETMY and ITMY mirrors so that we can evaluate the recent
beam pointing.
       Reply  Wed Sep 14 01:17:51 2011, kiwamu, Update, LSC, measurement of spot position on Y arm misposition.png
The spot positions on ITMY and ETMY were measured using the LOCKIN modules in
C1ASS when the Y arm stayed locked.
The beam was successfully aligned such that it hits the center of the ETMY mirror.
          Reply  Wed Sep 14 15:00:00 2011, kiwamu, Update, LSC, measurement of spot position on Y arm DSC_3408_small.jpg
Forgot to attach a picture of the ITMY's face camera when it was locked. 
The horizontal position of the spot looks good, but the vertical position is apparently too low, which agrees with the A2L result.
    Reply  Wed Sep 14 21:18:45 2011, kiwamu, Update, LSC, Y arm locking prep 
Although we did some of the Input Matrix diagonalization, we have not yet actually used this knowledge. As a result all of the optics are shaking all
over the place. 
Sunshine Task: Set the input matrices to their calculated values and then adjust the OSEM damping gains for all optics so
Entry  Wed Sep 14 20:04:05 2011, jamie, Update, CDS, Update to frame builder wiper.pl script for GPS 1000000000 
I have updated the wiper.pl script (/opt/rtcds/caltech/c1/target/fb/wiper.pl) that runs on the framebuilder (in crontab) to delete old frames in case
of file system overloading.  The point of this script is to keep the file system from overloading by deleting the oldest frames.  As it was,
it was not properly sorting numbers which would have caused it to delete post-GPS 1000000000 frames first.  This issue was identified at LHO, and
Entry  Wed Sep 14 14:06:44 2011, kiwamu, Update, General, minutes of 40m meeting : plans 
+ Optical lever (Steve/Paul)
+ LSC demod board (Keiko)
+ DRMI locking (Keiko / Anamaria)
Entry  Wed Sep 14 01:19:20 2011, Anamaria, Configuration, LSC, 3f PD Install in Progress 
I have reconfigured the refl beam path on the AP table to include REFL33 and REFL165. Would be done if we hadn't prepared P BSs instead of S, which required
some serious digging to find two others. And if someone hadn't stolen our two 3m SMA cables that Keiko and I made on our previous visit and I had
left with the 3f PDs. I don't expect them to reappear but if they do, it would be grand.
Entry  Tue Sep 13 19:12:53 2011, Suresh, Update, Computer Scripts / Programs, changes to the c1ioo, c1mcs and c1rfm 
[Suresh, Jamie]
The new versions of these three models have been committed to the svn.  I copy below the svn log I wrote over there.
I edited three models,namely c1ioo, c1mcs and c1rfm to bring four channels from C1MCS model into the
Entry  Tue Sep 13 19:04:58 2011, Suresh, Update, Computer Scripts / Programs, Restarted Frame builder several times while compiling c1ioo, c1mcs and c1rfm 
I restarted the frame builder at the following times
 
Tue Sep 13 14:53:49 PDT 2011
Entry  Sat Sep 10 19:03:57 2011, rana, Update, LSC, Y Arm work 
I lined up the Y Arm for locking and then centered the oplevs for ETMY and ITMY.
* The ITMY OL has still got the old style laser. Steve, pleaes swap this one for a HeNe. Also the optical layout seems strange: there are two copies
of the laser beam going into the chamber (??). Also, the QPD transimpedance needs to be increase by a factor of ~10. We're only getting ~500 counts per
    Reply  Sat Sep 10 19:45:29 2011, Jenne, Update, LSC, Y Arm work 


    
        
            Quote:
        
        
            

            * ITMY OL: Also the optical layout seems strange: there are two copies of the laser beam going into the chamber (??). 
    Reply  Tue Sep 13 16:57:44 2011, steve, Update, LSC, ITMX oplev ** 


    
        
            Quote:
        
        
            

           I lined up the Y Arm for locking and then centered the oplevs for ETMY and ITMY.
Entry  Tue Sep 13 09:16:00 2011, Suresh, Update, IOO, MC spots recentered and input beam aligned mcdecenter20110912_1.pngmcdecenter20110912_2.png
The shift of MC2 which Rana noted caused the beam spots on the MC mirrors to decenter. I used
the mcassUp and mcassOn scripts and checked the output of the C1IOO lockins to get the spot positions.  I first tried to realign just the MC2 to recenter
the spots.  But this was not sufficient.  I then worked on the pitch of all three optics since it is easier to align.   By the time
Entry  Mon Sep 12 23:45:14 2011, Suresh, Configuration, Computer Scripts / Programs, StripTool does not scale properly on Pianosa 
When I run StripTool on Pianosa, I get the following message
==== StripTool Xt Warning Handler ====
warning:         Axis: minVal is greater than or equal to maxVal
Entry  Mon Sep 12 18:45:04 2011, Anamaria, Configuration, LSC, AP table current layout 40mAPtable.pdf
Before we install the REFL 3f PDs I made a drawing of the current table layout, since there has been no update lately. Once I've incorporated the two
extra PDs (now seen sitting bottom left), I will update the drawing and post in the wiki as well.
Entry  Sat Sep 10 20:30:01 2011, rana, Update, IOO, MC trans re-aligned / MC2 shifted mysteriously / MC2 re-aligned MCdecenter.png

I re-aligned the beam onto the MC TRANS QPD since Kiwamu had centered the spots on the mirrors. However, I then inspected the MC2F camera. After
Entry  Sat Sep 10 18:52:45 2011, rana, Update, Computers, conlog getting filled up 
One of the reasons that conlog seems so slow lately is that its been writing 100's of MB of .log files every day since early summer. It looks like the
people who have been working on the mdl builds have not been properly adjusting the conlog channel lists. When this is not done conlog just gets filled
up with non-control channels like OUT, OUTPUT, OUTMON, etc.
Entry  Sat Sep 10 01:36:15 2011, kiwamu, Update, ASC, interferometer coarsely aligned 
The interferometer was coarsely aligned.
Now spatially overwrapped DRMI and FP arm fringes are visible on the AS camera although the incident beam
alignment was done only with PZT2.
Entry  Fri Sep 9 16:16:59 2011, kiwamu, Update, IOO, spot positions on MC mirrors (in-vac) 
The spot positions on the MC mirrors were measured in the vacuum condition.
The obtained spot positions are quite bad and roughly at 2-3 mm level.
 We
    Reply  Fri Sep 9 20:52:59 2011, kiwamu, Update, IOO, spot positions on MC mirrors (in-vac) 
The spot positions on the MC mirrors were readjusted.
All the amount of the off-center became smaller than 2 mm, which meet requirements of the beam clearance
on the Faraday.
Entry  Fri Sep 2 13:12:08 2011, kiwamu, Update, IOO, triple resonant box : ready to install refl_eom.png
The triple resonant box was checked again. Each resonant frequency was tuned
and the box is ready to go.
Before the actual installation I want to hear opinions about RF reflections
    Reply  Fri Sep 2 15:56:32 2011, Koji, Update, IOO, triple resonant box : ready to install 
What are the reflected RF powers for those frequencies? 
Is the 29.5MHz more problem than the 55MHz, considering the required modulation depth?
 
       Reply  Sat Sep 3 14:47:50 2011, kiwamu, Update, IOO, triple resonant box : brief estimations about reflections and mode. depths 
(RF reflections)
The reflected RF power going back to the RF generation box will be :
    Power at 11MHz =  2 dBm
          Reply  Wed Sep 7 22:17:04 2011, rana, Update, IOO, RF Amp for EOM on PSL Table 
After Steve pointed out the 'deep hoop' issue,
we decided to examine putting an RF Amp on the
PSL table, between the RF combiner and the triple resonant box.
             Reply  Fri Sep 9 19:15:17 2011, rana, Update, IOO, RF Amp for EOM on PSL Table 


    
        
            Quote:
        
        
            
            After Steve pointed out the 'deep hoop'
Entry  Fri Sep 9 14:55:03 2011, kiwamu, Update, SUS, OSEM pictures on ITMs 
The OSEM pictures taken in Sep/6 have been uploaded to Picasa.
https://picasaweb.google.com/foteee
Entry  Fri Sep 9 11:59:58 2011, kiwamu, Update, IOO, PZT1 doesn't work 
Last night I noticed that PZT1 didn't work properly
I am not sure what is going on. Today I will try localizing the cause
    Reply  Fri Sep 9 13:29:09 2011, kiwamu, Update, IOO, a history of PZT mirror 
Something happened about 8 years ago.
Old
iLog entry by AJW (2003/Sep/8)
Entry  Thu Sep 8 20:13:24 2011, kiwamu, Update, IOO, MC is back to full power 
[Suresh / Kiwamu]
 The attenuator was removed and now the MC is happily locked with
the full power of 1.2 W.
Entry  Wed Sep 7 12:03:49 2011, steve, Update, VAC, Pump down has started 
Jamie and Steve
We closed ITMX and ITMY chambers and started pumping around 11am
What we did before:
    Reply  Wed Sep 7 18:19:37 2011, steve, HowTo, VAC, stop pump down for overnight 


    
        
            Quote:
        
        
            
            Jamie and Steve
       Reply  Wed Sep 7 21:45:16 2011, kiwamu, Update, VAC, pump stopped. Pressure is at 450 mtorr vacuum.png
I stopped puming at 9:30 PM and the pressure in P1 is at 450 mtorr.
I followed exactly he procedure that Steve noted on his elog entry.
Here is a plot of the histroy of our pumping today.
       Reply  Thu Sep 8 10:50:44 2011, steve, Update, VAC, pumpdown #71 comleted pd#71.jpgmaglevpd.jpg
Vacuum status:  " vacuum normal"   CC1 pressure 5e-5 Torr
Slow roughing through butterfly valve took 11 hours at 1-2 Torr/min speed.  We had a leak at the metal hose connecting o-ring  that became
visible  at 200 Torr.
Entry  Wed Sep 7 20:44:11 2011, Suresh, Update, elog, restarted 
Elog crashed / dormant for long time.  A look at the log file indicated that it was busy generating png thumbnails for pdf files.
Restarted at Wed Sep  7 20:41:13 PDT 2011
 
Entry  Fri Jul 29 16:25:06 2011, kiwamu, Update, ASC, beam axis and Y arm aligned 
Last night I aligned the incident beam axis and the Yarm by touching the PZT
mirrors and the suspensions.
    Reply  Sat Jul 30 06:24:06 2011, kiwamu, Update, ASC, Y arm ASS fixed 
The servos of C1ASS for the Y arm and the beam axis alignments were fixed.
Now we can correctly run the Y arm ASS from the C1IFO_CONFIGURE window
as usual.
       Reply  Sat Jul 30 21:04:23 2011, kiwamu, Update, ASC, Y arm ASS fixed 
The X arm ASS was also fixed. So both X and Y arm ASS are now back to normal.
Now we can align the arms any time from the buttons on the C1IFO_CONFIGURE window.
 
       Reply  Sun Jul 31 00:05:52 2011, kiwamu, Update, LSC, script for loss measurement : modified 
I modified the script armloss so that the channel names in the script are properly adopted
to the new CDS.
Additionally I disabled the ETMX(Y)_tickle command in the script.
          Reply  Sun Jul 31 22:35:35 2011, kiwamu, Update, LSC, arm loss measurement : done 
I did the measurement of the arm loss on both X and Y arm by running the armLoss script.

The results will be posted later.
             Reply  Wed Sep 7 16:21:35 2011, kiwamu, Update, LSC, arm loss measurement : resluts Yarmloss.pngXarmloss.png
Here are the results of the arm loss measurements, which I have done before the vent.
I ran the existing matlab script, called 'armLoss.m', to estimate the loss. The script resides in /scripts/LSC.

(Y arm)
                Reply  Wed Sep 7 17:28:41 2011, kiwamu, Update, LSC, X arm loss measurement : not good Xarmlossmeasurement.png
The measurement itself wasn't good.
I looked at the full 2 kHz data which was taken during the time when I was running the arm loss script on the X arm.
The plot below shows the raw data. The X arm was locked and unlocked sequentially several times.
Entry  Tue Sep 6 22:51:53 2011, rana, Summary, Cameras, All Camera setups a need upgrading 
I just tried to adjust the ETMY camera and its not very user friendly = NEEDS FIXING.
* Camera view is upside down.
* Camera lens is contacting the lexan viewport cover; this means the focus cannot be adjusted without misaligning the camera.
    Reply  Wed Sep 7 13:28:25 2011, steve, Summary, Cameras, All Camera setups a need upgrading 


    
        
            Quote:
        
        
            
            I just tried to adjust the ETMY camera and its not very user friendly = NEEDS FIXING.
Entry  Wed Sep 7 09:21:57 2011, jamie, Update, SUS, SUS spectra before close up 9x
Here are all suspension diagonalization spectra before close up. Notes:

    TMX looks the worst, but I think we can live with it.  The large glitch in the UL sensor at around 999423150 (#5355) is worrying.  However,
it seemed to recover.  The spectra below were taken from data before the glitch.
    ITMY has a lot of imaginary components.  We previously found
Entry  Wed Sep 7 08:14:01 2011, steve, Update, SUS, final OSEM check finalcheck.jpgITMX10min.jpgfinalsum.png
All fine, except ITMX_sensor_UL's  60  counts deep hoop for an hour.
Entry  Wed Sep 7 00:47:51 2011, Jenne, Update, VAC, PUMP is a GO! 
Steve and Jamie:  After Jamie checks the ITM free swingings, please put
on the ITM heavy doors and start the pump!  For real this time!!! Yeah!
Entry  Wed Sep 7 00:44:51 2011, Jenne, Update, SUS, Freeswing all 
I just started a freeswing all, as a final check before we pump:

Wed Sep  7 00:43:21 PDT 2011
Entry  Wed Sep 7 00:39:34 2011, rana, Update, SUS, ITMX adjustments 
(What we did)
* Moved SUS to edge of table for OSEM adjustment.
* Leveled the table in this temporary tower position.
Entry  Wed Sep 7 00:01:23 2011, Suresh, Update, IOO, ITMY chamber ready for heavy doors 
[Jenne, Suresh]
We did the following things in the ITMY chamber today:
1) We tried to get the ITMY stuck again by adjusting the coil gains so that it goes into the orientation where it used to get stuck.  We (reassuringly)
Entry  Tue Sep 6 21:33:21 2011, Jenne, Update, SUS, Diagonalizability of ITMX and ITMY is acceptable ITMX.pngITMY.png
[Rana and Kiwamu on ITMX, Jenne and Suresh on ITMY, Zombie/brains meeting on accepting the matricies]
 

    
        
            Optic
            Spectra
Entry  Tue Sep 6 21:00:48 2011, Zach, Update, elog, elog restarted 
I restarted the elog with the script as it was not up when I tried to make a post. It was again unresponsive when I went to submit, but this time the
script couldn't restart it. The log said it couldn't bind to 8080, which usually happens if the daemon is still running. I pkilled it, then reran the script,
and it appears to be working.
Entry  Tue Sep 6 17:43:01 2011, Suresh, Update, IOO, Free Swing ITMY started 
Free swing of ITMY started at
Tue Sep  6 17:41:43 PDT 2011
 
    Reply  Tue Sep 6 17:56:53 2011, Jenne, Update, IOO, Free Swing ITMY started 


    
        
            Quote:
        
        
            
            Free swing of ITMY started at
ELOG V3.1.3-