40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 8 of 341  Not logged in ELOG logo
    Reply  Wed Nov 11 16:18:57 2009, Alberto, Update, ABSL, Working on the AP table 


    
        
            Quote:
        
        
            
            I've opened the AP table and I'm working on it.
Entry  Thu Nov 12 10:45:02 2009, Alberto, Update, PSL, Abandoned Frequency Generator 
This morning I found a frequency generator connected to something on the PSL table sitting on the blue step next to the sliding doors.
Is anyone using it? Has it been forgotten there? If that's the case, can the interested person please take care of removing it?
Entry  Thu Nov 12 10:45:36 2009, Alberto, Update, ABSL, Working on the AP table 
I've opened the AP table and I'm working on it.
Also auxiliary NPRO turned on and mechanical shutter opened.
    Reply  Thu Nov 12 11:34:38 2009, Alberto, Update, ABSL, Working on the AP table 


    
        
            Quote:
        
        
            
            Yes it did.
Entry  Thu Nov 12 12:50:35 2009, Alberto, Update, Computers, StochMon calibrated channels added to the data trend 
I added the StochMon calibrated channels to the data trend by including the following channel names in the C0EDCU.ini file:
[C1:IOO-RFAMPD_33MHZ_CAL]
[C1:IOO-RFAMPD_133MHZ_CAL]
    Reply  Thu Nov 12 12:51:45 2009, Alberto, Update, ABSL, Working on the AP table 


    
        
            Quote:
        
        
            
            I've opened the AP table and I'm working on it.
Entry  Thu Nov 12 16:13:05 2009, Alberto, Update, PSL, MC Trans Offset 
On Rana's suggestion I checked the MC transmission QPD (C1:IOO-MC_TRANS_SUM). I found that the readout is almost zero when the MC is unlocked.
I unlocked the Mode Cleaner turning off the LSC control and disabling the autolocker. The QPD reads 0.014. It seems that there is no offset.
I also checked with the IR card around the photodetector and I didn't see any stray beam.
    Reply  Thu Nov 12 16:53:59 2009, Alberto, Update, ABSL, Working on the AP table 


    
        
            Quote:
        
        
            
            
            
    
Entry  Thu Nov 12 18:10:27 2009, Alberto, Update, ABSL, PLL Locked 
I locked the PLL and made some first measuremtns of the spectrum of the error signal. I'll post them later.
I closed the shutter of the NPRO.
Entry  Sun Nov 15 18:42:10 2009, Alberto, Update, Locking, Interferometer fully locked for 3331 seconds 
This afternoon, I tried to lock the interferometer again after a few days.
After a couple of failed attempts, and relocks of the MZ, the interferometer stayed locked continuously for about 50 minutes, with arm power of
about 92.
Entry  Thu Nov 19 16:04:48 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes 
We want the elog process to run in verbose mode so that we can see what's going. The idea is to track the events that trigger the elog crashes.
Following an entry on the Elog Help Forum, I added this line to the elog starting script start-elog-nodus:
./elogd -p 8080 -c /cvs/cds/caltech/elog/elog-2.7.5/elogd.cfg -D -v > elogd.log 2>&1
    Reply  Thu Nov 19 18:49:55 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes 


    
        
            Quote:
        
        
            
            We want the elog process to run in verbose mode so that we can see what's going. The idea is to track the events that
Entry  Fri Nov 20 13:54:45 2009, Alberto, Omnistructure, Environment, New Paper and Cardboard Recycling Bins Introduced to the 40m DSC_1030.JPGDSC_1031.JPG
The 40m produces a large amount of paper and cardboard waste. It would be worth it if we disposed those kind of garbages for recycling.
I set up two new garbage bins in the lab: one in the control rooms that adds up to the can/bottle recycling bin, and one other one in the office
area, next to the printer for general paper disposal.
Entry  Tue Nov 24 14:33:22 2009, Alberto, Update, ABSL, working on the AP table 
I'm working on the AP table. I also opened the auxiliary NPRO shutter. The auxiliary beam is on its path on the AP table and PSL table.
    Reply  Tue Nov 24 19:16:02 2009, Alberto, Update, ABSL, working on the AP table 


    
        
            Quote:
        
        
            
            I'm working on the AP table. I also opened the auxiliary NPRO shutter. The auxiliary beam is on its path on the AP
Entry  Wed Nov 25 08:43:08 2009, Alberto, Update, ABSL, Working on the AP table 
I'm working on the AP table. I also opened the auxiliary NPRO shutter. The auxiliary beam is on its path on the AP table and PSL table.
Entry  Wed Nov 25 10:20:47 2009, Alberto, Update, ABSL, AbsL PLL not able to lock 
Last night something happened on the beat between the PSL beam and the auxiliary NPRO beam, that spoiled the quality of the beating I had before.
As a result the PLL has become unable to lock the two lasers.
The amplitude of the beat at the spectrum analyzer has gone down to -40 dBm from -10 that it was earlier. The frequency has also become more unstable
    Reply  Wed Nov 25 11:02:54 2009, Alberto, Update, ABSL, AbsL PLL not able to lock 


    
        
            Quote:
        
        
            
            Last night something happened on the beat between the PSL beam and the auxiliary NPRO beam, that spoiled the quality
    Reply  Wed Nov 25 15:42:27 2009, Alberto, Update, ABSL, Working on the AP table 


    
        
            Quote:
        
        
            
            I'm working on the AP table. I also opened the auxiliary NPRO shutter. The auxiliary beam is on its path on the AP
    Reply  Wed Nov 25 20:14:58 2009, Alberto, Update, ABSL, AbsL PLL not able to lock: problem fixed 


    
        
            Quote:
        
        
            
            Last night something happened on the beat between the PSL beam and the auxiliary NPRO beam, that spoiled the quality
Entry  Wed Nov 25 20:24:49 2009, Alberto, Update, ABSL, PLL Open Loop Gain Measured 2009-09-25_OLgain_g3png.png2009-09-25_OLgain_g6png.png
I measured the open loop gain of the PLL in the AbsL experiment.
I repeated the measurement twice: one with gain knob on the universal PDH box g=3.0; the second measurement with g=6.0
The UGF were 60 KHz and 100 KHz, respectively.
Entry  Wed Nov 25 20:28:17 2009, Alberto, Update, ABSL, Stopped working on the AbsL 
I closed the shutter of the NPRO for the night.
    Reply  Mon Nov 30 10:28:47 2009, Alberto, AoG, all down cond., sea of red 


    
        
            Quote:
        
        
            
            Came in, found all front-ends down.
    Reply  Mon Nov 30 11:29:40 2009, Alberto, AoG, all down cond., sea of red 


    
        
            Quote:
        
        
            
            
            
    
Entry  Thu Dec 3 15:55:24 2009, Alberto, AoG, LSC, RF AM Stabilizer Output Power 
Today I measured the max output power at the EOM output of one of the RF AM Stabilizers that we use to control the modulation depth. I needed to know
that number for the designing of the new RF system.
When the EPICS slider of the 166 MHz modulation depth is at 0 the modulation depth is max (the slider's values are reversed : 0 is max, 5 is min;
Entry  Tue Dec 8 10:20:33 2009, Alberto, DAQ, Computers, Bootfest succesfully completed 
Alberto, Kiwamu, Koji,
this morning we found the RFM network and all the front-ends down.
To fix the problem, we first tried a soft strategy, that is, we tried to restart CODAQCTRL and C1DCUEPICS alone, but it didn't work.
Entry  Thu Dec 10 08:40:12 2009, Alberto, Update, Computers, Fronte-ends down 
I found all the front-ends, except for C1SUSVME1 and C0DCU1 down this morning. DAQAWG shows up green on the C0DAQ_DETAIL screen but it is on a "bad"
satus.
I'll go for a big boot fest.
    Reply  Thu Dec 10 08:50:33 2009, Alberto, Update, Computers, Fronte-ends down 


    
        
            Quote:
        
        
            
            I found all the front-ends, except for C1SUSVME1 and C0DCU1 down this morning. DAQAWG shows up green on the C0DAQ_DETAIL
Entry  Thu Dec 10 13:10:25 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
I temporarily disconnected the Heliax cable that brings the 166MHz LO to the LSC rack.
I'm doing a couple of measurement and I'll put it back in as soon as I'm done.
Entry  Thu Dec 10 17:05:21 2009, Alberto, Configuration, LSC, 166 MHz LO SMA-to-Heliax connection repaired 
I replaced the SMA end connector for the 166 MHZ Local Oscillator signal that goes to the back of the flange in the 1Y2 rack. The connector had got damaged
after it twisted when I was tigheting the N connector of the Heliax cable on the front panel.
    Reply  Thu Dec 10 18:31:44 2009, Alberto, Configuration, LSC, 166 LO Disconnected 


    
        
            Quote:
        
        
            
            I temporarily disconnected the Heliax cable that brings the 166MHz LO to the LSC rack.
    Reply  Fri Dec 11 11:42:26 2009, Alberto, Configuration, LSC, 166 LO Disconnected 


    
        
            Quote:
        
        
            
            They must not be dBm, must be dB 
            
   
    Reply  Fri Dec 11 13:18:17 2009, Alberto, Configuration, VAC, pumpdown has started 


    
        
            Quote:
        
        
            
            Oplev positions before and after drag wiped arm TMs as of yesterday. Slow-mode pumpdown has started with 3/4 turn opened 
    Reply  Fri Dec 11 19:51:13 2009, Alberto, Configuration, LSC, 166 LO Disconnected 


    
        
            Quote:
        
        
            
             
    Reply  Mon Dec 14 14:16:14 2009, Alberto, Update, Treasure, LOCKSTARS 


    
        
            Quote:
        
        
            
            Good job guys. What I did was saying "I don't know",
Entry  Mon Dec 14 19:33:04 2009, Alberto, Update, General, Arm Cavity Poles measured again after cleaning the optics last week XarmTF01_fit.pdfYarmTF01_fit.pdfArmCavityFinesseMeasurment.tar.gz
Last week we vented and we cleaned the main optics of the arm cavities.
I measured the frequency of the cavity poles for both the arm cavities to see how they changed (see previous elog entry 2226).
These the results:
    Reply  Tue Dec 15 05:29:31 2009, Alberto, Update, General, Arm Cavity Poles measured again after cleaning the optics last week 
 
 The Y arm cavity pole moved down by 130 Hz, whereas the X arm moved by only 34 Hz. I wonder if that is because Kiwamu spent much more time
on cleaning ITMY than on any other optic.
Entry  Tue Dec 15 21:39:34 2009, Alberto, Update, ABSL, brief summary of this afternoon's measurements 
I took measurements of the open loop gain of the AbsL PLL with the old Universal PDH Box.
I Also measured the filter shape of both the
new and the old PDH box.
I'm going to plot the results in a nice form tomorrow morning.
For who's interested, the PLL UGF was at
10KHz.
 
I can't lock the PLL with the new PDH box. Measuring its filter's shape, as suggested by Koji, I found out that it
Entry  Wed Dec 16 11:21:20 2009, Alberto, Update, ABSL, Universal PDH Box Servo Filters NewandOlfFilterTF.pngNewandOlfFilterTF.png
Yesterday I measured the shape of the servo filter of both the old and the new Universal PDH boxes.
Here they are compared.
Entry  Wed Dec 16 11:46:25 2009, Alberto, Update, ABSL, Absl PLL Open Loop Gain OldBoxOLTF.png
Yesterday I measured the Open Loop Gain of the PLL in the absolute length experiment. The servo I used was that of the old Universal PDH box.
The OLG looks like this:
Entry  Thu Dec 17 09:30:08 2009, Alberto, HowTo, Computers, Nodus sluggish 
The elog has been quite slow for the last two days. The cause is nodus, that has been slowing down the access to it.
I looked at the list of the running processes on nodus by typing the command prstat, which is the equivalent for Solaris of the Linux "top".
I didn't see any particular process that might be absorbing too many resources.
Entry  Thu Dec 17 17:13:50 2009, Alberto, Omnistructure, Environment, STACIS stuff 
One of the electronics benches is currently occupied by the STACIS equipment.
We need that table If no one is working on the STACIS anymore,
it should be removed from there.
    Reply  Thu Dec 17 19:03:14 2009, Alberto, HowTo, Computers, Nodus sluggish 


    
        
            Quote:
        
        
            
            The elog has been quite slow for the last two days. The cause is nodus, that has been slowing down the access to it.
Entry  Mon Dec 28 15:19:19 2009, Alberto, Update, Computers, Burtrestored to Dec 26 at 20:00 
Since it wasn't sure whether all the front-ends had been restored after the bootfest, I burtrestored everything to Dec 26 at 20:00.
Always keep in mind that to burtrestore c1dcuepics,
the snapshot file has to be modified by hand by moving the last quote up to the line before the last.
Entry  Mon Dec 28 15:34:14 2009, Alberto, Update, ABSL, Working on the AP table 
I opened the auxiliary laser's shutter.
I'm currently working on the AP table.
    Reply  Mon Dec 28 18:35:27 2009, Alberto, Update, ABSL, Working on the AP table 


    
        
            Quote:
        
        
            
            I opened the auxiliary laser's shutter.
Entry  Wed Dec 30 10:58:48 2009, Alberto, Update, General, All watchdogs tripped this morning 
This morning I found all the watchdogs had tripped during the night.
I restored them all.
I can't damp ITMX. I noticed that its driving matrix is all 1s and -1s as the the right values had been lost in some previous burtrestoring.
Entry  Tue Jan 5 09:18:38 2010, Alberto, Omnistructure, Electronics, Universal PDH Box Stored in the RF Cabinet 
FYI: I stored the Universal PDH boxes in the RF cabiner in the Y arm.
Entry  Tue Jan 5 13:23:45 2010, Alberto, Omnistructure, Environment, turning page 
In the lab there are lots of old posters with outdated autocad drawings, or printouts with schematics of old electronics hanging on the walls.
Can we get rid of those and start giving the lab a fresh and modern look?
Entry  Fri Jan 8 10:03:04 2010, Alberto, Omnistructure, LSC, SPOB shutter was closed 
This morning I found that there was no light on the SPOB PD. I went looking at the photodetector and I found that the shutter in front of it was closed.
I switched the shutter driver from n.c. to n.o. which had the effect of opening it.
I guess we inadvertently closed the shutter with Rana when last week we were tinkering with the ITMY  camera.
ELOG V3.1.3-