  40m Log, Page 75 of 344  Not logged in ELOG logo
ID Date Author Type Categorydown Subject Text Attachments
  2829   Wed Apr 21 22:11:48 2010 ranaUpdatePSLInnolight 2W Vertical Beam ProfileBack in Gainesville in 1997, I learned
how to do this using the chopper wheel.
  
  2830   Wed Apr 21 23:35:37 2010 KojiUpdatePSLInnolight 2W Vertical Beam ProfileGood fit. I assumed sqrt(x) is a typo of
sqrt(2).

  
  2834   Thu Apr 22 21:42:24 2010 AlbertoUpdatePSLInnolight 2W Vertical Beam Profile 
 What kind of fit did you use?
How are the uncertainties in the parameters
  
  2837   Sat Apr 24 15:05:41 2010 KevinUpdatePSL2W Vertical Beam ProfileThe vertical beam profile of the Innolight
2W laser was measured at eight points along
the axis of the laser.
 vbp.jpg 
  2838   Sat Apr 24 15:50:47 2010 KojiUpdatePSLre: 2W Vertical Beam Profile1. The vertical axis should start from
zero. The horizontal axis should be extended
so that it includes the waist. See Zach's
  
  2846   Mon Apr 26 16:51:37 2010 KevinUpdatePSLre: 2W Vertical Beam ProfileI tried Koji's suggestions for improving
the fit to the vertical beam profile; however,
I could not improve the uncertainties in
  
  2847   Mon Apr 26 17:34:31 2010 KojiUpdatePSLre: 2W Vertical Beam ProfileGive me the plot of the fit, otherwise
I am not convinced.

  
  2851   Tue Apr 27 15:29:16 2010 KevinUpdatePSLre: 2W Vertical Beam ProfileI thought that the micrometer I was using
to move the razor through the laser beam
was metric; however, it is actually english.
 vbp.jpgvbp_residuals.jpg 
  2857   Wed Apr 28 14:22:36 2010 KevinUpdatePSLre: 2W Vertical Beam ProfileI used the Mathematica CurveFit package
that we use in Ph6/7 to make the fits for
the beam profile data. I wrote two functions
 BeamFit.nb.tar 
  2859   Wed Apr 28 16:15:02 2010 KevinUpdatePSLAccelerometer CalibrationKoji, Steve, and Kevin looked into calibrating
the Wilcoxon accelerometers. Once calibrated,
the accelerometers will be used to monitor
  
  2873   Mon May 3 17:49:41 2010 ranaConfigurationPSLRC Temperature Servo Turned OFF temporarily


   
        
            
 rct.png 
  2875   Tue May 4 02:28:38 2010 ranaConfigurationPSLRC Temperature Servo Turned OFF temporarily 
 My attempt to passively measure
  
  2876   Tue May 4 06:32:58 2010 albertoConfigurationPSLRC Temperature Servo Turned OFF temporarily


   
        
            
  
  2881   Wed May 5 02:37:55 2010 ranaConfigurationPSLRC Temperature Servo Turned OFF temporarily


   
        
            
 Picture_7.png 
  2883   Wed May 5 16:58:21 2010 KojiUpdatePSL2W hooked up to the interlock serviceBen, Steve, and Koji
Ben came to the 40m and hooked up
a cable to the main interlock service.
  
  2898   Fri May 7 21:55:59 2010 kiwamuUpdatePSLremove Mach-Zehnder [Koji, Kiwamu]
The
 NO_MachZehnder_s.jpg 
  2976   Mon May 24 16:34:22 2010 KevinUpdatePSLND Filters for 2W Beam ProfileI tried to measure the beam profile of
the 2W laser today but ran into problems
with the ND filters. With the measurements
  
  3014   Sun May 30 13:26:07 2010 rana, kiwamuUpdatePSLnew HIGH-LOW value for PMC_TRANSWe changed
the HIGH/LOW values of the PMC_TRANS.
  
  3016   Sun May 30 15:36:22 2010 AlbertoConfigurationPSLIMC periscope shutterTwo days ago I opened the PSL shutter by
switching the switch on the shutter driver.
That caused the shutter's switch on the medm
  
  3028   Tue Jun 1 20:40:03 2010 KojiUpdatePSLnew HIGH-LOW value for PMC_TRANSThe alarm had kept crying. I reduced the
LOW to be 0.90 and the LOLO
to be 0.85 both in psl.db and with ezcawrite.
  
  3030   Wed Jun 2 03:24:22 2010 KevinUpdatePSL2W Beam Profile[Rana, Kiwamu, Kevin]
The Innolight 2W beam profile was
measured with the beam scan. A W2-IF-1025-C-1064-45P
 profile.pngerrors.pngLayout.jpg 
  3032   Wed Jun 2 04:27:02 2010 KojiUpdatePSL2W Beam ProfileThis is what I already told to Kevin and
Rana:
A direct output beam is
  
  3040   Wed Jun 2 22:25:39 2010 KevinUpdatePSLLow Power 2W Beam ProfileKoji is worried about thermal lensing introducing
errors to the measurement of the 2W beam
profile so I measured the profile at a lower
 profile_low.png 
  3041   Wed Jun 2 22:58:04 2010 KevinUpdatePSL2W Second Reflected Beam Profile[Koji, Kevin]
The profile of the Innolight 2W was
previously measured by measuring the reflected
 profile_2nd.png 
  3042   Thu Jun 3 00:47:17 2010 KevinUpdatePSL2W Beam Profile of Second Reflected Beam[Koji, Kevin]

The profile of the Innolight 2W was
 profile_2nd.png 
  3109   Wed Jun 23 18:05:00 2010 KojiConfigurationPSLFSS SLOWDC should be ~-4.0FSS SLOWDC slider is at around 0.

Please someone relock this at ~-4.0 to exploit
 C1PSL_FSS.png 
  3110   Wed Jun 23 23:08:30 2010 ranaConfigurationPSLFSS SLOWDC should be ~-4.0 
  
  3163   Wed Jul 7 00:15:29 2010 tara,RanaSummaryPSLpower spectral density from RefCav transmitted beam I measured
the RC transmitted light signals here at
the 40m. I made all connections through
 RIN_rftrans.pngtara.png 
  3164   Wed Jul 7 10:42:29 2010 KojiSummaryPSLpower spectral density from RefCav transmitted beam How do you calibrate this to Hz/rtHz?

  
  3189   Fri Jul 9 20:16:19 2010 ranaSummaryPSLThings I did to the PSL today: Refcav, PMC, cameras, etc.I re-aligned the beam into the PMC. I got
basically no improvement. So I instead changed
the .LOW setting so that PMCTRANS would no
  
  3190   Sun Jul 11 20:11:48 2010 ranaSummaryPSLRC trend after the insulation removal   rc.png 
  3196   Mon Jul 12 14:22:36 2010 JenneSummaryPSLThings I did to the PSL today: Refcav, PMC, cameras, etc.


   
        
            
  
  3210   Tue Jul 13 21:04:49 2010 tara,ranaSummaryPSLTransfer function of FSS servo I
measured FSS's open loop transfer function.
 TF_FSS_ser.png 
  3232   Thu Jul 15 19:27:04 2010 ranaSummaryPSLRC trend after the insulation removal   Untitled.pnga.pngb.png 
  3240   Fri Jul 16 20:25:52 2010 MeganUpdatePSLReference Cavity InsulationRana and I
1) took the temperature sensors off
the reference cavity;
 DSC_2271.JPGDSC_2266.JPG 
  3241   Fri Jul 16 23:53:27 2010 RanaUpdatePSLReference Cavity InsulationFrom the trend, it seems that the Reference
Cavity's temperature servo is working fine
with the new copper foil. I was unable to
  
  3260   Wed Jul 21 15:43:38 2010 MeganSummaryPSLCopper Layer Thickness on the Reference CavityUsing the equation for thermal resistance
Rthermal = L/(k*A)
where k is the thermal conductivity
  
  3268   Thu Jul 22 14:07:20 2010 kiwamuUpdatePSLPSL front end machineIt
looks like something wrong happened around
the PSL front end.  One
 PSL-PMC2010-07-22.png 
  3269   Thu Jul 22 15:59:29 2010 AlbertoUpdatePSLPSL front end machine


   
        
            
  
  3270   Thu Jul 22 18:18:54 2010 AlbertoUpdatePSLProblem Solved


   
        
            
  
  3271   Fri Jul 23 00:13:11 2010 ranaUpdatePSLProblem NOT REALLY SolvedSo...who was working around the PSL rack
this morning and afternoon? Looks like there was
  
  3272   Fri Jul 23 08:15:59 2010 steveUpdatePSLref cavity ion pumpThe ref cavity ion pump was running at
7.7kV instead of 5kV
This Digitel SPC-1 20 l/s ion pump
  
  3280   Fri Jul 23 16:02:16 2010 RanaUpdatePSLReference Cavity InsulationThis is the trend so far with the copper
foil wrapping. According to Megan's calculation,
we need ~1 mm of foil and the thickness of
 Untitled.png 
  3282   Fri Jul 23 21:14:29 2010 RanaUpdatePSLReference Cavity InsulationI wrapped another ~3 layers onto there.
It occurs to me now that we could just get
some 2mm thick copper plates made to fit
  
  3346   Sun Aug 1 21:40:27 2010 ranaSummaryPSLFSS: SLOWDC responseI bet you thought that the NPRO slow actuator
response could be well represented by a pole
at ~0.1 Hz? Well, that's just what they want
 Untitled.png 
  3364   Thu Aug 5 00:17:41 2010 KojiUpdatePSLPSL preparation workWe start the work on the cables at around
the PSL table.
  
  3369   Thu Aug 5 17:59:23 2010 KojiUpdatePSLCable removal from the control room[Alberto, Kiwamu, and Koji]
We removed the BNC cables from the
control room. 
 IMG_2684.jpg 
  3370   Thu Aug 5 22:36:11 2010 KojiUpdatePSLPSL preparation workPSL preparation work

  
  3371   Fri Aug 6 08:09:15 2010 steveUpdatePSLPSL preparation work


   
        
            
  
  3381   Fri Aug 6 20:00:03 2010 KojiUpdatePSLPSL preparation workPSL preparation work report
Aug 6th
10am-5pm: (Steve
 PSL_cable_map.pdf 