Wed Feb 27 14:59:01 2013, Evan, Update, , Altered MC demodulation phase 
|
Wed Feb 27 14:39:59 2013, Annalisa, Update, LSC, Fibre laid for RFPD audio
|
Wed Feb 27 14:53:02 2013, Steve, Update, LSC, what is the Fibox ?
|
Tue Feb 12 00:14:00 2013, yuta, Update, Locking, PRM coil balancing
|
Sat Feb 16 17:27:26 2013, yuta, Update, SUS, PRM coil balanced
|
Sun Feb 17 19:27:19 2013, rana, Update, SUS, PRM coil balanced
|
Wed Feb 27 11:59:43 2013, yuta, Update, SUS, PRM/BS coil re-balanced 
|
Sat Feb 23 00:34:28 2013, yuta, Update, Computers, crontab in op340m deleted and restored (maybe)
|
Sat Feb 23 15:26:26 2013, yuta, Update, Computers, crontab in op340m updated
|
Sat Feb 23 15:46:16 2013, rana, Update, Computers, crontab in op340m updated
|
Wed Feb 27 11:22:54 2013, yuta, Update, Computers, backup crontab
|
Wed Feb 27 02:52:40 2013, Jenne, Omnistructure, SAFETY, Back door unlocked
|
Wed Feb 27 00:56:01 2013, Jenne, Update, ASS, Motivation for reactivating the ASS
|
Wed Feb 27 02:21:55 2013, Jenne, Update, ASS, Motivation for reactivating the ASS
|
Wed Feb 27 00:08:43 2013, Jenne, Update, IOO, Meditations on converting TT channels to be more SUS-like
|
Tue Feb 26 17:56:15 2013, Brett, Update, SUS, Global Damping Update
|
Tue Feb 26 17:36:28 2013, Chloe, Update, , QPD Circuit
|
Tue Feb 26 16:13:18 2013, Brett, Update, SUS, ITMY and ETMY mysterious loop gain difference of 2.5
|
Tue Feb 26 10:20:31 2013, Jamie, Update, SUS, MC2 suspension controller reverted to library part
|
Tue Feb 26 10:17:44 2013, Jamie, Update, SUS, removed global/local switch from sus_single_control
|
Tue Feb 26 09:55:46 2013, Steve, Update, SAFETY, Evan receives safety training
|
Mon Feb 25 20:49:07 2013, Brett, Update, SUS, Minor Mod made to SUS_GLOBAL block
|
Mon Feb 25 20:25:33 2013, Brett, Update, SUS, New Global Damping MEDM Screens
|
Mon Feb 25 20:04:22 2013, Jamie, Update, SUS, suspension controller model modifications in prep for global damping initiative 
|
Mon Feb 25 13:01:39 2013, Koji, Summary, General, Quick, compact, and independent tasks
|
Wed Feb 20 23:25:50 2013, Zach, Summary, Electronics, Replacement for the AD743: OPA140 and OPA827
|
Sat Feb 23 18:01:38 2013, Zach, Summary, Electronics, Replacement for the AD743: OPA140 and OPA827  
|
Sun Feb 24 16:49:00 2013, rana, Summary, Electronics, Replacement for the AD743: OPA140 and OPA827
|
Sat Feb 23 07:14:58 2013, yuta, Update, LSC, can't lock Y arm
|
Sat Feb 23 14:52:03 2013, Jenne, Update, LSC, ETMYT camera back to normal
|
Sat Feb 23 16:54:24 2013, Jenne, Update, LSC, can't lock Y arm
|
Sat Feb 23 17:14:59 2013, yuta, Update, LSC, can't lock Y arm
|
Sat Feb 23 16:16:11 2013, Max Horton, Update, Summary Pages, Multiprocessing
|
Fri Feb 22 20:28:17 2013, Jamie, Update, Computers, linux1 dead, then undead
|
Sat Feb 23 14:04:07 2013, Koji, Update, Computers, apache retarted (Re: linux1 dead, then undead)
|
Sat Feb 23 00:36:52 2013, Manasa, Summary, Locking, MC locked
|
Fri Feb 22 17:33:38 2013, Chloe, Update, , QPD circuit diagram
|
Thu Feb 21 19:55:02 2013, Manasa, Update, Locking, Green locking in arms
|
Thu Feb 21 18:10:13 2013, rana, Update, SEI, Pump Down misalignments
|
Sat Jan 19 15:05:37 2013, Jenne, Update, Computers, All front ends but c1lsc are down
|
Sat Jan 19 18:23:31 2013, rana, Update, Computers, All front ends but c1lsc are down
|
Wed Jan 30 13:50:27 2013, Jenne, Update, Computers, c1iscex still down
|
Thu Jan 31 10:23:39 2013, Jamie, Update, Computers, c1iscex still down
|
Fri Feb 15 15:21:07 2013, Jamie, Update, Computers, c1iscex IO-chassis dead
|
Tue Feb 19 15:10:02 2013, Jamie, Update, CDS, c1iscex alive again
|
Thu Feb 21 12:56:38 2013, Jenne, Update, CDS, c1iscex dead again
|
Thu Feb 21 14:32:02 2013, Jamie, Update, CDS, c1iscex models restarted
|
Fri Jan 4 15:11:28 2013, Jenne, Update, , TT
|
Mon Jan 14 15:15:04 2013, Jenne, Update, , TT
|
Mon Jan 14 19:56:48 2013, Manasa, Update, , TT
|
Tue Jan 15 01:41:40 2013, rana, Update, SUS, TT
|
Thu Feb 21 13:34:35 2013, Jenne, Update, Treasure, IR card removed
|
Wed Feb 20 01:40:37 2013, Manasa, Update, Alignment, Final IFO alignment- in progress
|
Wed Feb 20 03:13:10 2013, yuta, Update, Alignment, clipping centering checklist
|
Wed Feb 20 20:58:37 2013, yuta, Update, Alignment, clipping centering checklist
|
Wed Feb 20 21:12:37 2013, rana, Update, Alignment, clipping centering checklist
|
Wed Feb 20 21:56:08 2013, yuta, Update, Alignment, clipping centering checklist
|
Wed Feb 20 10:13:41 2013, yuta, Update, Alignment, PRC flashing brighter than last week
|
Wed Feb 20 18:53:48 2013, Jenne, Update, Alignment, IFO ready for doors, then pumping
|
Wed Feb 20 19:48:16 2013, yuta, Update, Alignment, BS table oplev re-arranged
|
Wed Feb 20 19:58:59 2013, rana, Update, Alignment, BS table oplev re-arranged
|
Wed Feb 20 20:15:29 2013, yuta, Update, Alignment, SRM oplev status
|
Wed Feb 20 19:20:50 2013, Evan, Update, Alignment, AS camera alignment
|
Wed Feb 20 18:35:42 2013, Jenne, Update, Alignment, New in-vac alignment procedure
|
Thu Feb 14 08:29:41 2013, Steve, Update, IOO, low MC1 OSEM voltage
|
Tue Feb 19 09:37:23 2013, Steve, Update, IOO, low MC1 OSEM voltage 
|
Tue Feb 19 12:02:00 2013, Jamie, Update, IOO, IMC table levelling.
|
Tue Feb 19 19:55:52 2013, yuta, Update, IOO, MC yaw input tuned
|
Tue Feb 19 17:14:56 2013, Chloe, Update, , QPD Circuit
|
Tue Feb 19 15:40:34 2013, Charles, Update, ISS, ISS Prototype 
|
Tue Feb 19 08:42:31 2013, Koji, Update, VAC, ETMX door open
|
Fri Feb 15 20:07:28 2013, yuta, Update, Alignment, POP path set up but AS55 is broken
|
Fri Feb 15 21:22:29 2013, yuta, Update, Electronics, AS55 replaced with POP55 PD
|
Mon Feb 18 21:43:05 2013, Koji, Update, Alignment, POP path set up but AS55 is broken
|
Tue Feb 19 00:21:09 2013, yuta, Update, Electronics, POP path set up but AS55 is broken
|
Tue Feb 19 05:42:28 2013, Koji, Update, Electronics, POP path set up but AS55 is broken
|
Tue Feb 19 08:06:02 2013, yuta, Update, Electronics, POP path set up but AS55 is broken
|
Mon Feb 18 23:41:15 2013, Sendhil, Update, Alignment, Aligned IPPOS, IPANG and OPLEVS
|
Mon Feb 18 11:54:15 2013, Max Horton, Update, Summary Pages, Timing Issues and Calendars
|
Mon Feb 18 00:03:46 2013, Zach, Update, Computer Scripts / Programs, ARBCAV v3.0
|
Sat Feb 16 19:23:17 2013, yuta, Update, LSC, PR2 flipped PRMI locked
|
Fri Feb 15 17:11:13 2013, Chloe, Update, , QPD circuit pictures 
|
Fri Feb 15 09:58:49 2013, Steve, Update, General, beam traps ready to be installed 
|
Fri Feb 15 16:09:19 2013, Koji, Update, General, beam traps ready to be installed 
|
Fri Feb 15 01:41:02 2013, Manasa, Yuta, Summary, Alignment, IFO aligned and ready for PRMI locking
|
Fri Feb 15 01:51:43 2013, Jenne, Summary, Alignment, IFO aligned and ready for PRMI locking
|
Wed Feb 13 19:09:32 2013, yuta, Summary, General, possible explanations to oval REFL beam
|
Wed Feb 13 19:30:45 2013, Koji, Summary, General, possible explanations to oval REFL beam
|
Wed Feb 13 19:41:07 2013, yuta, Summary, General, possible explanations to oval REFL beam
|
Wed Feb 13 22:09:26 2013, Jenne, Update, Alignment, REFL is not clipped
|
Thu Feb 14 00:10:12 2013, yuta, Summary, Alignment, REFL is not clipped
|
Thu Feb 14 10:42:41 2013, Jamie, Summary, Alignment, MMT, curved TTs does not explain beam ellipticity at Faraday 
|
Wed Feb 13 16:31:08 2013, Jenne, Update, PSL, PMC pitch input tuned, MC yaw input tuned
|
Wed Feb 6 11:59:12 2013, Jenne, Update, Locking, PRC cavity gains
|
Wed Feb 6 18:39:08 2013, Jenne, Update, Locking, PRC cavity gains
|
Wed Feb 6 19:59:35 2013, rana, Update, Locking, PRC cavity gains
|
Wed Feb 6 20:03:50 2013, Manasa, Update, Locking, PRC cavity gains
|
Wed Feb 13 14:21:19 2013, Jenne, Update, Locking, PRC cavity gains
|
Wed Feb 6 20:19:52 2013, Manasa, Update, Optics, G&H and LaserOptik mirrors
|
Thu Feb 7 14:10:25 2013, Manasa, Update, Optics, LaserOptik - AR Reflectivity - Bad data 
|
Fri Feb 8 21:14:52 2013, Manasa, Update, Optics, G&H - AR Reflectivity 
|
Fri Feb 8 22:49:31 2013, Koji, Update, Optics, G&H - AR Reflectivity
|
Fri Feb 8 23:04:40 2013, Manasa, Update, Optics, G&H - AR Reflectivity
|
Sat Feb 9 19:34:34 2013, rana, Update, Optics, G&H - AR Reflectivity
|
Mon Feb 11 19:55:47 2013, Manasa, Update, Optics, G&H - AR Reflectivity
|
Wed Feb 13 09:28:56 2013, Steve, Update, Optics, G&H - HR plots
|
Sun Feb 3 13:20:02 2013, Koji, Summary, General, Hypothesis 
|
Mon Feb 4 10:45:51 2013, Jamie, Summary, General, rough analysis of aligned PRM-PR2 mode scan
|
Mon Feb 4 11:10:59 2013, Koji, Summary, General, rough analysis of aligned PRM-PR2 mode scan
|
Mon Feb 4 19:33:19 2013, yuta, Summary, General, rough analysis of aligned PRM-PR2 mode scan
|
Tue Feb 5 02:04:44 2013, yuta, Summary, General, rough analysis of aligned PRM-PR2 mode scan
|
Tue Feb 5 03:16:51 2013, Koji, Summary, General, rough analysis of aligned PRM-PR2 mode scan
|
Tue Feb 5 10:09:08 2013, yuta, Summary, General, rough analysis of aligned PRM-PR2 mode scan
|
Tue Feb 5 11:30:19 2013, Koji, Summary, General, rough analysis of aligned PRM-PR2 mode scan
|
Wed Feb 13 01:26:08 2013, yuta, Summary, General, rough analysis of aligned PRM-PR2 mode scan
|
Wed Feb 6 15:20:55 2013, yuta, Summary, General, FWHM was wrong
|
Mon Feb 4 15:06:56 2013, Koji, Summary, General, Hypothesis
|
Mon Feb 4 19:48:32 2013, Jamie, Summary, General, arbcav recalc of PRC with correct ITM transmission 
|
Tue Feb 12 20:42:36 2013, Jamie, Update, Alignment, IFO alignment in prep for in-air PRMI
|
Tue Feb 12 20:57:47 2013, Jenne, Update, Alignment, IFO alignment in prep for in-air PRMI
|
Tue Feb 12 23:24:17 2013, yuta, Update, Alignment, IFO alignment in prep for in-air PRMI
|
Mon Jan 28 19:15:14 2013, Manasa, Update, Scattering, Scattering setup
|
Wed Jan 30 11:18:31 2013, Manasa, Update, Scattering, Scattering setup
|
Thu Jan 31 11:53:31 2013, Manasa, Update, Scattering, Scattering setup
|
Tue Feb 12 23:22:14 2013, Manasa, Update, Scattering, Scattering setup
|
|