  11013   Thu Feb 12 12:16:04 2015 manasaUpdateGeneralFiber shielding[Steve, Manasa]

The fibers around the PSL table
were shielded to avoid any tampering.
  
  20   Fri Oct 26 21:48:40 2007 waldmanConfigurationOMCFiber to 056I set up a 700 mW NPRO in Rana's lab and launched
it onto a 50m fiber.  I got a few mW onto
the fiber,  enough to see with a card before
  
  3594   Wed Sep 22 16:35:45 2010 josephbUpdateCDSFibers pulled, new FB install tomorrow[Aidan, Tara, Joe]
We pulled out what used to be the
LSC/ASC fiber from the 1Y3 arm rack, and
  
  13753   Fri Apr 13 17:56:26 2018 gautamUpdateALSFibers switched outI swapped the EX fiber for the PSL fiber
in the polarization monitoring setup. There
is a lot more power in this fiber, and one
  
  13754   Sat Apr 14 14:42:09 2018 gautamUpdateALSFibers switched outIt looks like the drift in polarization
content in the PSL pickoff is actually much
higher than that in the EX pickoff. Note
 PSLdrift.png 
  13757   Tue Apr 17 14:08:29 2018 gautamUpdateALSFibers switched outA follow-up on the discussion from today's
lunch meeting - Rana pointed out that rotation
of the fiber in the mount by ~5degrees cannot
 PSL_fluctuations.png 
  13773   Fri Apr 20 00:26:34 2018 gautamUpdateALSFibers switched outSummary:

  
  4882   Sat Jun 25 00:00:28 2011 SonaliUpdateGreen LockingFibre Coupling. What I did today.
1. I tried to align the IR input
beam by aligning the two mirrors, to couple
 Fibre_coupling_successful_24_june.jpgBeam_output_on_screen.jpg 
  3859   Thu Nov 4 03:13:46 2010 SureshUpdateLockingFibre coupling 1064nm light at the south-end table[Kiwamu,
Suresh]
We
  
  3865   Thu Nov 4 19:00:57 2010 SureshUpdateLockingFibre coupling 1064nm light at the south-end tableThe Fluke
Visual Fault locator (Visifault) arrived
and I used it to couple 1064nm light into
  
  8183   Wed Feb 27 14:39:59 2013 AnnalisaUpdateLSCFibre laid for RFPD audio [Annalisa, Jenne, Rana, Steve]
We installed the fibres on cable
trays the 1Y2 and the Control Room.
  
  315   Wed Feb 13 20:37:11 2008 JohnUpdateLSCFibre locking - FiberSam and I observed fringes in the light reflected
from the Y arm. These fringes are due to
the sidebands and not the carrier. To improve
  
  272   Sat Jan 26 02:08:53 2008 JohnOmnistructureLSCFibresThere is now a fibre running from the SP table
to the ISCT at the Y-end. In the coming days
I will try to mode match the beam from this
  
  296   Mon Feb 4 22:01:57 2008 JohnSummaryLSCFibres auxiliary locking - FibersI managed to couple ~75% of the light transmitted
from the y arm, through the fibre, back to
the SP table. I hoped that this would be
  
  10860   Wed Jan 7 02:54:09 2015 JenneUpdateLSCFiddling with DARM filtersOne of the things that we had talked about
last night was the totally tiny amount of
phase margin that we have in the CARM and
 DARM_design_orig.pdf 
  14703   Wed Jun 26 20:45:03 2019 gautamUpdateCamerasField of view optionsFor the beam spot position tracking, I
am wondering if there is any benefit to going
for a wider field of view and getting the
  
  10474   Tue Sep 9 00:34:34 2014 JenneUpdateLSCFiguring out where to do DARM->AS55This afternoon, after Q and Manasa finished
recovering from the activities of the morning,
I aligned the IFO, and went to the Yend to
  
  10478   Tue Sep 9 14:25:46 2014 jamieUpdateLSCFiguring out where to do DARM->AS55

    

       
            
  
  5128   Fri Aug 5 20:44:26 2011 jamieMetaphysicsTreasureFilm crew here Monday morningJust a reminder that a film crew will
be here Monday morning, filming Christian
Ott for some Discovery channel show.
  
  7092   Mon Aug 6 17:15:15 2012 JenneUpdateASSFilter banks not workingI was trying to load some filters into
the ASS so that I can try it out, but for
some reason the filter banks aren't working
  
  7099   Tue Aug 7 00:22:10 2012 JenneUpdateASSFilter banks working

    

       
            
  
  5730   Mon Oct 24 19:48:16 2011 MirkoUpdateAdaptive FilteringFilter execution timeToyed around some more with the adaptive
filters.
Execution time:
nTaps   
  
  3802   Thu Oct 28 02:01:51 2010 KevinUpdatePSLFilter for 2W Laser[Rana and Kevin]
I made a low pass filter for the
piezo driver for the 2W laser that is now
 tf.PDFoutside.jpginside.jpg 
  3707   Wed Oct 13 17:12:33 2010 josephb, yutaUpdateCDSFilter name length problem found and fixedThe missing filter files for ULPOS, URPOS,
and so forth for the mode cleaner optics
was due to the length of the names of the
  
  995   Fri Sep 26 00:19:54 2008 JenneUpdatePSLFilter-action with the PMCWritten, but not posted on 24Sept2008:

 
  
  522   Fri Jun 6 11:19:13 2008 CarynSummaryPEMFiltering MC_L and MC_F with PEM:ACC and microphoneTried to filter MC_L and MC_F with acc/seis
data and microphone data using wiener filter
(levinson)
 8x 
  6049   Wed Nov 30 02:04:26 2011 rana, den, jenne, kiwamu, jzweizigUpdateCDSFiltering Noise issue tracked down ??? You can read through all of our past
tests to see what didn't work in tracking
things down. As Den mentions, there was actually
  
  6051   Wed Nov 30 11:04:26 2011 josephbUpdateCDSFiltering Noise issue tracked down ???

    

       
            
  
  6052   Wed Nov 30 11:36:12 2011 DenUpdateCDSFiltering Noise issue tracked down ???

    

       
            
  
  7074   Wed Aug 1 22:37:21 2012 JenneUpdateASSFilters installed in the ASSAs part of trying to figure out what is
going on with the ASS, I wanted to figure
out what filters are installed on which lockins.
 ASS_lockin_filters_1Aug2012.pdf 
  11590   Thu Sep 10 09:37:34 2015 IgnacioSummaryIOOFilters left on MCL static moduleThe following MCL filters
were left loaded in the T240-X and T240-Y
  
  10239   Fri Jul 18 19:32:50 2014 AkhilSummaryElectronicsFilters used inside the Frequency Counter 
 Thanks Koji , for your  hint
for the brain teasing puzzle. I was looking
 TheoreticalGainPlot.pngTFexpected.png 
  10246   Mon Jul 21 12:16:27 2014 AkhilSummaryElectronicsFilters used inside the Frequency CounterThe expected bode plots for such
a filter with L= 4 is attached and compared
 FC_TF_Characterization.png 
  3437   Wed Aug 18 19:19:38 2010 JenneUpdateSUSFinal 2 TTs suspended![Jenne, Yoichi]
The final 2 Tip Tilts (#1 and #5)
have been suspended.  We have designated
  
  8113   Wed Feb 20 01:40:37 2013 ManasaUpdateAlignmentFinal IFO alignment- in progress[Yuta, Sendhil, Jamie, Jenne, Rana]

1. After the MC centering, we tried
  
  8338   Mon Mar 25 16:51:43 2013 ChloeUpdate Final QPD Circuit DesignThis is the final version of the QPD circuit
I'm going to build. After playing around
with the spatial arrangement, this should
 IMG-20130325-00244.jpg 
  11535   Fri Aug 28 00:59:55 2015 IgnacioUpdateIOOFinal SISO FF Wiener Filter for MCLThis is my
final
 bode.png2.png3.png4.png6.png 
  14764   Tue Jul 16 15:17:57 2019 KojiHowToCDSFinal bit bug of the BIO CDS module Yutaro talked about the BIO bug in KAGRA
elog. http://klog.icrr.u-tokyo.ac.jp/osl/?r=9536

I think I made the similar change
  
  14890   Tue Sep 17 14:43:59 2019 gautamHowToCDSFinal bit bug of the BIO CDS module Came across this while looking up the BIO
situation at 1Y2. For reference, the fix
Koji mentions can be seen in the attached
 Screen_Shot_2019-09-17_at_2.44.41_PM.png 
  14941   Fri Oct 4 22:22:03 2019 gautamUpdateCDSFinal incarnation of latch.py[KA, GV]

This elog is meant to be a summary
of some of the many subtleties
 LatchLogic.pdf 
  14947   Tue Oct 8 03:19:14 2019 KojiUpdateCDSFinal incarnation of latch.pyNow with the CM board tested with the signal
injected, it turned out that the latch logic
was flipped. As the default state locked
  
  941   Thu Sep 11 11:29:14 2008 josephbConfigurationComputersFinal netgear switch in place in 1Y2I've placed the final (of 4) Netgear prosafe
24 port switch at the very top of 1Y2.  At
that location, there are no holes left to
  
  8961   Fri Aug 2 21:59:36 2013 CharlesUpdateISSFinalized ISS Schematic (hopefully) Attached is the finalized schematic. The
general circuit topology should remain the
same from this point forward, although individual
 ISS_v3.pdfISS_v3-Power_Reg.pdf 
  16988   Mon Jul 11 19:29:23 2022 PacoSummaryGeneralFinalizing recovery -- timing issues, cds, MC1[Yuta, Koji, Paco]

Restarting
CDS

We were having
  
  2983   Tue May 25 16:40:27 2010 josephb, alexUpdateCDSFinally tracked down why new models wouldn't talk to each otherThe problem with the new models using the
new shared memory/dolphin/RFM defined as
names in a single .ipc file.
  
  17006   Fri Jul 15 16:20:16 2022 Cici HannaUpdateGeneralFinding UGFI have temporarily abandoned vectfit and
aaa since I've been pretty unsuccessful
with them and I don't need poles/zeroes
 UGF_4042.pngUGF_5650.pngTFSR785_29-06-2022_114042.txtTFSR785_29-06-2022_115650.txt 
  16993   Tue Jul 12 18:35:31 2022 Cici HannaSummaryGeneralFinding Zeros/Poles With VectfitAm still working on using vectfit to find
my zeros/poles of a transfer function - now
have a more specific project in mind, which
  
  8322   Thu Mar 21 09:53:46 2013 AnnalisaUpdateLockingFinding the beat note Yesterday I tried to find the beat
note between the main PSL and the auxiliary
NPRO, but I didn't :( 
  
  8323   Thu Mar 21 10:19:28 2013 KojiUpdateLockingFinding the beat noteGive us more info on the elog:

What PD are you using? How much power
  
  8327   Thu Mar 21 13:11:42 2013 AnnalisaUpdateLockingFinding the beat note

    

       
            