40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 92 of 330  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  11998   Thu Feb 18 02:52:27 2016 ericqUpdateIOOSome housekeepingI manually aligned the IMC. Spot positions
are all < 1.5mm. PMC trans of ~0.74, MC2
Trans of ~15400, MC Refl ~0.4, which is better
  
  11997   Wed Feb 17 13:45:15 2016 ericqUpdateGeneralNo monit on frontendsdaqd has indeed continued to be unstable.
I found system times had drifted apart again...
I think something weird happened in the booting
  
  11996   Wed Feb 17 09:05:07 2016 SteveUpdateVACforepump replacedTP3 drypump replaced after 10,344 hrs at
750 mTorr foreline pressure.

The foreline pressure is 13 mTorr
 jetStoreCrashedAgain.png 
  11995   Tue Feb 16 23:42:22 2016 gautamUpdateGeneralPower Glitch recovery - arms recovered I was able to realign the arms, lock
them, and have run the dither align to maximize
IR transmission - looks like things are back
  
  11993   Tue Feb 16 15:02:19 2016 ericqUpdateGeneralPower Glitch recoveryChiara reports an uptime of >195 days,
so its UPS is working fine 
  
  11992   Tue Feb 16 09:13:39 2016 SteveUpdateGeneralthere was a power outage & EQPasadena reported the Sunday night event
as a power transient caused by the trip of
a power transmission line. This affected
 20160215_power_outage.png 
  11991   Mon Feb 15 13:09:33 2016 KojiUpdateGeneralSomething has gone wrong - was there a power outage?Looks like that's the case. LIGO GC
also sent an e-mail that there was a popwer
glitch.
  
  11990   Mon Feb 15 12:28:03 2016 gautamUpdateGeneralSomething has gone wrong - was there a power outage?I came into the 40m a few minutes ago,
and noticed the following (approximately
in this order):
 Vac_15Feb2016.png 
  11989   Fri Feb 12 19:07:52 2016 KojiUpdateGreen LockingLaser swap - green light recovered but no flashes in the arm800e-6 / 0.225^2 = 0.016

=> 1.6%/W

I thought Kiwamu had roughtly 2%/W.
  
  11988   Fri Feb 12 17:05:40 2016 gautamUpdateGreen LockingLaser swap - green light recovered but no flashes in the armAfter carefully tweaking the mode-matching
of the IR into the crystal and the four-axis
translation stage on which the doubling oven
  
  11987   Fri Feb 12 11:10:49 2016 SteveUpdateGreen LockingInnolight laser is 10 years oldIt shipped out for repair evaluation.

Arrived to Hayward,CA   2016Feb16

 
 inno1W.jpg 
  11986   Thu Feb 11 14:28:50 2016 SteveUpdateTreasure091415 declared  
Beautifully Done

  
 091415declared.jpgYou_were_right!.jpgP1080312.JPG 
  11985   Wed Feb 10 17:57:15 2016 gautamUpdateGreen LockingLaser swap - updatesAfter the discussion at the meeting, I
decided to go ahead and open the top of the
oven so that I could get a visual on where
  
  11984   Tue Feb 9 19:15:36 2016 gautamUpdateGreen LockingLaser swap - updatesSome updates on the laser swap situation:


Mode-matching calculation: 



I
should have caught this earlier, but it was
 Modematch_X.pdfXendModeMatch.m.zip 
  11983   Tue Feb 9 11:49:47 2016 gautamUpdateGreen LockingLaser swap initiatedSteve pointed me to an old
elog by Zach where he had measured the
waist of the 1W Innolight NPRO. I ran
 Innolight_beamProfile.pdf 
  11982   Tue Feb 9 04:37:10 2016 ericqUpdateGreen LockingLaser swap initiated[ericq, Gautam]

Tonight we embarked on the laser
swap. In short, we have gotten ~210mW through
  
  11981   Mon Feb 8 15:36:37 2016 gautamUpdateGreen LockingAlternative mode-matching schemeI looked in the optics cabinet to see what
lenses we have available, and re-ran the
mode-matching calculation to see if we could
 Modematch_alternative.pdf 
  11980   Mon Feb 8 09:37:07 2016 SteveUpdateSUS EQ 3.9m No sign of damage

 
 EQ3.9mSimmierCa.png 
  11979   Fri Feb 5 16:50:24 2016 gautamUpdateGreen LockingFirst pass at mode-matchingI've done a first pass at trying to
arrive at a mode-matching solution for the
X-end table once we swtich the lasers out.
 Modematch_AUXx.pdfNewSetUp.pngModematch_AUXx_2.pdfXendModeMatch.m.zip 
  11978   Fri Feb 5 15:02:13 2016 gautamUpdateGreen LockingX-end NE cable[Steve, gautam]

Steve thinks that the X-end Innolight
does not come with the noise-eater option
  
  11977   Fri Feb 5 00:23:01 2016 gautamUpdateGreen LockingLightwave NPRO moved from PSL table to SP tableI've repeated the measurement for the
x-direction and also did the y-direction,
taking into account Koji's suggestion
 Beamscan_setup.pdfBeamscan_x.pdfBeamscan_y.pdfZscan.pdf 
  11976   Thu Feb 4 10:19:05 2016 SteveUpdatesafetyfire marshal inspectionPasadena fire marshal inspected the lab
today. No violation was found.
  
  11975   Thu Feb 4 10:14:52 2016 SteveUpdateSUS earthquake 3.5M  

 
 EQ3.5m_Simmier.Ca.png 
  11974   Thu Feb 4 09:16:46 2016 KojiUpdateGreen LockingLightwave NPRO moved from PSL table to SP tableI don't think the discrepancy is a
serious issue as long as the mode is clean.
The mode is determined by the NPRO crystal
  
  11973   Wed Feb 3 23:23:47 2016 gautamUpdateGreen LockingLightwave NPRO moved from PSL table to SP tableAs Koji pointed out in the previous elog,
the CCD beam profiler was ill suited for
this measurement. Nevertheless, to get a
 KnifeEdgeScans_x.pdfBeamscan_x.pdf 
  11972   Wed Feb 3 08:39:17 2016 SteveUpdateCDSblank daily summary pagesDaily summary pages are blank today. Yesterday
is ok
  
  11971   Tue Feb 2 18:54:02 2016 KojiUpdateGreen LockingLightwave NPRO moved from PSL table to SP tablejiIn fact, it is one of the most difficult
type mode profiling to measure a beam directly
out from a laser source.
  
  11970   Tue Feb 2 18:35:47 2016 gautamUpdateGreen LockingLightwave NPRO moved from PSL table to SP tableI've moved the following components
that was a part of Koji's setup from
the PSL table to the SP table so that I may
  
  11969   Mon Feb 1 18:11:25 2016 gautamUpdateGreen LockingLightwave frequency noise measurementBefore distrubing the beat setup with the
spare Lightwave laser, I wanted to see if
I could resolve the apparent difference in
 Free_running_frequency_noise_comparison.pdf 
  11968   Mon Feb 1 15:43:18 2016 KojiUpdateGreen LockingInnolight laser is 10 years oldThis is the same one as what you got from
Steve. But you can find full pages.

https://wiki-40m.ligo.caltech.edu/PSL/NPRO
  
  11967   Mon Feb 1 15:16:28 2016 gautamUpdateGreen LockingInnolight laser is 10 years oldThe Innolight laser control unit has a
25 pin D-sub connector on the rear which
is meant to serve as a diagnostics aid, and
  
  11966   Mon Feb 1 14:08:06 2016 SteveUpdatePEMroof condtion is goodIt rained hard yesterday. We have not had
this strong downpoor for years. We got
  
  11965   Mon Feb 1 09:16:32 2016 SteveUpdatePEMRat got cutWe got it! Traps are removed.

 
 bingo.jpgbingo3.png 
  11964   Sat Jan 30 09:56:24 2016 KojiUpdateGreen LockingInnolight laser is 10 years oldIt is strange that there is no difference
between with and without NE, isn't it?
  
  11963   Sat Jan 30 00:12:22 2016 gautamUpdateGreen LockingInnolight laser is 10 years old 




 RIN_comparison.pdf 
  11962   Fri Jan 29 16:55:27 2016 ranaUpdateGreen LockingInnolight laser is 10 years oldI don't think there's any evidence
that the noise eater is bad. That would change
the behavior of the relaxation oscillation
  
  11961   Fri Jan 29 14:43:47 2016 SteveUpdateGreen LockingInnolight laser is 10 years old


 inno1W.pdf 
  11960   Fri Jan 29 09:59:23 2016 SteveUpdateVACvacuum control upgradeRana stated yesterday that there will be
a vacuum control update in the close future.
Witnesses : Rich, Chris and Dave
 1100days.png 
  11959   Fri Jan 29 08:18:13 2016 SteveUpdatePEMPEM 




 PEM.png 
  11958   Thu Jan 28 19:10:16 2016 gautamUpdateLSCStatus of the green PDH circuits 




 Servo_gain_calibration.pdf 
  11957   Thu Jan 28 14:54:49 2016 ericqUpdateLSCStatus of the green PDH circuitsYesterday, I uploaded some EAGLE schematic
files and a LISO source file for the green
PDH servo electronics to the 40m LISO git
  
  11956   Thu Jan 28 00:29:30 2016 gautamUpdateGreen LockingLightwave frequency noise measurementSummary of the work done today:

Alignment and other work on
PSL table
 PLL_OLG.pdfFreq_noise_comparison.pdf 
  11955   Wed Jan 27 23:14:25 2016 gautamUpdatePEMETMX floor vs table noise


 X_end_ACC_Data.pngX_End_ACC_Data.xml.tar.gz 
  11954   Wed Jan 27 20:51:00 2016 ranaUpdatePEMETMX floor vs table noiseI didn't really appreciate this measurement
until just now. IF you can save the DTT .xml
file with all the traces in it (i.e. NOT
  
  11953   Wed Jan 27 18:19:45 2016 gautamUpdateGreen LockingLightwave frequency noise measurementAfter adjusting the alignment of the two
beams onto the PD, I managed to recover a
stronger beatnote of ~ -10dBm. I managed
  
  11952   Wed Jan 27 08:17:38 2016 SteveUpdatePEMETMX floor vs table noise 




 6x 
  11951   Tue Jan 26 17:50:22 2016 gautamUpdateGreen LockingLightwave frequency noise measurementI attempted to measure the frequency noise
of the extra Lightwave NPRO we have that
is currently sitting on the PSL table. I
  
  11950   Tue Jan 26 15:07:47 2016 SteveUpdatePEMaccelerometers moved to ETMXObjective:  measure the noise floor
on the optical table and the floor so we
can decide if the table needs better anchoring
 ETMX_floor_vs_optab.pngETMX_floor_vs_optabtop.png 
  11949   Mon Jan 25 11:06:08 2016 SteveUpdatePEMnoisy fan belt replacedThe noisy fan belt on the roof of the control
room was finally replaced on Friday, Jan
22 2016
  
  11948   Mon Jan 25 08:36:46 2016 SteveUpdateSUSPRM damping restoredPRM suspension damping restored after 4.1
Mag Ludlow earthquake.

 
 EQ4.1mLudlow.pngEQ7.1mAlaska_4.1mLudlow.png7.1_4.1.png 
ELOG V3.1.3-