    Reply  Wed Aug 5 09:25:57 2009, Alberto, DAQ, Computers, fb40m is up 
FB40m up and running again after restarting the DAQ.
Entry  Wed Aug 5 15:57:05 2009, Alberto, Configuration, Computers, PMC MEDM screen changed 
I added a clock to the PMC medm screen.
I made a backup of the original file in the same directory and named it *.bk20090805
    Reply  Thu Aug 6 09:22:17 2009, Alberto, DAQ, General, can't get trends 


    
        
            Quote:
        
        
            
            We can't read minute trends from either Dataviewer or loadLIGOData from before 11am this morning. 
Entry  Fri Aug 7 11:39:13 2009, Alberto, Update, PSL, MZ Alignment 
For the last couple of days we've been trying to find the cause that is preventing us to get more than 0.85 for the arm power.
After re-aligning
the reference caivity yesterdau, today I went for the MZ. I slightly changed the alignment of the mirror in pitch. I was able to inrease the MZ-TRANPD
to 4.8 (from about 3).
Unfortunately the same increase didn't show up at the MC transmission (that is IFO input) becasue changing the MZ also
Entry  Fri Aug 7 14:31:39 2009, Alberto, Update, PSL, DAQ REstarted 
For some reason a few minutes ago the FB DAQ crashed and I had to restarted.
Entry  Mon Aug 10 16:41:31 2009, Alberto, Configuration, PSL, PMC Visibility 
Alberto, Rana
lately we've been trying to better understand what's preventing the arm power to get high again. Last week I tuned the MZ and the PMC but we
didn't gain much, if nothing at all.
Yesterday I measured the transmissivity, the reflectivity and the visibility of the PMC.
 
From
Entry  Wed Aug 12 15:02:33 2009, Alberto, Configuration, Computers, elog restarted 
In the last hour or so the elog crashed. I  have restarted it.
Entry  Mon Aug 24 10:43:27 2009, Alberto, Omnistructure, Computers, RFM Network Failure 
This morning I found that all the front end computers down. A failure of the RFM network drove all the computers down.
I was about to restart them all, but it wasn't necessary. After I power cycled and restarted C1SOSVME all the other computers and RFM network came
back to their green status on the MEDM screen. After that I just had to reset and then restart C1SUSVME1/2.
Entry  Tue Aug 25 21:26:12 2009, Alberto, Update, Computers, elog restarted 
I just found the elog down and I restarted it.
    Reply  Tue Aug 25 21:36:28 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 2009-08-25_PSLtrend.png
 
 Is that the reason of the PSL craziness tonight? See attachment.
    Reply  Wed Aug 26 15:42:17 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 


    
        
            Quote:
        
        
            
            There's no elog entry about what work has gone on today, but it looks like Peter took apart the reference cavity temperature
    Reply  Wed Aug 26 16:11:41 2009, Alberto, Update, PSL, reference cavity temp box temporarly out of order 
It turned out that half an hour was too long. In less than that the reference cavity temperature passed the critical point when the temperature controller
(located just below the ref cav power supply in the same rack) disables the input power to the reference cavity power supply.
The controller's display in the front shows two numbers. The first goes with the temperature of the reference cavity; the second is a threshold
    Reply  Wed Aug 26 16:35:03 2009, Alberto, Configuration, PSL, PSL reference cavity temperature box modifications 
Basically, in addition to the replacement of the resistors with metal film ones, Peter replaced the chip that provides a voltage reference.
The old one provided about 2.5 V, whereas the new one gets to about 7V. Such reference voltage somehow depends on the room temperature and it is
used to generate an error signal for the temperature of the reference cavity.
Entry  Thu Sep 3 23:41:32 2009, Alberto, Configuration, LSC, POX (PD3) aligned 
Today I aligned the beam to PD3 (POX) since Steve had moved it.
The DC power read 1.3mV when the beam was on the PD.
Entry  Mon Sep 7 23:18:01 2009, Alberto, Update, Locking, Some locking attempts 
Tried to lock the interferometer but arm power didn't get over 65.
Tonight, after the weekend, I resumed the work on locking.
When I started the Mode Cleaner was unlocked because the MZ was also unlocked.
Entry  Tue Sep 8 12:26:16 2009, Alberto, Update, PSL, Connection of the RC heater's power supply replaced 
I have replaced the temporary clamps that were connecting the RC heater to its power supply with a new permanent
connection.
In the IY1 rack, I connected the control signal of the RC PID temperature servo - C1:PSL-FSS_TIDALSET - to the input of the RC heater's power supply.
Entry  Fri Oct 2 17:00:06 2009, Alberto, Update, General, 40m Update - Requirements on the 5x Frequency Multiplier DesignOfTheMultiplier1-14-15.pdf
Here's the gist of the requirements on the 5x frequency multiplier for the upgrade (see attachemnt - despite the preview down here in the elog, they're
3 pages).
An extended version is available on the wiki.
Entry  Mon Oct 5 09:31:05 2009, Alberto, Frogs, PSL, PSL laser accidentally turned off 
Alberto, Steve,
While I was moving a cart near by the PSL table I pushed the red emergency button that turns off the PSL laser. We had to unlock the button and
then power cycle the laser driver to turn the laser back on.
Entry  Mon Oct 5 14:37:29 2009, Alberto, Update, ABSL, Absolute Length Meaasurement NPRO is on 
In the revival of the experiement length measurement for the recycling cavities, I turned the auxiliary NPRO back on. The shutter is closed.
I also recollected all the equipment of the experiment after that during the summer it had been scattered around the lab to be used for other purposes
(Joe and Zach's cameras and Stephanie and Koji's work with the new EOM).
Entry  Sun Oct 18 15:46:08 2009, Alberto, Configuration, General, Antique, unused QPD removed from the AS table  
Inspecting the AS table to make an inventory of the photodiodes in use around the interferometer, I found a mysterious photodetector hiding behind PD1
(AS166).
It turned out the detector was an old type of QPD from the Squeezing Experiment a few years ago.
Entry  Wed Oct 21 15:07:45 2009, Alberto, Update, WIKI-40M Update, Photodiodes' configuration for the Upgrade 
I uploaded on the Wiki (here) the results of an inventory over our current PDs,
a list of the new ones that we're going to need for the new control scheme.
Entry  Wed Oct 21 17:12:30 2009, Alberto, Update, elog, Browser context menu enabled on the Elog under HTM editing mode 
On behalf of Steve and of the rest of the not-native-English community at the 40m willing to have their browser's spell checker working while editing
the Elog, I fixed the Elog's feature that prevented Firefox' context menu (that one which pops up with a mouse right click) to work when using the HTML
editing interface (FCKeditor).
Entry  Wed Nov 4 16:49:32 2009, Alberto, Update, LSC, Arm Cavity Finesse Measurement DSC_0952.JPG
I'm going to work on the X arm to measure the arm cavity finesse.
The idea is to measure the cavity transfer function to estimate the frequency of its cavity pole. That should be a more accurate measurement than
that based on the cavity decay time.
    Reply  Wed Nov 4 18:35:19 2009, Alberto, Update, LSC, Arm Cavity Finesse Measurement 


    
        
            Quote:
        
        
            
            I'm going to work on the X arm to measure the arm cavity finesse.
    Reply  Wed Nov 4 21:46:18 2009, Alberto, Update, LSC, Arm Cavity Finesse Measurement 


    
        
            Quote:
        
        
            
            
            
    
Entry  Wed Nov 4 23:17:51 2009, Alberto, Update, LSC, X Arm Cavity transfer Function ArmCavityTF02.png
I measured the transfer function between MC_TRANS and TRX and I'm attaching the result.
    Reply  Thu Nov 5 19:25:11 2009, Alberto, Update, LSC, X Arm Cavity transfer Function PDA255CalibrationTF03.png


    
        
            Quote:
        
        
            
            I would have guessed that you have to calibrate the detectors relative to each other before trying this. Its also
Entry  Thu Nov 5 22:30:09 2009, Alberto, Update, LSC, X Arm Cavity Transfer Function XarmTF01.png
It seems that just repeating the measurement was enough to get a good transfer function of the x arm cavity. Here's what I got.
Entry  Thu Nov 5 23:09:34 2009, Alberto, Update, LSC, Y Arm Cavity Transfer Function YarmTF01.png
As for the X Arm, this the transfer function I measured for the Y arm cavity.
Entry  Fri Nov 6 00:23:34 2009, Alberto, Configuration, Computers, Elog just rebooted 
The elog just crashed and I rebooted it
    Reply  Fri Nov 6 00:24:06 2009, Alberto, Update, LSC, Y Arm Cavity Transfer Function YarmTF02.png


    
        
            Quote:
        
        
            
            As for the X Arm, this the transfer function I measured for the Y arm cavity.
Entry  Fri Nov 6 00:40:29 2009, Alberto, Update, LSC, Everything put back as it was 
I disconnected the setup for the arm cavity TF measurement. I opened the scitation switch on the ISS medm screen. I reconnected the OMC ISS EXC cable
to the breakout box on the floor.
The photodiode on the Y end is stilll connected.
Entry  Sun Nov 8 14:18:25 2009, Alberto, Update, SUS, ETMY Watchdogs tripped 
This afternoon I re-enabled the ETMY coils after I found that the watchdogs for the mirror had tripped last night
at 2:06am.
Entry  Sun Nov 8 22:50:29 2009, Alberto, Update, ASC, IFO Alignment 
Tonight I aligned the IFO by running the scripts one by one.
SRC was far off and I had to align SRM by hand before the script could work. SPOB is still low when DRM is aligned.
I'm restoring the full IFO now that I'm taking off.
Entry  Mon Nov 9 11:11:19 2009, Alberto, Configuration, LSC, MC2 Watchdogs tripped 
The MC2 watchdogs tripped. I just restored them.
I also had to relock the MZ and then the Mode Cleaner.
Entry  Mon Nov 9 11:14:57 2009, Alberto, Update, ABSL, Started working on the PSL table 
I'm working on the PSL table to set up the PLL setup for the AbsL experiment.
Entry  Mon Nov 9 12:09:10 2009, Alberto, Omnistructure, Environment, BNC Cable Laid Down from South End to East VErtex DSC_0986.JPG
I laid down the floor a BNC cable from the Y End table to the BNC Chamber. The cable runs next to the east wall.
I'm leaving the cable because it can turn useful in the future.
I'm tying the end of the cable to a big threaded steel rod on the side of the BS chamber.
Entry  Mon Nov 9 13:17:07 2009, Alberto, Configuration, ABSL, NPRO on 
I turned the auxialiary NPRO for the AbsL Experiment on. Its shutter stays closed.
Entry  Mon Nov 9 13:26:19 2009, Alberto, Omnistructure, Environment, Tidying up BNC cables rack around the lab DSC_0987.JPG
We have thousands of miles of BNC cables in the lab but we still don't find one when we need it. I decided to solve the problem.
This morning I tried to tidy up the several cable rack the we have in the lab.
i tried to dedicate each rack to a speecific type of cables: special cables, hand made cables, BNCs, LEMOs, etc.
    Reply  Mon Nov 9 14:53:47 2009, Alberto, Omnistructure, Environment, Tidying up BNC cables rack around the lab 
This would be a good trial once you put the label "BNC only" on the wall.


    
        
            Quote:
        
        
            
    Reply  Mon Nov 9 15:11:02 2009, Alberto, Update, LSC, Everything put back as it was 


    
        
            Quote:
        
        
            
            I disconnected the setup for the arm cavity TF measurement. I opened the scitation switch on the ISS medm screen. I
Entry  Mon Nov 9 16:32:36 2009, Alberto, Frogs, Environment, Shot of the white board yesterday before erasing DSC_0980.JPGDSC_0980.JPG
Yesterday Rana and I needed some room on the white board in the Control Room. We had to erase some of the stuff present on the board despite the bif
warning "Do Not Erase".
This is how it looked like before erasing.
Entry  Mon Nov 9 18:27:30 2009, Alberto, Frogs, Computers, OMC DCPD Interface Box Disconnected from the power Supply 
This afternoon I inadvertently disconnected one of the power cables coming from the power supply on the floor next to the OMC cabinet and going to the
DCPD Interface Box.
Rob reconnected the cable as it was before.
    Reply  Tue Nov 10 13:02:36 2009, Alberto, Update, LSC, X and Y Arm Cavity Poles Measurement SummaryOfFits.pdfCodeAndData.tar
From fitting the arm cavity transfer functions I got the following values for the cavity pole frequencies.
X ARM: fp_x = (1720 +/- 70) Hz
Y ARM: fp_y = (1650 +/- 70) Hz
Entry  Tue Nov 10 17:01:33 2009, Alberto, Configuration, IOO, c1ioovme and c1iool0 rebooted  
This afternoon, while I was trying to add the StochMon channels to the frames, I rebooted the c1ioovme and c1iool0.
I had to do it twice because of a mispelling in the C1IOO.INI file that the first time prevented the computer to restart properly.
Eventually I restored the old .ini file, as it was before the changes.
Entry  Tue Nov 10 17:49:20 2009, Alberto, Metaphysics, Computers, Test Point Number Mapping 
I found this interesting entry by Rana in the old (deprecated) elog : here
I wonder if Rolf has ever written the mentioned GUI that explained the rationale behind the test point number mapping.
I'm just trying to add the StochMon calibrated channels to the frames. Now I remember why I kept forgetting of doing it...
Entry  Tue Nov 10 19:19:57 2009, Alberto, Update, ABSL, Rotated polarizer on the PSL table, along the MC input pick off beam  
Aligning the beam for the PLL of the AbsL Experiement I rotated the polarizer along the path of the MC Input pick off beam (= the pick off coming from
the MC periscope).
Entry  Tue Nov 10 19:21:53 2009, Alberto, Update, ABSL, PLL Alignment 
I've been trying to lock the PLL for the AbsL Experiment but I can't see the beat (between the auxiliary NPRO and the PSL).
I believe the alignment of the PLL is not good. The Farady Isolator is definitely not perfectly aligned (you can see it from the beam spot after
it) but still it should be enough to see something at the PLL PD.
Entry  Wed Nov 11 12:29:44 2009, Alberto, Frogs, PSL, MC Locked on the wrong mode? PB110184-1.JPG
This morning, after Steve pointed out that the readout RFAMPD_DC was zero, I thought of realigning the beam on the photodiode. Maybe I touched the lens
or the beam splitter that send the beam on the diode when I installed an other beam splitter to make the measurement of the calibration between two ThorLabs
PDA255 photodiodes.
Entry  Wed Nov 11 15:04:52 2009, Alberto, Update, ABSL, Working on the AP table 
I've opened the AP table and I'm working on it.