Wed Mar 14 04:19:51 2012, kiwamu, Update, LSC, REFL33Q for MICH control : not good
|
Tue Mar 13 19:14:40 2012, kiwamu, Update, LSC, Noise estimatino in the REFL33Q as a MICH sensor
|
Wed Mar 14 13:16:50 2012, kiwamu, Update, LSC, A correction on Noise estimatino in the REFL33Q
|
Sat Mar 10 15:29:47 2012, Zach, HowTo, Computer Scripts / Programs, ModeMatchr
|
Wed Mar 14 13:27:15 2012, Zach, HowTo, Computer Scripts / Programs, ModeMatchr
|
Mon Mar 12 01:04:18 2012, keiko, Update, LSC, RAM simulation update, RAM LSC matrix
|
Mon Mar 12 18:57:58 2012, keiko, Update, LSC, RAM simulation update, RAM LSC matrix
|
Wed Mar 14 16:33:20 2012, keiko, Update, LSC, RAM simulation / RAM pollution plot 
|
Wed Mar 14 05:26:39 2012, interferomter tack force, Update, General, daytime tasks
|
Wed Mar 14 14:09:01 2012, interferomter tack force, Update, General, daytime tasks
|
Wed Mar 14 16:39:02 2012, Suresh, Update, General, REFL165 signal was not reaching demod board : Fixed
|
Tue Mar 13 07:04:55 2012, kiwamu, Update, LSC, evolution of the sensing matrix in PRMI as a function of time 
|
Tue Mar 13 16:40:06 2012, kiwamu, Update, LSC, evolution of the sensing matrix in PRMI as a function of time: details
|
Tue Mar 13 16:56:19 2012, kiwamu, Update, LSC, evolution of the sensing matrix in PRMI as a function of time
|
Wed Mar 14 21:01:36 2012, keiko, Update, LSC, evolution of the sensing matrix in PRMI as a function of time
|
Wed Mar 14 23:02:09 2012, Koji, Update, LSC, Locking activity
|
Thu Mar 15 08:48:40 2012, Ryan, Summary, CDS, Summary of Syracuse Visit to 40m Mar 5-9 2012
|
Fri Mar 16 16:03:03 2012, kiwamu, Update, IOO, MC alignment servo : put some offsets in the TRANS QPD signal
|
Sun Mar 18 00:29:24 2012, Den, Update, PEM, sts-2
|
Fri Mar 16 06:17:56 2012, Suresh, Update, Electronics, REFL165 calibration : measurements
|
Fri Mar 16 10:37:52 2012, Jenne, Update, Electronics, Jenne Laser
|
Fri Mar 16 16:01:53 2012, rana, Update, Electronics, REFL165 calibration : measurements
|
Mon Mar 19 21:25:31 2012, Suresh, Update, Electronics, REFL165 calibration : measurements
|
Tue Mar 20 09:59:01 2012, steve, Update, IOO, Laser tripped off
|
Tue Mar 20 16:53:48 2012, steve, Update, PEM, cranes maintenance & certified inspection of 2012
|
Tue Mar 20 17:50:44 2012, Suresh, Update, Computers, Beam Scan machine fixed
|
Wed Mar 14 10:06:26 2012, steve, Update, Green Locking, dichroic mirror quotes
|
Thu Mar 22 08:14:21 2012, steve, Update, Green Locking, dichroic mirror quotes with large wedge
|
Thu Mar 15 04:04:23 2012, Koji, Configuration, Locking, PRC Matching issues    
|
Thu Mar 22 17:35:59 2012, kiwamu, Update, Locking, mode profiles of the POP and POX beams : not bright enough
|
Wed Mar 21 10:31:28 2012, steve, Update, SAFETY, AC power to ETMY turned off
|
Wed Mar 21 11:32:47 2012, steve, Update, SAFETY, AC power to ETMX turned off
|
Wed Mar 21 19:12:27 2012, steve, Update, Computers, AC power back on both ends
|
Thu Mar 22 16:45:06 2012, kiwamu, Update, CDS, c1scx and c1scy not properly running
|
Thu Mar 22 17:41:15 2012, suresh, Update, CDS, c1scx and c1scy not properly running
|
Thu Mar 22 23:43:56 2012, Koji, Update, CDS, c1scx and c1scy not properly running
|
Sat Sep 10 11:07:37 2011, rana, HowTo, SUS, Optical Lever Servo Tuning thoughts
|
Sun Mar 25 20:13:31 2012, rana, HowTo, SUS, Optical Lever Servo Tuning thoughts
|
Mon Mar 26 12:50:24 2012, Zach, Update, elog, restarted with script
|
Fri Mar 23 05:10:46 2012, Suresh, Update, IOO, Beam Profile measurements: Errors too large to yield good fits. 
|
Mon Mar 26 15:15:16 2012, kiwamu, Update, IOO, expected beam profile of PRM reflection
|
Mon Mar 26 16:25:44 2012, kiwamu, Update, IOO, expected v.s. measured beam profile of PRM reflection 
|
Mon Mar 26 18:04:43 2012, kiwamu, Update, IOO, mode scan at the REFL port 
|
Fri Mar 23 01:59:59 2012, kiwamu, Update, IOO, REFL beam currently unavilable
|
Tue Mar 27 02:46:28 2012, kiwamu, Update, IOO, REFL beam available
|
Tue Mar 27 17:38:03 2012, Jenne, Update, IOO, Another possibility / thought
|
Tue Mar 27 17:52:08 2012, Koji, Update, IOO, Another possibility / thought
|
Tue Mar 27 21:37:51 2012, keiko, Configuration, IOO, Beam Profile measurement: IPPOS beam 9x
|
Thu Mar 29 11:29:27 2012, keiko, Update, LSC, POP22/POP110 amplifires
|
Thu Mar 29 18:42:11 2012, keiko, Update, LSC, POP22/POP110 amplifires 
|
Wed Mar 28 21:15:53 2012, rana, Omnistructure, Computers, Wireless router for GC
|
Thu Mar 29 13:23:05 2012, Jenne, Omnistructure, Computers, Wireless router for GC
|
Thu Mar 29 19:13:56 2012, Jamie, Omnistructure, Computers, Wireless router for GC
|
Fri Mar 30 08:58:37 2012, steve, Update, SAFETY, Safety glasses checked
|
Fri Mar 30 10:20:51 2012, kiwamu, Update, LSC, locking last night
|
Thu Nov 17 15:19:06 2011, steve, Update, SUS, Ti spring plunger to hold OSEM is not affortable 
|
Fri Jan 27 09:05:41 2012, steve, Update, SUS, OSEM locking plunger
|
Fri Mar 30 10:24:14 2012, steve, Update, SUS, new OSEM locking plunger  
|
Sat Mar 31 08:01:07 2012, kiwamu, Update, LSC, DRMI measurement
|
Mon Mar 26 23:47:54 2012, Suresh, Update, IOO, Beam Profile measurement: IPPOS beam  
|
Tue Mar 27 02:05:40 2012, Suresh, Update, IOO, Beam Profile measurement: IPPOS beam 
|
Tue Mar 27 11:54:18 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam
|
Tue Mar 27 18:03:46 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam
|
Tue Mar 27 21:20:32 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam
|
Tue Mar 27 23:37:35 2012, Suresh, Update, IOO, Beam Profile measurement: IPPOS beam
|
Wed Mar 28 01:17:29 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam  
|
Wed Mar 28 18:26:47 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam   
|
Wed Mar 28 20:54:02 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam 
|
Mon Apr 2 18:58:32 2012, Jenne, Update, IOO, Beam Profile measurement: IPPOS beam
|
Mon Apr 2 23:06:38 2012, Suresh, Update, IOO, Beam Profile measurement: IPPOS beam: Mystery deepens  
|
Tue Mar 27 17:19:02 2012, Koji, Update, IOO, Beam Profile measurement: IPPOS beam
|
Tue Mar 27 02:18:31 2012, keiko, Update, IOO, Beam Profile measurement: IPPOS beam   
|
Tue Mar 27 16:06:59 2012, keiko, Update, IOO, Beam Profile measurement: IPPOS beam
|
Tue Apr 3 12:42:19 2012, Mike J., Update, Computers, Hysteresis Model
|
Thu Mar 29 20:13:21 2012, jamie, Configuration, PEM, PEM_SLOW (i.e. seismic RMS) channels added to fb master
|
Wed Apr 4 13:25:29 2012, jamie, Configuration, PEM, PEM_SLOW (i.e. seismic RMS) channels aquiring
|
Wed Apr 4 21:43:16 2012, Mike J., Update, Computers, Better Hysteresis Model
|
Thu Apr 5 06:27:51 2012, kiwamu, Update, LSC, AS110 sideband monitor installed
|
Thu Apr 5 18:24:55 2012, Den, Configuration, Adaptive Filtering, oaf starts to work
|
Fri Apr 6 09:57:24 2012, Den, Update, Adaptive Filtering, static starts to work 7x
|
Fri Apr 6 10:31:07 2012, Den, Update, Adaptive Filtering, static and adaptive
|
Fri Apr 6 11:14:34 2012, Jenne, Update, Adaptive Filtering, static and adaptive
|
Fri Apr 6 11:32:09 2012, Jenne, Update, Computers, RAID array is rebuilding....
|
Fri Apr 6 14:39:21 2012, Jamie, Update, Computers, RAID array is rebuilding....
|
Fri Apr 6 15:06:05 2012, Den, Update, IOO, 1 Hz resonance 
|
Fri Apr 6 16:22:15 2012, Den, Update, Environment, seism box
|
Fri Apr 6 16:35:37 2012, Den, Update, Computers, c1ioo
|
Fri Apr 6 19:04:35 2012, Jenne, Update, PEM, STS releveled, GUR2 plugged in
|
Fri Apr 6 19:40:57 2012, Mike J., Summary, General, Laser Emergency Shutoff
|
Fri Apr 6 20:05:12 2012, Jamie, Summary, General, Laser Emergency Shutoff
|
Mon Apr 2 18:24:34 2012, keiko, Update, LSC, RAM simulation for Full ifo
|
Tue Apr 3 01:52:15 2012, Zach, Update, LSC, RAM simulation for Full ifo
|
Tue Apr 3 14:11:33 2012, keiko, Update, LSC, RAM simulation for Full ifo
|
Tue Apr 3 14:17:18 2012, keiko, Update, LSC, RAM simulation for Full ifo
|
Tue Apr 3 15:50:58 2012, keiko, Update, LSC, RAM simulation for Full ifo
|
Tue Apr 3 22:50:37 2012, keiko, Update, LSC, RAM simulation for Full ifo
|
Wed Apr 4 23:57:35 2012, keiko, Update, LSC, RAM simulation for Full ifo
|
Sat Apr 7 00:31:12 2012, keiko, Update, LSC, RAM simulation for Full ifo 
|
Sat Apr 7 02:01:29 2012, Mike J., Update, Computers, Projector Cable Management
|
Thu Apr 5 07:19:16 2012, kiwamu, Update, LSC, DRMI locking
|
Sat Apr 7 01:56:05 2012, kiwamu, Update, LSC, OSA signal in DRMI condition
|
Sat Apr 7 06:58:34 2012, kiwamu, Update, LSC, DRMI lock : lost good alignment
|
Mon Apr 9 15:02:30 2012, Jenne, Update, LSC, Locked MICH
|
Mon Apr 9 15:09:34 2012, Jenne, Update, LSC, Locked MICH
|
Mon Apr 9 17:03:38 2012, Den, Update, Environment, Lms vs Wiener   
|
Mon Apr 9 18:18:14 2012, kiwamu, Update, LSC, DRMI time series
|
Tue Apr 10 11:08:29 2012, tara, Update, PSL, curved mirror behind AOM removed
|
|