Mon Jul 9 10:52:48 2012, Masha, Update, PEM, StripTools on Wall
|
Mon Jul 9 05:15:46 2012, yuta, Update, Green Locking, locked MI while ALS using ASDC
|
Sun Jul 8 19:31:53 2012, yuta, Update, Locking, characterizing LSC arm lock by ALS error signal   
|
Mon Jul 9 05:02:58 2012, yuta, Update, Locking, adjusted ALS filters, current RMS   
|
Thu Jul 5 13:38:05 2012, yuta, Summary, Locking, cavity g-factor from mode scan
|
Sun Jul 8 00:27:54 2012, yuta, Summary, Locking, calibrating phase tracking mode scan data
|
Sun Jul 8 00:58:08 2012, Koji, Summary, Locking, calibrating phase tracking mode scan data
|
Sat Jul 7 16:34:41 2012, Masha, Update, PEM, PEM no longer freaking out (as much).
|
Sat Jul 7 17:28:11 2012, Masha, Update, PEM, PEM no longer freaking out (as much).
|
Fri Jul 6 20:54:54 2012, Masha, Update, PEM, Current PEM status
|
Fri Jul 6 22:30:14 2012, Masha, Update, PEM, Current PEM status
|
Sat Jul 7 15:48:00 2012, Masha, Update, PEM, Current PEM status
|
Fri Jul 6 01:39:56 2012, yuta, Update, Locking, MI + Y arm ALS succeed, but not both 
|
Fri Jul 6 14:10:31 2012, yuta, Summary, LSC, calculation of FPMI using ALS
|
Mon Jul 2 18:27:25 2012, yuta, Update, General, BS and ITMX chambers closed
|
Tue Jul 3 17:23:50 2012, steve, Update, VAC, pumpdown completed  
|
Fri Jul 6 09:27:40 2012, steve, Update, VAC, 4 days at atm
|
Fri Jul 6 09:52:35 2012, steve, Update, VAC, pump down hick up 
|
Fri Jul 6 08:38:04 2012, steve, Update, Computers, time out
|
Fri Jul 6 02:46:03 2012, yuta, Update, Locking, Y arm ALS handing off to LSC
|
Thu Jul 5 16:49:35 2012, Jenne, Update, Computers, c1sus is funny
|
Fri Jul 6 01:12:02 2012, Jenne, Update, Computers, c1sus is fine
|
Thu Jul 5 10:49:38 2012, Jamie, Update, CDS, front-end/fb communication lost, likely again due to timing offsets
|
Thu Jul 5 11:12:53 2012, Jenne, Update, CDS, front-end/fb communication lost, likely again due to timing offsets
|
Thu Jul 5 12:27:05 2012, Jamie, Update, CDS, front-end/fb communication lost, likely again due to timing offsets
|
Thu Jul 5 01:34:11 2012, yuta, Update, Locking, MI with X arm ALS
|
Thu Jul 5 01:20:58 2012, yuta, Summary, CDS, slow computers, 0x4000 for all DAQ status
|
Wed Jul 4 21:11:53 2012, yuta, Update, Locking, FPMI in vacuum is back 
|
Wed Jul 4 20:13:46 2012, yuta, Bureaucracy, Locking, PRC commissioning plan
|
Wed Jul 4 17:33:04 2012, Jamie, Update, CDS, timing, possibly leap second, brought down CDS
|
Tue Jul 3 20:51:06 2012, yuta, Update, IOO, MC in vacuum is back
|
Tue Jul 3 17:56:35 2012, Jamie, Update, Green Locking, Laseroptik dichroic optics received
|
Tue Jul 3 19:04:59 2012, Jamie, Update, Green Locking, Laseroptik dichroic optics received
|
Tue Jul 3 18:58:14 2012, Yaakov, Update, STACIS, More transfer functions and netGPIB status  
|
Mon Jul 2 23:08:38 2012, Yaakov, Update, STACIS, Turning on STACIS    
|
Mon Jul 2 18:28:09 2012, Jenne, Update, Photos, Many photos taken
|
Sun Jul 1 23:48:15 2012, yuta, Summary, General, clipping at BS, my plan 
|
Mon Jul 2 00:41:13 2012, rana, Summary, General, clipping at BS, my plan
|
Mon Jul 2 10:45:25 2012, Jenne, Summary, General, clipping at BS
|
Sun Jul 1 13:20:09 2012, yuta, Update, IOO, MC in low power
|
Fri Jun 29 22:56:35 2012, Jamie, Update, VAC, input telescope beam clipping on Faraday
|
Sat Jun 30 18:31:38 2012, steve, Update, IOO, input telescope beam clipping on Faraday
|
Fri Jun 29 16:41:41 2012, yuta, Update, General, PRM was NOT installed backwards
|
Fri Jun 29 02:17:40 2012, yuta, Update, IOO, prep for the vent - beam attenuating
|
Fri Jun 29 03:21:32 2012, yuta, Update, General, prep for the vent - others
|
Fri Jun 29 11:02:00 2012, steve, Update, VAC, the vent is at 500 torr 
|
Fri Jun 29 13:11:31 2012, steve, Update, VAC, 40m IFO at atm 
|
Thu Jun 28 00:50:48 2012, yuta, Update, Locking, PRMI work started, commissioning plan  
|
Thu Jun 28 01:44:57 2012, Koji, Update, Locking, PRMI work started, commissioning plan
|
Thu Jun 28 15:21:02 2012, rana, Update, Locking, PRMI work started, commissioning plan
|
Thu Jun 28 20:59:28 2012, yuta, Bureaucracy, Locking, vent for PRC check, TOMORROW!
|
Thu Jun 28 22:08:57 2012, Jenne, Bureaucracy, Locking, vent for PRC check, TOMORROW!
|
Fri Jun 29 01:49:36 2012, yuta, Bureaucracy, Locking, vent for PRC check, TOMORROW!
|
Tue May 15 23:40:46 2012, Mike J., Update, Computers, Image Subtraction  
|
Wed May 16 11:53:45 2012, Jenne, Update, Computers, Image Subtraction
|
Wed Jun 27 23:54:21 2012, yuta, Update, Computer Scripts / Programs, image capturing script
|
Wed Jun 27 16:23:12 2012, yuta, Update, IOO, AS and REFL on AP table aligned
|
Fri May 25 19:13:10 2012, Duncan Macleod, Summary, Computer Scripts / Programs, 40m summary webpages
|
Fri May 25 20:45:25 2012, Duncan Macleod, Summary, Computer Scripts / Programs, 40m summary webpages
|
Wed Jun 27 15:10:34 2012, Jamie, Update, Computer Scripts / Programs, 40m summary webpages move
|
Wed Jun 27 14:18:30 2012, Yaakov , Summary, STACIS, First week summary
|
Wed Jun 27 14:12:44 2012, Eric, Summary, General, SURF Week 1
|
Wed Jun 27 11:35:06 2012, Sasha, Summary, Computer Scripts / Programs, SURF - Week 1 - Summary  
|
Wed Jun 27 11:33:28 2012, Masha, Update, General, First Week Update
|
Wed Jun 27 11:27:49 2012, Liz, Update, , First Week Update!
|
Sat Jun 23 02:29:18 2012, yuta, Update, Green Locking, X arm mode scan results 
|
Wed Jun 27 03:43:52 2012, yuta, Summary, IOO, how to improve mode matching to arms 
|
Wed Jun 27 10:27:09 2012, rana, Summary, IOO, how to improve mode matching to arms
|
Tue Jun 26 22:37:43 2012, yuta, Update, IOO, energized OMC stages
|
Tue Jun 26 01:30:13 2012, yuta, Summary, Green Locking, simultaneous hold and release of the arm (aka two arm ALS)
|
Mon Jun 25 17:48:27 2012, yuta, Update, Computer Scripts / Programs, script for finding IR resonance using ALS
|
Mon Jun 25 16:21:10 2012, Koji, Summary, IOO, Selection of motorized mirror mounts
|
Mon Jun 25 15:19:07 2012, Yaakov, Update, PEM, Added microphone channels, moved accelorometer channels
|
Mon Jun 25 15:07:49 2012, yuta, Update, IOO, MC beam spot trend
|
Sat Jun 23 18:44:15 2012, steve, Update, General, power surge has no effect on the lab
|
Sat Jun 23 19:57:22 2012, yuta, Summary, Computers, c1ioo is down
|
Mon Jun 25 10:35:59 2012, Jenne, Summary, Computers, c1ioo is down
|
Mon Jun 25 11:27:13 2012, Jamie, Summary, Computers, c1ioo is down
|
Mon Jun 25 08:21:40 2012, steve, Update, General, AC power disturbance on Sat
|
Mon Jun 11 22:51:11 2012, Jenne, Update, Computers, tdsavg not working
|
Mon Jun 25 11:23:14 2012, Jenne, Update, Computers, tdsavg not working
|
Fri Jun 22 20:58:15 2012, Jenne, Update, Green Locking, Calibrated POX spectra - Xarm stabilized by ALS
|
Fri Jun 22 20:00:14 2012, Jamie, Omnistructure, Electronics, two RG-405 cables ran from 1X2 rack to control room
|
Fri Jun 22 19:52:47 2012, Jamie, Update, Computers, ottavia reconfigured as CDS workstation
|
Fri Jun 22 17:51:04 2012, Jenne, Update, Cameras, Green Trans camera repositioning attempt
|
Fri Jun 22 13:37:17 2012, Jenne, Update, Computers, fb lost connection
|
|