40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 8 of 168  Not logged in ELOG logo
   +  Reply  Thu Nov 12 14:26:35 2020, gautam, Update, General, ETMY suspension eigenmodes ETMY.tar.bz2
Entry  Tue Nov 10 17:46:06 2020, gautam, Update, General, IFO recovery RFMerrs.pngIFOrecovery.pngALS_ool.pdfPRMIcarr.png
Entry  Tue Nov 10 11:59:37 2020, gautam, Update, VAC, Stuck RV2 damagedThread.001.jpegIFOstatus.pngP1a_leakTest.png
Entry  Fri Nov 6 14:08:44 2020, gautam, Update, PSL, PMC re-locked 
Entry  Tue Nov 3 09:06:50 2020, gautam, Update, General, Lab alarm tripped 
   +  Reply  Mon Nov 2 17:32:05 2020, gautam, Update, General, Plan for OMC chamber IMG_2317.JPG
Entry  Thu Oct 29 09:50:12 2020, anchal, Summary, Calibration, Preliminary calibration measurement taken PreliminaryCalibrationData.pdf
   +  Reply  Wed Oct 28 14:07:47 2020, gautam, Update, General, ISS checkout 
   +  Reply  Wed Oct 28 09:35:00 2020, Koji, Update, CDS, RFM errors Screen_Shot_2020-10-28_at_10.06.00.png
   +  Reply  Mon Oct 26 17:26:26 2020, gautam, Update, IOO, Excess laser freq noise investigation 
Entry  Fri Oct 23 19:01:57 2020, Koji, Summary, PEM, PSL Particle Counter kit removed from the table P_20201022_173529.jpgP_20201022_173419.jpg
Entry  Tue Oct 20 20:12:18 2020, Koji, Summary, General, DJI OSMO Pocket Camera Kit 20201020200929_IMG_0173.JPG
Entry  Mon Oct 19 15:40:02 2020, Koji, Update, PEM, Alaska EQ M7.5 
Entry  Mon Oct 19 15:38:42 2020, Koji, Update, Electronics, Loan: A file binder "40m wiring diagram"  
   +  Reply  Fri Oct 16 19:44:41 2020, anchal, Summary, General, Lab Entry Notification 
   +  Reply  Thu Oct 15 10:42:39 2020, gautam, Update, BHD, More investigation into RF44 sensing analogZetaLock.pngrelPhaseNoise.pdfsigMagPhase.pdf
Entry  Wed Oct 14 18:16:27 2020, gautam, Update, General, PSL HEPA-->50% 
   +  Reply  Wed Oct 14 17:03:55 2020, anchal, Summary, ALS, ALS noise budget update - Added whitening filter for ADC ALS_NoiseBudgetUpdate.pdf
Entry  Wed Oct 14 13:28:04 2020, Koji, Update, COC, ITM/ETM spares in Downs IMG_3073.jpeg
Entry  Tue Oct 13 21:22:29 2020, gautam, Update, General, Space cleared in 1Y1 for new FEs 
   +  Reply  Thu Oct 8 18:40:42 2020, Koji, Update, Computer Scripts / Programs, Finesse GUI 
Entry  Thu Oct 8 15:08:25 2020, gautam, Update, General, Some boxes moved from 40m entry hallway 
Entry  Wed Oct 7 13:06:27 2020, Koji, Update, General, Presence in the lab 
Entry  Tue Oct 6 14:35:16 2020, Jordan, Update, VAC, Spare forepumps 
Entry  Tue Oct 6 07:37:20 2020, yehonathan, Update, Wiki, New TIS measurements of 40m Optics ITMU_sn01-02_tis_1.pdf
Entry  Mon Oct 5 14:01:41 2020, gautam, Update, Electronics, aLIGO demod boards stuffed and delivered IMG_8888.JPG
   +  Reply  Mon Oct 5 00:53:16 2020, Koji, Update, BHD, Single bounce interferometer locked 
Entry  Sun Oct 4 15:32:21 2020, gautam, Update, SUS, Suspension health check combined.pdfallPlots.zip
Entry  Fri Oct 2 12:52:22 2020, gautam, Update, General, Spectroscopic grade Isopropanol delivered 
Entry  Fri Oct 2 10:29:49 2020, gautam, Update, Optical Levers, ETMY, BS and ITMX HeNes degrading OLsum.png
Entry  Thu Oct 1 17:44:48 2020, gautam, Update, General, Some inventory notes 
   +  Reply  Wed Sep 30 19:45:56 2020, rana, Update, General, HEPA blower startup capacitor replacement 
Entry  Tue Sep 29 17:07:25 2020, gautam, Update, General, Lab visit for inventory location 
Entry  Wed Sep 23 15:06:54 2020, Jordan, Update, VAC, TP2 Forepump Re-install Screenshot_from_2020-09-23_15-15-43.pngMainVolPumpDown.png
   +  Reply  Wed Sep 23 10:06:52 2020, Koji, Update, VAC, TP2 running HOT Screen_Shot_2020-09-23_at_10.00.43.png
   +  Reply  Tue Sep 22 22:38:11 2020, gautam, Update, BHD, Sensing scheme for homodyne phase - some analytic calcs simpleMich.pdf.zip
Entry  Tue Sep 22 16:29:30 2020, Koji, Update, General, Control Room AC setting for continuous running P_20200922_161125.jpg
Entry  Mon Sep 21 16:40:52 2020, gautam, Update, PSL, HEPAs are no longer running 
Entry  Mon Sep 21 15:57:08 2020, Jordan, Update, VAC, TP3 Forepump Replacement and Vac reset Screenshot_from_2020-09-21_15-56-04.png20200921_145043.jpg20200921_145040.jpg
   +  Reply  Mon Sep 21 12:40:58 2020, gautam, Update, General, Workable IFO recovery IFOrecovery.pngIMG_5345.JPG
   +  Reply  Sat Sep 19 19:37:16 2020, not Koji, Update, VAC, TP3 RP failure 
Entry  Sat Sep 19 18:46:48 2020, Koji, Update, General, Hand soap 
Entry  Wed Sep 16 17:44:27 2020, gautam, Update, CDS, All vertex FE models restarted CDS.png
   +  Reply  Wed Sep 16 09:43:41 2020, gautam, Update, IOO, MC F spectrum  MCF_MCL.pdf
   +  Reply  Tue Sep 15 22:11:52 2020, gautam, Update, BHD, More notes on the RF44 scheme RF44.pdf
   +  Reply  Tue Sep 15 17:04:43 2020, gautam, Update, Electronics, DC adaptors delivered 
   +  Reply  Tue Sep 15 12:20:36 2020, gautam, Update, Electronics, SR785 repaired dividerTF.pdf
Entry  Tue Sep 15 10:57:30 2020, gautam, Update, PSL, PMC re-locked, RGA re-enabled RGAscan.pdf
Entry  Thu Sep 10 15:56:08 2020, Koji, Update, General, HEPA & Particle Level Status 
Entry  Thu Sep 10 15:43:22 2020, Jon, Update, BHD, Input noise spectra for A+ BHD modeling 
ELOG V3.1.3-