40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 93 of 341  Not logged in ELOG logo
Entry  Wed Jul 15 18:35:11 2009, Stephanie, Update, General, Multiply Resonant EOM Update BuiltCkt1_Final.pngBuiltCkt1_TransferFunctions.png
    Reply  Thu Jul 16 01:00:56 2009, Alberto, Update, Locking, PD9 aligned 2009-07-15_PD9spectrumPDF02.pdf
    Reply  Thu Jul 16 09:49:52 2009, Alan, Update, Computers, fb40m  
Entry  Thu Jul 16 10:52:58 2009, Clara, Update, PEM, Single Channel TRS-RNC Cable 
    Reply  Thu Jul 16 14:41:38 2009, rob, Update, Locking, MC_F channel dead IOO_ICS_0_15.pngIOO_ICS_15_32.png
    Reply  Thu Jul 16 14:54:05 2009, rob, Update, Locking, MC_F channel dead 
Entry  Fri Jul 17 18:04:54 2009, Clara, Update, PEM, Guralp Box Fail VERT2_missing_resistors.pngresistors_diagram.pngresistors_board.png
    Reply  Sat Jul 18 19:49:48 2009, rana, Update, PEM, Guralp Box Fail Picture_1.pngPicture_2.pngAD620.pdf
Entry  Mon Jul 20 10:35:06 2009, steve, Update, VAC, UPS batteries replaced 
    Reply  Mon Jul 20 17:06:29 2009, Jenne, Update, PEM, Guralp Box Fail AD620noise_BenAbbott.pdf
Entry  Tue Jul 21 13:55:08 2009, Clara, Update, PEM, Guralp Box Success! 
Entry  Tue Jul 21 15:32:47 2009, Jenne, Update, IOO, MC_L flatlined 
    Reply  Tue Jul 21 17:52:12 2009, Jenne, Update, IOO, MC_L flatlined 
Entry  Wed Jul 22 10:49:40 2009, Alberto, Update, PSL, MC Alignment Trend 2009-07-21_MC-align-trend.pdf2009-07-22_mc-align-trend.pdf
Entry  Wed Jul 22 11:08:36 2009, Stephanie, Update, General, Multiply Resonant EOM Update BuiltCkt_Picture.pngBuiltCkt2_Final.png1stSegment.png2ndSegment_ExtraL.pngComplete_ExtraL.png
Entry  Wed Jul 22 14:44:57 2009, Zach, Update, Cameras, GigE Phase Camera 
Entry  Wed Jul 22 16:15:52 2009, Chris Zimmerman, Update, General, Week 5/6 Update Beam_Scan.jpgLong_Range_Michelson_Setup_1_-_Actual.pngNSD_Displacement.png
Entry  Wed Jul 22 20:11:26 2009, pete, Update, Computers, RCG front end 
Entry  Thu Jul 23 07:34:45 2009, Aidan, Update, CDS, Added C2 MEDM screens to 40m SVN. 
Entry  Thu Jul 23 10:05:38 2009, Alberto, Update, PSL, Summary of the latest adventures with the alignment of the mode cleaner 
Entry  Thu Jul 23 20:30:23 2009, Alberto, Update, PSL, Beam aligned to the Farady 
Entry  Fri Jul 24 17:20:48 2009, Jenne, Update, oplevs, ETMY oplev is iffy 
Entry  Fri Jul 24 17:47:52 2009, Stephanie, Update, General, Multiply Resonant EOM Update BuiltCkt2_Picture_Simplified.pngBuiltCkt2_Simplified.pngSimplified.png
Entry  Fri Jul 24 21:02:46 2009, Alberto, Update, PSL, Aligning the beam to the Faraday 
    Reply  Sat Jul 25 13:34:58 2009, Koji, Update, General, Week 5/6 Update 
    Reply  Sat Jul 25 13:49:28 2009, Koji, Update, General, Multiply Resonant EOM Update 
    Reply  Sat Jul 25 16:04:32 2009, rob, Update, PSL, Aligning the beam to the Faraday 
    Reply  Sat Jul 25 19:04:01 2009, Koji, Update, PSL, Aligning the beam to the Faraday MC2_Cam.jpg
    Reply  Sun Jul 26 13:19:54 2009, rana, Update, PSL, Aligning the mode cleaner Untitled.png
    Reply  Sun Jul 26 16:05:17 2009, Alberto, Update, PSL, Aligning the mode cleaner 
Entry  Mon Jul 27 14:43:34 2009, Chris, Update, , Photodetectors 
Entry  Mon Jul 27 17:48:44 2009, Jenne, Update, oplevs, ETMY oplev is still down for the count 
Entry  Tue Jul 28 16:03:14 2009, Clara, Update, PEM, Guralp Seismometer cable pin diagram guralp_pin_diagram.png
Entry  Tue Jul 28 18:32:21 2009, Koji, Update, CDS, RCG work 
Entry  Wed Jul 29 11:58:57 2009, Alberto, Update, PSL, MC not locking 
Entry  Wed Jul 29 12:00:49 2009, Stephanie, Update, General, Multiply Resonant EOM Update ImpedanceTestingPhysicalSetup.pngImpResponses.pngImpedanceTestingSetup.pngImpedanceTestingCktDiagram.png1nF.png
Entry  Wed Jul 29 12:14:40 2009, pete, Update, Computers, RCG work TF090729_1.pngTF090729_1.png
Entry  Wed Jul 29 13:15:35 2009, Clara, Update, PEM, Dents = Bad?? small_dent.pngbig_dent1.pngbig_dent2.png
Entry  Wed Jul 29 14:22:33 2009, Zach, Update, Cameras, GigE Phase Camera 
Entry  Wed Jul 29 14:56:44 2009, Jenne, Update, PEM, MiniEarthquakes due to construction 
    Reply  Wed Jul 29 19:46:04 2009, rana, alberto, Update, PEM, Dents = Bad?? 
Entry  Thu Jul 30 03:10:18 2009, rob, Update, IOO, MC tweaked further 
    Reply  Thu Jul 30 19:55:23 2009, Koji, Update, General, Multiply Resonant EOM Update imepedance.pngimpedance_meas.jpg
    Reply  Thu Jul 30 21:26:16 2009, rana, Update, IOO, MC Drumhead mode mc2drum.png
Entry  Fri Jul 31 09:52:38 2009, Stephanie, Update, General, Multiply Resonant EOM Update BuiltCkt2_Simplified_EOM.pngImpedanceAG4395A_with10pF.pngBuiltCkt2_Simplified_EOM_R.pngImpedanceAG4395A_withEOM.png
Entry  Fri Jul 31 11:04:42 2009, Stephanie, Update, General, Multiply Resonant EOM Update BoxPic.pngBoxPic2.png
Entry  Mon Aug 3 01:08:20 2009, Alberto, Update, PSL, MC unlocked 
    Reply  Mon Aug 3 12:57:09 2009, Alberto, Update, PSL, MC unlocked 
Entry  Mon Aug 3 13:47:42 2009, pete, Update, Computers, RCG work 
Entry  Mon Aug 3 14:15:50 2009, Jenne, Update, IOO, WFS recentered 
ELOG V3.1.3-