40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 72 of 355  Not logged in ELOG logo
IDup Date Author Type Category Subject Text Attachments
  3581   Fri Sep 17 03:06:06 2010 KojiUpdateSUSSOS sent for bakingTwo SOS suspensions for the ETMs were
disassembled and packed for cleaning and
baking by Bob.
 IMG_3596.jpgIMG_3597.jpg 
  3582   Fri Sep 17 03:32:11 2010 KojiUpdateSUSArrangement of the SUS towersThe day before yesterday, I was cleaning
a flow bench in the clean room.
I found that one SOS was standing
  
  3583   Fri Sep 17 12:11:42 2010 josephbUpdateCDSDowns updateIn doing a re-inventory prior to the IOO
chassis installation, I re-discovered we
had a missing interface board that goes in
  
  3584   Fri Sep 17 14:55:01 2010 josephbUpdateCDSTook 5565 RFM card from IOVME to place in the new IOO chassisI took the 5565 RFM card out of the IOVME
machine to so I could put it in the new IO
chassis that will be replacing it. 
  
  3585   Fri Sep 17 17:35:35 2010 steveUpdatePEMcleaned up at 1Y1 PSL rackCleaned up cables on the top and bottom.
Vacuumed both areas. We still have some remaining
shading from the MOPA umbilical and more
  
  3586   Sun Sep 19 18:09:09 2010 ranaConfigurationCamerasBlue IP Camera installed on the PSL table   Untitled.png 
  3587   Sun Sep 19 18:52:52 2010 ranaConfigurationPSLNPRO SLOW servo settings updated for Innolight NPROOur new 2W Mephisto has a pretty zippy
"SLOW" temperature input. Tuning
the perl PID servo, I found that the best
 Untitled.png 
  3588   Mon Sep 20 10:33:21 2010 josephbBureaucracyComputersLarry stopped by - GC machine had conflicting IPLarry stopped by today and had to disconnect
the m25 machine (this is the 1st GC machine
on the left as you walk into the control
  
  3589   Mon Sep 20 11:39:45 2010 josephbUpdateCDSSwitch overI talked to with Alex this morning, discussing
what he needed to do to have a frame builder
running that was compatible with the new
  
  3590   Mon Sep 20 16:59:26 2010 josephbUpdateCDSMegatron in 1X2 rack, to be come c1ioo[Rana, Koji, Joe]
We pulled the phase shifters in the
1X2 rack out to make room for megatron. 
  
  3591   Mon Sep 20 17:10:10 2010 steveConfigurationPSL enclosure beam guides to IFO are installed The PSL out  2" OD beam guide
tube was cut  1.5" shorter to 13.5"
The 10" OD  0.25"
  
  3592   Tue Sep 21 15:33:02 2010 steveMetaphysicsTreasureWagonga alartJohn Miller has arrived from Australia
with 3 bags of  Wagonga Coffee. Trade
bargaining has started on
 P1060866.JPGP1060872.JPG 
  3593   Tue Sep 21 16:05:21 2010 josephbUpdateCDSFirst pass at rack diagramI've made a first pass at a rack diagram
for the 1X1 and 1X2 racks, attached as png.
Gray is old existing boards, power
 1X1_1X2_racks.png 
  3594   Wed Sep 22 16:35:45 2010 josephbUpdateCDSFibers pulled, new FB install tomorrow[Aidan, Tara, Joe]
We pulled out what used to be the
LSC/ASC fiber from the 1Y3 arm rack, and
  
  3595   Wed Sep 22 22:22:12 2010 KojiConfigurationComputersNetgear Network Switch fan broken.Net switch mumbo-jumbo:
Although Rana is going to buy a replacement
for the Netgear Switch for martian, I opened
  
  3596   Thu Sep 23 02:23:04 2010 koji,taraSummaryElectronicsTesting new TTFSS I tested the new table top
frequency stabilization system(TTFSS), 
  
  3597   Thu Sep 23 02:45:30 2010 KojiSummaryComputersnodus gracefully rebootedZach> Nodus seemed to be working fine
again, and I was browsing the elog with no
  
  3598   Thu Sep 23 10:34:20 2010 ranaFrogsComputersnodus gracefully rebootedSVN down
mafalda down 
I am guessing that the NFS file system
  
  3599   Thu Sep 23 11:15:20 2010 KojiFrogsComputersnodus gracefully rebootedsvn is back after starting apache on nodus.
http://lhocds.ligo-wa.caltech.edu:8000/40m/ApacheOnNodus

  
  3600   Thu Sep 23 12:05:20 2010 josephb, alexUpdateCDSfb40m down, new fb in progressAlex came over this morning and we began
work on the frame builder change over. 
This required fb40m be brought down and disconnected
  
  3601   Thu Sep 23 13:16:57 2010 KojiFrogsComputersnodus gracefully rebootedmafalda is up now.
I found that the cable for mafalda
(the sole red cable) had a broken latch.
  
  3602   Thu Sep 23 21:01:11 2010 josephb, alexUpdateCDSfb40m still down, new fb still in progressUnfortunately, copying the data to the USB/SATA
drive over at downs took longer than expected
for Alex.  We will be installing the new
  
  3603   Thu Sep 23 23:24:43 2010 rana, johnny, taraSummaryPSLAM modulate AOM to measure RefCav Thermo-Optic coefficientBig Johnny and I hacked a function
generator output into the cross-connect of
the 80 MHz VCO driver so that we could modulate
  
  3604   Fri Sep 24 00:56:35 2010 koji, taraUpdateElectronicstesting TTFSSWe
found that a transistor was broken from yesterday
spark too. We partially fixed TTFSS, and
  
  3605   Fri Sep 24 16:31:35 2010 steveConfigurationGeneralopen frame- rack is movedThe squeezing open frame rack was moved
from the south side of the PSL enclosure
to the north side of the SP table.
 P1060881.JPG 
  3606   Fri Sep 24 22:58:40 2010 josephbUpdateCDSModified front end medm screensTo startup medm screens for the new suspension
front end, do the following:
1) From a control room machine, log
  
  3607   Fri Sep 24 23:47:10 2010 koji, taraUpdateElectronicstesting TTFSS  Q3, a PZT2222A transistor,
on D0901846 is replaced by a GE-82. However,
the board is still not fully function.
  
  3608   Sat Sep 25 19:01:13 2010 KojiUpdateElectronicstesting TTFSSHow much current do you need for each voltages?
GE-82 was the only PNP transister
I could find in the lab. It's too old but
  
  3609   Sun Sep 26 18:29:23 2010 rana, JohnUpdateCDSModified front end medm screensIssues
 megamind-poster3.jpg 
  3610   Mon Sep 27 00:33:50 2010 ranaUpdatePSLHigh Voltage Driver added to TTFSS -> NPROWe added the Thorlabs HV Driver in
between the FSS and the NPRO today.
The FSS is locking with it, but we
  
  3611   Mon Sep 27 08:59:50 2010 steveConfigurationVACslow vent has startedBlocked PSL output beam  into IFO
Checked: HV at IOO & OMC are
off, jam nuts in position,
  
  3612   Mon Sep 27 17:35:13 2010 josephbUpdateCDSUpdated Suspension screens/Megatron now c1ioo/Further work on fbThe medm screens have been updated further,
with the hidden matrices added in bright
colors.  An example screen shot is attached.
 MC1_Example_Screen.png 
  3613   Mon Sep 27 21:57:59 2010 ZachUpdateelogelog restarted took two runs of the script as usual   
  3614   Tue Sep 28 00:07:45 2010 kiwamuConfigurationVACRe: slow vent has started(Koji, Yuta, Kiwamu)
 P1_history_100927.png 
  3615   Tue Sep 28 10:07:29 2010 josephbUpdateCDSUpdated Suspension screens/Megatron now c1ioo/Further work on fb

    
        
  
  3616   Tue Sep 28 14:12:14 2010 steveUpdateGeneralvertex crane drive is out of orderThe vertex crane drive is overheating,
it stopped functioning. Service man will
be here tomorrow morning.
  
  3617   Tue Sep 28 21:11:52 2010 koji, taraUpdateElectronicsFixing the new TTFSSWe
found a small PCB defect which is an excess
copper shorting circuit on the daughter board,
 before.jpgafter.jpgbefore.jpgafter.jpg 
  3618   Wed Sep 29 01:53:44 2010 ranaUpdatePSLpaths broken and VCO turned offI found that several linux libraries have
been moved around and disabled today. In
particular, I see a bunch of new stuff in
  
  3619   Wed Sep 29 11:18:36 2010 josephbUpdateCDSApps code changesAfter asking Alex specifically what he
did yesterday after I left, he indicated
he copied  a bunch of stuff from Hanford,
  
  3620   Wed Sep 29 12:08:28 2010 josephb, alexSummaryCDSLast burt save of old controlsThis is being recorded for posterity so
we know where to look for the old controls
settings.
  
  3621   Wed Sep 29 15:34:46 2010 kiwamuUpdateGeneralfixing vertex crane
    

       
            
  
  3622   Wed Sep 29 16:56:36 2010 yutaUpdateVAC2 doors opened(Steve, Koji, Joe, Kiwamu, Yuta)
Background:
 The vent was started on Monday,
  
  3623   Wed Sep 29 18:28:32 2010 yutaUpdateComputersaldabella connects to the wireless networkBackground:
 We need laptops that connect
to the wireless network to use them in the
  
  3624   Thu Sep 30 09:34:58 2010 steveUpdateGeneralvertex crane trolly drive fixed


   
        
            
 P1060891.JPGP1060887.JPGP1060889.JPGP1060893.JPG 
  3625   Thu Sep 30 11:07:20 2010 josephb, alexUpdateCDStest points starting to workThe centos 5.5 compiled gds code is currently
living on rosalba in the /opt/app directory
(this is local to Rosalba only).  It
  
  3626   Thu Sep 30 13:43:29 2010 steveUpdateSAFETYpropane gas smell in control roomThe control room's north west corner smelled
like propane gas  yesterday around 16:30
We all agreed that the smell was
  
  3627   Thu Sep 30 14:09:33 2010 yutaUpdateComputersmariabella connects to the wireless networkBackground:
 We need laptops that connect
to the wireless network to use them in the
  
  3628   Thu Sep 30 16:29:35 2010 josephb, alexUpdateCDSfb updateThere currently seems to be a timing issue
with  the frame builder.  We switched
over to using a symmetricom card to get an
  
  3629   Thu Sep 30 17:11:01 2010 alex iUpdateCDSDAQ system updateThe frame builder is timed from the Symmetricom
GPS card now, which is getting the IRIGB
timecode from the freq. distribution amplifier
  
  3630   Thu Sep 30 18:51:50 2010 yutaUpdateComputerssetting up aldabella and mariabella(Kiwamu, Yuta)

Background:
  
ELOG V3.1.3-