40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 78 of 341  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  11421   Thu Jul 16 16:33:56 2015 JessicaUpdateGeneralAdded Bode Plots of Bandpass FilterI updated the bandpass filter I was using,
finding that having different stopband attenuations
before and after the passband better
 acc1_update.pngacc2_update.pngacc3_update.pngbp_BodeMag.pngbp_BodePhase.png 
  11440   Thu Jul 23 20:54:42 2015 JessicaUpdateGeneralALS Delay Line BoxThe front panels for the ALS delay   
  11441   Thu Jul 23 20:57:15 2015 JessicaSummaryGeneralApplying Pre-filter to data before IIR Wiener FilteringI updated my bandpass filter and have  BodePlot.pngacc_bandpass.pngmcl_seis.png 
  11456   Tue Jul 28 20:42:50 2015 JessicaSummaryGeneralNew Seismometer Data CoherenceI was looking at the new seismometer data
and plotted the coherence between the different
arms of 
 Coherence1.pngCoherence2.png 
  11458   Wed Jul 29 11:15:21 2015 JessicaSummaryLSCPSDs of Arms with seismometer subtractionIgnacio and I downloaded data from the
STS, GUR1, and GUR2 seismometers and from
the mode cleaner and the x and y arms. The
 Arms_PSD.pngXArm_PSD.pngYArm_PSD.png 
  11471   Thu Jul 30 18:58:36 2015 JessicaUpdateGeneralALS Delay Line Box Front Panel TestingI tested both of the front panels (conductive
and isolated SMAs) with the ALS Delay Line
Box by driving extremely close frequencies
 Xarm_diff.pngYarm_diff.pngXarm_isolated.pngYarm_isolated.png 
  11477   Mon Aug 3 18:19:09 2015 JessicaUpdateGeneralAnodization of front panels accounted forPreviously, I had gotten the same results
for the conductive and the isolated front
panels. Today, I sanded off the anodized
 redo_conduct1X.pngredo_conduct1Y.png 
  11484   Thu Aug 6 11:45:01 2015 JessicaUpdateGeneralALS Delay Line front panel testingKoji had suggested that I sync up the two
function generators to ensure that they have
the same base frequency and so that crosstalk
 conductive_X.pngconductive_Y.pngisolated_X.pngisolated_Y.png 
  11491   Tue Aug 11 10:13:32 2015 JessicaUpdateGeneralConductive SMAs seem to work bestAfter testing both the Conductive and Isolated
front panels on the ALS delay line box using
the actual beatbox and comparing this to
 best4.pngisolated4.png 
  11495   Tue Aug 11 18:43:42 2015 JessicaUpdateIOOMCL Online SubtractionToday I finished fitting the transfer function
to a vectfit model for seismometers T240_X
and T240_Y, and then used these to filter
 SeisX_bode.pngSeisY_bode.pngMCL_first.pngYarm_first.png 
  11502   Thu Aug 13 12:06:39 2015 Jessica SummaryIOOBetter predicted subtraction did not work as well OnlineYesterday I adjusted the preweighting of
my IIR fit to the transfer function of MC2,
and also managed to reduce the number of
 6x 
  6372   Wed Mar 7 13:30:17 2012 JimUpdatePEMadded TPs and JIMS channels to PEM front-end model [Jim Ryan]
The PEM model has been modified now
to include a block called 'JIMS' for the
  
  6397   Fri Mar 9 20:44:24 2012 Jim LoughUpdateCDSDAQ restart with new ini fileDAQ reload/restart
was performed at about 1315 PST today. The
previous ini file was backed up as c1pem20120309.ini
  
  12140   Mon May 30 18:19:50 2016 JohannesUpdateCDSASS medm screen updateI noticed that the TRY button in the ASS
main screen was linking to LSC_TRX instead
of LSC_TRY. Gautam fixed it.
  
  12175   Tue Jun 14 11:29:25 2016 JohannesSummaryASCYArm OpLev CalibrationIn preparation for the armloss map I checked
the calibration of the Y-Arm ITM and ETM
OpLevs with the method originally described
 CavityCoupling.pdf 
  12176   Tue Jun 14 11:52:08 2016 JohannesUpdateGeneralEPICS Installation | SURF 2016We generally want to keep the configuration
of the 40m close to that of the LIGO sites,
which is why we chose BusWorks, and it is
  
  12188   Thu Jun 16 11:25:00 2016 JohannesUpdateLSCY-Arm round-trip loss measurement with ALSUsing the ALS green beat and armlength
feedback I mapped an IR resonance of the
Y-Arm by stepping through a ramp of offset
 T_vs_steps.pdff_vs_steps.pdf 
  12192   Thu Jun 16 18:08:57 2016 JohannesUpdatePSLBefore the AOM installationThere was only one razor blade beam dump
labeled for atmospheric use left, but that's
all we need. Steve is working on restocking.
 IMG_20160615_154556392e.jpg 
  12196   Fri Jun 17 22:36:11 2016 JohannesUpdatePSLAOM installationSubham and I have placed the AOM back into
the setup right in front of the PMC.

Steps undertaken:
 aom_new_mount.jpgaom_beam_split.jpgaom_dump_IR.jpg 
  12270   Thu Jul 7 17:12:50 2016 JohannesUpdateGeneralVent progressI performed a visual inspection of ITMY
in its natural habitat today. I did not get
any great pictures from the HR side because
 IMG_2621.JPGIMG_2623.JPGIMG_2628.JPGIMG_2595.JPG 
  12291   Tue Jul 12 09:35:51 2016 JohannesUpdateGeneralSlippery substance mysteryI've noticed the spot that Rich means
before, too. I think you only notice this
when you're wearing the shoe covers,
  
  12295   Tue Jul 12 23:51:16 2016 JohannesUpdateGeneralVent progress - ETMY inspectionOn Monday I inspected ETMY, and found nothing
really remarkable. There was only little
dust on the HR side, and nothing visible
 IMG_2679.JPGIMG_2673.JPG 
  12296   Wed Jul 13 00:01:38 2016 JohannesUpdateGeneralITMX dustWe ran out of illuminator juice, and short-term
charging couldn't restore enough battery
life to continue the work. We should be able
  
  12297   Wed Jul 13 00:38:25 2016 JohannesUpdateGeneralVent progress - ETMY attempted repositioning[Lydia, Johannes]

We attempted to move the ETMY suspension
near the access port in preparation for the
  
  12310   Tue Jul 19 13:21:42 2016 JohannesUpdateGeneralVent progress - ETMY attempted repositioning[Lydia, Johannes]

We moved ITMY from its original
position to a place near the access point.
  
  12456   Wed Aug 31 18:07:43 2016 JohannesUpdateSUSITMY free swinging[Lydia, Gautam, Koji, Johannes]

Summary of things done today:
  
  12464   Thu Sep 1 19:18:14 2016 JohannesUpdateSUSITMX and ETMX preemptive table levelingI balanced the ITMX and ETMX tables into
level position today, for which I had to
move quite a few of the on-table weights.
 8x 
  12465   Thu Sep 1 19:59:22 2016 JohannesUpdateSUSIR mode flashes in Y arm[Gautam, Lydia, Johannes]


After placing the irises
on the ETMY and ITMY cages we found that
  
  12482   Mon Sep 12 17:15:22 2016 JohannesUpdateGeneralPRM SRM alignment[Gautam, Steve, Johannes]

We put on the remaining heavy doors
on the chambers (ITMY, ITMX,ETMX, in this
 IMG_3273.JPGIMG_3275.JPG 
  12493   Wed Sep 14 19:41:23 2016 JohannesUpdateGeneralPSL back to high powerToday's summary:


Replaced mirror in MC REFL
path with R=10% BS and aligned beam on PD
  
  12524   Thu Sep 29 20:21:29 2016 JohannesUpdateGeneralYARM loss measurement[Gautam, Johannes]

I scripted a series of YARM DC
reflectivity measurements last night alternating
  
  12528   Mon Oct 3 21:24:02 2016 JohannesUpdateGeneralXARM loss measurement[gautam, johannes]

I started a script on Friday night
to collect some data for a reflection armloss
 ReflectionLoss.pdf 
  12531   Tue Oct 4 22:18:24 2016 JohannesUpdateGeneralX/YARM loss measurement[gautam, johannes]

We let the PSL shutter closed overnight
and observed the POXDC, POYDC and ASDC offsets.
 anomalousData.png 
  12581   Wed Oct 26 16:06:01 2016 JohannesUpdateGeneralAutolocker maintenance[Gautam, Johannes]

The autolocker was acting up today,
Gautam traced it to EPICS channels ( namely
  
  12604   Mon Nov 7 19:49:44 2016 JohannesUpdateCDSacromag chassis hooked up to PSL[Lydia, Johannes]

We're waiting on the last couple
electrical components to arrive that are
 acromag_chassis_location.jpgacromag_chassis_top_view.jpg 
  12614   Mon Nov 14 19:15:57 2016 JohannesUpdateGeneralAchievable armloss measurement accuracyLooking back at elog
12528, the uncertainty in the armloss
number from the individual quantities in
  
  12617   Tue Nov 15 20:26:35 2016 JohannesUpdateCamerasBasler GigE-Camera on Optimus (+Mafalda dead)I powered up the existing ace100gm GigE
cam with the PoE injector and tried to interface
with it as described in elog
 gige_test.png 
  12618   Tue Nov 15 20:35:19 2016 JohannesUpdateGeneralAchievable armloss measurement accuracyI had a mistake in my script that reported
the wrong error after averaging several datapoints,
and because I hadn't looked at the individual
  
  12624   Thu Nov 17 21:54:11 2016 JohannesUpdateGeneralAchievable armloss measurement accuracyI don't like AS110 or AS55.
Neither of them are designed for DC and so
the DC readout chain is hokey. How
  
  12625   Fri Nov 18 00:25:08 2016 JohannesOmnistructure40m upgradingAcromag Chassis DevelopmentI had Rich show me his approach to a chassis
for the Acromag modules. The document tree
for his design can be found on the DCC.
 acromag_bareboard.PNGXT_digital_340px_0.jpg 
  12632   Mon Nov 21 19:54:13 2016 JohannesUpdateCDSacromag chassis hooked up to PSL[Lydia, Johannes]

We connected and powered up the
Acromag chassis today. It lives in 1X4 and
 acromag_chassis.jpg 
  12634   Tue Nov 22 13:55:32 2016 JohannesOmnistructure40m upgradingAcromag ChassisCurrent Acromag chassis status:

I found out that Acromag offers
DIN rail mounting kits for the open boards,
 acroplan.pdf 
  12651   Wed Nov 30 14:54:01 2016 JohannesUpdateCDSSlow machine replacementI was talking with Larry yesterday, and
he suggested the rack-mounted supermicro
machines SYS-5017A-EP
  
  12704   Thu Jan 12 02:45:53 2017 JohannesUpdateGeneralNext armloss stepsAs stated in elog
12618, using an oscilloscope to average
the reflected powers and thus circumventing
 ass_illustration.pdf 
  12710   Fri Jan 13 08:54:32 2017 JohannesUpdateGeneralDC PD installedI installed a DC PD (Thorlabs PDA 520)
in the beam path to AS55. I placed a 2"
 ASDCPD_up.jpgASDCPD_down.jpgscrambled_osci.jpg 
  12781   Tue Jan 31 22:15:02 2017 JohannesUpdateCDSvme crate backplane adapter boardsI made a crude sketch for how Lydia and
I envision the connector situation on the
back of the vme crates to be solved. Essentially
 vme_backplane_conn_sketch.jpg 
  12810   Tue Feb 7 19:14:59 2017 JohannesUpdateCDSvme crate backplane adapter board layoutAfter fighting with Altium for what seems
like an eternity I have finished putting
my vision of the vme crate backplane adapter
 vme_backplane.pdf 
  12829   Wed Feb 15 00:26:44 2017 JohannesUpdateDAQpanels and pcbsI finished designing the PCBs for the VME
crate back sides (see attached). The project
files live on the DCC now at https://dcc.ligo.org/LIGO-D1700058.
 acromag_chassis_panel.pdfvme_backplane_panel.pdfrfAmp.pdf 
  14496   Tue Mar 26 04:25:13 2019 JohannesUpdateUpgradec1susaux upgrade plan


Quote:


  
  97   Mon Nov 12 23:44:19 2007 JohnUpdatePSLISS[quote]
After John soldered a 3.7 MHz notch filter
onto the ISS board, I took a quick TF and
 ISSfilter.jpg 
ELOG V3.1.3-