  13458   Wed Nov 29 21:40:30 2017 johannesOmnistructureComputersSlow DAQ replacement computer progress[Aaron, Johannes]

We
configured the AtomServer for the Martian
  
  13457   Wed Nov 29 15:33:16 2017 ranaUpdatePSLPMC lockingPMC wasn't locking. Had to power down
c1psl. Did burt restore. Still not great.

I think many of the readbacks on
  
  13456   Tue Nov 28 17:27:57 2017 awadeBureaucracyCalibration-RepairSR560 return, still not chargingI brought a bunch of SR560s over for repair
from Bridge labs. This unit, picture attached
(SN 49698), appears to still not be
 96B6ABE6-CC5C-4636-902A-2E5DF553653D.jpegimage.jpg 
  13455   Tue Nov 28 16:02:32 2017 ranaUpdatePEMseismometer can testingI've ordered 4 of these from McMaster.
Should be delivered to the 40m by noon tomorrow.

  
  13454   Sun Nov 26 19:38:40 2017 SteveUpdateVACTP3 drypump replaced againThe TP3 foreline pressure was 4.8 Torr,
50K rpm 0.54A and 31C........Maglev rotation
normal 560 Hz.......    IFO pressure
 after_replacement.png 
  13453   Thu Nov 23 18:03:52 2017 gautamUpdateOptical LeversOplev "noise budget"Here are a couple of preliminary plots
of the noise from a 20minute stretch of data
- the new curve is the orange
 ITMY_P_noise.pdfITMY_Y_noise.pdf 
  13452   Wed Nov 22 23:56:14 2017 gautamUpdateOptical LeversOplev "noise budget"Do not turn
on BS/ITMY/SRM/PRM Oplev servos without reading
  
  13451   Wed Nov 22 19:20:01 2017 ranaUpdateOptical LeversOplev "noise budget"too complex; just shoot straight from the
HeNe to the QPD. We lower the gain of the
QPD by changing the resistors; there's
  
  13450   Wed Nov 22 17:52:25 2017 gautamUpdateOptimal ControlVisualizing cost functionsI've attempted to visualize the various
components of the cost function in the way
I've defined it for the current iteration
 globalCosts.pdf 
  13449   Wed Nov 22 16:40:00 2017 KojiUpdateOptical LeversOplev "noise budget"You may want to consult with the cryo Q
people (Brittany, Aaron) for a Si QPD. If
you want the same QPD architecture, I can
  
  13448   Wed Nov 22 15:29:23 2017 gautamUpdateOptical LeversOplev "noise budget"[steve,
gautam]

What is the best way to set this
 OplevTest.jpg 
  13447   Wed Nov 22 14:47:03 2017 KiraUpdatePEMseismometer can testingFor the insulation, I have decided to use
this
one (Buna-N/PVC Foam Insulation
  
  13446   Wed Nov 22 12:13:15 2017 KiraUpdatePEMseismometer can testingUpdated some values, most importantly,
the k-factor. I had assumed that it was in
the correct units already, but when converting
 cooling_fit_1.png 
  13445   Wed Nov 22 11:51:38 2017 gautamConfigurationComputersnodus post OS migration adminConfirmed that this crontab is running
- the daily backup of the crontab seems to
have successfully executed, and there is
  
  13444   Wed Nov 22 05:41:32 2017 ranaUpdateOptical LeversOplev "noise budget"For the OL NB, probably don't have
to fudge any seismic noise, since that's
a thing we want to suppress. More important
  
  13443   Wed Nov 22 00:54:18 2017 johannesOmnistructureComputersSlow DAQ replacement computer progressI got the the SuperMicro 1U server box
from Larry W on Monday and set it up in the
CryoLab for initial testing.
  
  13442   Tue Nov 21 23:47:51 2017 gautamConfigurationComputersnodus post OS migration adminI restored the nodus crontab (copied over
from the Nov 17 backup of the same at /opt/rtcds/caltech/c1/scripts/crontab/crontab_nodus.20171117080001.
There wasn't a crontab, so I made one
  
  13441   Tue Nov 21 23:04:12 2017 gautamUpdateOptical LeversOplev "noise budget"Per our discussions in the meetings over
the last week, I've tried to put together
a simple Oplev noise budget. The only two
 vertexOL_noises.pdf 
  13440   Tue Nov 21 17:51:01 2017 KojiConfigurationComputersnodus post OS migration adminThe post OS migration admin for nodusa
bout apache, elogd, svn, iptables, etc can
be found in https://wiki-40m.ligo.caltech.edu/NodusUpgradeNov2017
  
  13439   Tue Nov 21 16:28:23 2017 gautamUpdateOptical LeversBS OL calibration updatedThe numbers I have from the fitting don't
agree very well with the OSEM readouts. Attachment
#1 shows the Oplev pitch and yaw channels,
 BS_oplev_sweep.png 
  13438   Tue Nov 21 16:00:05 2017 KiraUpdatePEMseismometer can testingI performed a test with the can last week
with one layer of insulation to see how well
it worked. First, I soldered two heaters
 cooling_fit.pngIMG_20171121_164835.jpg 
  13437   Tue Nov 21 11:37:29 2017 gautamUpdateOptical LeversBS OL calibration updatedI calibrated the BS oplev PIT and YAW error
signals as follows:


Locked X-arm, ran dither
 OL_calib_BS_PERROR.pdfOL_calib_BS_YERROR.pdfVertexOLnoise_updated.pdf 
  13436   Tue Nov 21 11:21:26 2017 gautamUpdateCDSRFM network downI noticed yesterday evening that I wasn't
able to engage the single arm locking servos
- turned out that they weren't getting
 RFMerrors.png 
  13435   Fri Nov 17 17:10:53 2017 ranaOmnistructureComputersAcromag wired upExactly: you'll have to list explicitly
what functions those channels had so that
we know what we're losing before we make
  
  13434   Fri Nov 17 16:31:11 2017 aaronOmnistructureComputersAcromag wired upAcromag
Wireup Update

I
finished wiring up the Acromags to replace
 AcromagWiringMaps.pdf 
  13433   Thu Nov 16 15:43:01 2017 ranaUpdateOptical LeversOptical lever noiseI bet the calibration
is out of date; probably we replaced the
  
  13432   Thu Nov 16 13:57:01 2017 gautamUpdateOptical LeversOptical lever noiseI disabled the OL loops for ITMX, ITMY
and BS at GPStime 1194897655 to come up with
an Oplev noise budget. OL spots were reasonably
 VertexOLnoise.pdfITMYvsSRM.pdf 
  13431   Thu Nov 16 00:53:26 2017 gautamUpdateLSCDRMI noise sub-budgetsI've incorporated the functionality
to generate sub-budgets for the various grouped
traces in the NBs (e.g. the "A2L"
 C1NB_a2l_40m_MICH_NB_2017-11-15.pdfC1NB_aux_40m_MICH_NB_2017-11-15.pdf 
  13430   Thu Nov 16 00:45:39 2017 gautamUpdateSUSSOS Sapphire Prism design 




  
  13429   Thu Nov 16 00:14:47 2017 Udit KhandelwalUpdateSUSSOS Sapphire Prism designSummary:


SOS solidworks model is
nearly complete

Having trouble
  
  13428   Wed Nov 15 01:37:07 2017 gautamUpdateLSCDRMI low freq. nosie improvedPianosa
just crashed and ate my elog, along with
 C1NB_disp_40m_MICH_NB_2017-11-15.pdfOL_A2L_couplings.pdf 
  13427   Tue Nov 14 16:02:43 2017 KiraSummaryPEMseismometer can testingI made a model for our seismometer can
using actual data so that we know approximately
what the time constant should be when we
 time_const.png 
  13426   Tue Nov 14 08:54:37 2017 SteveUpdateIOOMC1 glitching   MC1_glitching.png 
  13425   Fri Nov 10 18:57:41 2017 ranaSummaryElectronicsIthaca 1201 vs. SR560I characterized the black
Ithaca 1201 pre-amp that we had sitting
in the racks. It works fine and the input
 Ithaca1201.pdf 
  13424   Fri Nov 10 13:46:26 2017 SteveUpdatePEMM3.1 local earthquakeBOOM
SHAKA-LAKA
 3.1M_local_EQ.png 
  13423   Fri Nov 10 08:52:21 2017 SteveUpdateVACTP3 drypump replacedPSL shutter closed at 6e-6 Torr-it    

   The foreline pressure
of the drypump is 850 mTorr at 8,446 hrs
  
  13422   Thu Nov 9 15:33:08 2017 johannesUpdateCDSrevisiting Acromag


  
  13421   Thu Nov 9 10:51:37 2017 gautamSummaryLSCcurrent procedure for compiling and installing c1dnn codeJamie pointed out that the compile and
install instructions are different for c1dnn:

  
  13420   Wed Nov 8 17:04:21 2017 gautamUpdateCDSgds-2.17.15 [not] installedI wanted to use the foton.py utility for
my NB tool, and I remember Chris telling
me that it was shipping as standard with
  
  13419   Wed Nov 8 16:39:24 2017 KiraUpdatePEMADC noise measurementGautam and I measured the noise of the
ADC for channels 17, 18, and 19. We plan
to use those channels for measuring the noise
 ADC-fit.pngIMG_20171108_162532.jpgIMG_20171108_162556.jpg 
  13418   Wed Nov 8 14:28:35 2017 gautamUpdateGeneralMC1 glitches returnThere hasn't been a big glitch that
misaligns MC1 by so much that the autolocker
can't lock for at least 3 months, seems
 MC1_glitchy.png6AFDA67D-79B1-469C-A58A-9EC5F8F01D32.jpeg 
  13417   Wed Nov 8 12:19:55 2017 gautamUpdateSUScoil driver series resistanceWe've been talking about increasing
the series resistance for the coil driver
path for the test masses. One consequence
 vthresh.pdf 
  13416   Wed Nov 8 09:59:12 2017 gautamUpdateLSCDRMI Nosie Budget v3.1The Oplev trace is missing for now, as
I have not re-measured the A2L coupling since
modifying the Oplev loop shape (specifically
  
  13415   Wed Nov 8 09:37:45 2017 ranaUpdateLSCDRMI Nosie Budget v3.1why no oplev trace in the NB ?




  
  13414   Wed Nov 8 00:28:16 2017 gautamUpdateLSCLaser intensity coupling measurement attemptI tried measuring the coupling of PSL intensity
noise by driving some broadband noise bandpassed
between 80-300Hz using the spare DAC channel
 PSL_RIN.pdf 
  13413   Tue Nov 7 22:56:21 2017 gautamUpdateLSCDRMI locking recoveredI hadn't re-locked the DRMI after the
work on the AS55 demod board. Tonight, I
was able to recover the DRMI locking with
 DRMI_7Nov20178.png 
  13412   Tue Nov 7 17:45:05 2017 gautamUpdateLSCDRMI Nosie Budget v3.1Some days ago, I had tried to measure the
SRCL->MICH and PRCL->MICH cross couplings
using broadband noise injected between 120-180
 SRCL_MICH_whitenoise_tf.pdfPRCL_MICH_whitenoise_tf.pdfMICH_aux.pdfC1NB_disp_40m_MICH_NB_2017-10-08.pdf 
  13411   Mon Nov 6 18:22:48 2017 jamieSummaryLSCcurrent procedure for running c1dnn codeThis is the current procedure to start
the c1dnn model:

  
  13410   Mon Nov 6 11:15:43 2017 gautamUpdateCDSslow machine bootfest + IFO re-alignmentEurocrate key turning reboots today morning
for
  
  13409   Mon Nov 6 09:09:43 2017 SteveUpdateVACsetting up new TP2 turboOur new Agilent Technology TwisTorr
84FS AG rack controller ( English Manual
pages 195-297 )  RS232/485, product
  