  14394   Thu Jan 10 10:23:46 2019 gautamUpdateVACovernight leak rateOvernight, the pressure increased from
247 uTorr to 264 uTorr over a period of 30000
seconds. Assuming an IFO volume of 33,000
 OvernightLeak.png 
  14393   Wed Jan 9 20:01:25 2019 JonUpdateVACSecond pumpdown completed[Jon, Koji, Chub, Gautam]

Summary

The
second pumpdown with the new vacuum system
 Screenshot_from_2019-01-09_20-00-39.pngIMG_3088.jpg 
  14392   Wed Jan 9 11:33:35 2019 gautamUpdateCDSTiming issues still persistSummary:

The gps time mismatch between /proc/gps
and gpstime seems to be resolved. However,
 gpstimeSync.pngScreenshot_from_2019-01-09_17-56-58.png 
  14391   Wed Jan 9 11:07:09 2019 gautamUpdateVACNew Vac channel loggingLooks like I didn't restart all the
daqd processes last night, so the data was
not in fact being recorded to frames. I just
 Screenshot_from_2019-01-09_11-08-28.png 
  14390   Tue Jan 8 19:13:39 2019 JonUpdateUpgradeReady for pumpdown tomorrowEverything is set for a second pumpdown
tomorrow. We'll plan to start pumping
after the 1pm meeting. Since the main volume
  
  14389   Tue Jan 8 10:27:27 2019 gautamUpdateGeneralNear-term in-chamber work Here is a list of tasks I think we should
prioritize for the next two weeks. The idea
is to get back to the previous state of being
  
  14388   Mon Jan 7 19:21:45 2019 JonConfigurationComputer Scripts / ProgramsVac system shutdownADC work finished for the day. The vac
controls are back up, with all valves
CLOSED and all pumps OFF.
  
  14387   Mon Jan 7 11:54:12 2019 JonConfigurationComputer Scripts / ProgramsVac system shutdownI'm making a controlled shutdown of
the vac controls to add new ADC channels.
Will advise when it's back up.
  
  14386   Fri Jan 4 17:43:24 2019 gautamUpdateCDSTiming issues[J Hanks (remote),
koji, gautam]
  
  14385   Fri Jan 4 15:18:15 2019 KojiUpdateGeneralChiara disk clean up and internally mounted[Koji Gautam]

Took the opprtunity of the power
glitch to take care of the disk situation
 P_20190104_143336.jpgP_20190104_143357.jpg 
  14384   Fri Jan 4 11:06:16 2019 JonOmnistructureUpgradeVac System PunchlistThe base Acromag vacuum system is running
and performing nicely. Here is a list of
remaining questions and to-do items we still
  
  14383   Fri Jan 4 10:25:19 2019 JonOmnistructureVACN2 line valved offYes, for TP2 and TP3. They both have
a small vent valve that opens automatically
on shutdown.
  
  14382   Thu Jan 3 21:17:49 2019 ranaConfigurationComputersWorkstation Upgrade: Donatella -> Scientific Linux 7.2donatella was one of our last workstations
running ubuntu12. we installed SL7 on there
today
 IMG_20190103_205158.jpg 
  14380   Thu Jan 3 15:08:37 2019 gautamOmnistructureVACVac status unknownLarry W came by the 40m, and reported that
there was a campus-wide power glitch (he
was here to check if our networking infrastructure
 Screenshot_from_2019-01-03_15-19-51.pngScreenshot_from_2019-01-03_15-14-14.png997B13A9-CAAF-409C-A6C2-00414D30A141.jpeg 
  14379   Fri Dec 21 12:57:10 2018 KojiOmnistructureVACN2 line valved offIndependent question: Are all the turbo
forelines vented automatically? We manually
did it for the main roughing line.
  
  14377   Fri Dec 21 11:13:13 2018 gautamOmnistructureVACN2 line valved offPer the discussion yesterday, I
valved off the N2 line in the drill press
 VacGauges.pngScreenshot_from_2018-12-21_13-02-06.png 
  14376   Fri Dec 21 11:11:51 2018 gautamUpdateCDSLogging of new Vacuum channelsThe N2 pressure channel name was also wrong
in C0EDCU.ini, so I updated it this morning
to the correct name and units:
  
  14375   Thu Dec 20 21:29:41 2018 JonOmnistructureUpgradeVacuum Controls Switchover Completed[Jon, Chub, Koji, Gautam]

Summary

Today we carried
out the first pumpdown with the new vacuum
 40m_vacuum_acromag_channels.pdf 
  14374   Thu Dec 20 17:17:41 2018 gautamUpdateCDSLogging of new Vacuum channelsAdded the following channels to C0EDCU.ini:

  
  14373   Thu Dec 20 10:28:43 2018 gautamUpdateVACHeavy doors back on for pumpdown 82[Chub, Koji, Gautam]

We replaced the EY and IOO chamber
heavy doors by 10:10 am PST. Torquing was
  
  14372   Thu Dec 20 08:38:27 2018 JonUpdateVACPumpdown tomorrow Linked is the pumpdown
procedure, contained in the old 40m documentation.
The relevant procedure is "All Off -->
  
  14371   Wed Dec 19 22:11:28 2018 KojiUpdateGeneralHow to align the copper OMCThe OMC input optics layout is attached

Checked the spot position on OMMT-FM1.
It was off from the center. This was causing
 110804_40m_OMC_layout.pdfOMC_alignment.pdf 
  14370   Wed Dec 19 21:14:50 2018 gautamUpdateVACPumpdown tomorrow I just spoke to Jon who asked me to make
this elog - we will be ready to test one
or more parts of the pumpdown procedure tomorrow
  
  14369   Wed Dec 19 19:51:19 2018 gautamUpdateGeneralPumpdown prep[Koji,
gautam]

Summary:
 OMCscan.pdf 
  14368   Wed Dec 19 15:15:56 2018 gautamUpdateIOOTT1/TT2 steppingI removed the ND filter from the ETMYT
camera to facilitate searching for a TRY
beam. This should be replaced before we go
  
  14367   Wed Dec 19 14:19:15 2018 KojiSummaryVACPlan for pumpoing down testWe
still need elaborated test procedure posted

12/29 Wed
 Screenshot_from_2018-12-19_14-49-34.png 
  14366   Wed Dec 19 00:12:46 2018 gautamUpdateOMC40m OMC DCC nodeI made a node
to collect drawings/schematics for the 40m
OMC, added the length drive for now. We should
  
  14365   Tue Dec 18 18:13:32 2018 aaronUpdateOMCOMC L HV Piezo driver tests (again)I tested the OMC-L HV driver box again,
and made the following observations:


Drove the HV diff pins
 IMG_4576_copy.jpg 
  14364   Tue Dec 18 11:42:40 2018 ChubUpdateGeneralAcromag box wiredThe Auxiliary DAQ Chassis, or Acromag box,
is now wired and ready for testing. 
I will be sorting the cables at the vacuum
  
  14363   Mon Dec 17 20:45:40 2018 aaronUpdateOMCAligning the OMC[gautam, aaron]

We did work in the OMC chamber
today to get the OMC aligned. Aaron was in
 IMG_5922.JPGIMG_5921.JPG 
  14362   Sat Dec 15 20:04:03 2018 gautamUpdateIOOTT1/TT2 steppingI'm running a script that moves TT1
and TT2 randomly in some restricted P/Y space
to try and find an alignment that gets some
  
  14361   Sat Dec 15 18:29:53 2018 KojiUpdateGeneralChiara new USB 4TB DIskThe local backup was done at 18:18
after 11h18m of running.

  
  14360   Fri Dec 14 22:19:22 2018 KojiUpdateGeneralChiara new USB 4TB DIskEdit:
It was not 4TB
  
  14359   Fri Dec 14 14:25:36 2018 KojiUpdateCDSchiara backupfsck of chiara backup disk (UUID="90a5c98a-22fb-4685-9c17-77ed07a5e000")
was done. But this required many files to
be fixed. So the backed-up files are not
 fsck_log.log 
  14358   Fri Dec 14 13:06:12 2018 aaronUpdateOMCAligning the OMCI replaced the 2'' AUX-AS combining
BS with a freshly mounted 2'' HR
mirror for 1064. The mirror is labelled 'Y1-2037-45-P',
  
  14357   Fri Dec 14 13:02:24 2018 aaronUpdateOMCAligning the OMCI replaced the 2'' AUX-AS combining
BS with a 2'' HR mirror for 1064.
I aligned the AUX beam from the new HR mirror
  
  14356   Thu Dec 13 22:56:28 2018 gautamUpdateCDSFrames[koji, gautam]

We looked into the /frames situation
a bit tonight. Here is a summary:
  
  14355   Thu Dec 13 22:36:42 2018 aaronUpdateOMCAligning the OMCI turned on AUX, and aligned the aux beam
to be centered on the first optic the AS
beam sees on the AP table. I then turned
  
  14354   Thu Dec 13 22:24:21 2018 aaronUpdateOMCOMC channelsI completed testing of the AI board mentioned
above. In addition to the blown fuse, there
were two problems:
  
  14353   Thu Dec 13 20:10:08 2018 KojiUpdateGeneralPower Outage recovery[Gautam, Aaron, Koji]

The PSL interlock system
was fixed and now the 40m lab is laser hazard
 OMRON_S82K-00712.JPGreset_button_repaired1.JPGreset_button_repaired2.JPGgray_box.JPGgray_box2.JPG 
  14352   Thu Dec 13 18:12:47 2018 gautamUpdateIOOND filter on AS camera changedIn order to see the AS beam a bit more
clearly in our low-power config, I swapped
out the ND=1.0 filter on the AS camera for
  
  14351   Thu Dec 13 12:06:35 2018 gautamUpdateGeneralPower Outage recoveryI did a walkaround and checked the status
of all the interlock switches I could find
based on the SOP
  
  14350   Thu Dec 13 10:03:07 2018 ChubUpdateGeneralOMC chamberBob, Aaron, and I removed the door from
the OMC chamber this morning.  Everything
went well.
  
  14349   Thu Dec 13 01:26:34 2018 gautamUpdateGeneralPower Outage recovery[koji,
gautam]

After several combinations of soft/hard
  
  14348   Wed Dec 12 18:27:07 2018 JonOmnistructureUpgradeAnalog signals, A/D Acromag added to vacuum systemThere turned out to be a few analog signals
for the vacuum system after all. The TP2/3
foreline pressure gauges were never part
  
  14347   Wed Dec 12 11:53:29 2018 aaronUpdateGeneralPower OutageAt 11:13 am there was a ~2-3 second interruption
of all power at the 40m.

I checked that nobody was in any
 IMG_0033.HEICIMG_1027.HEICIMG_2605.HEIC 
  14346   Tue Dec 11 22:50:07 2018 aaronUpdateOMCAligning the OMCI did the following:


Noticed that the OMC rack's
power has +-18V, but I had tested
 6x 
  14345   Tue Dec 11 18:20:59 2018 gautamUpdateOptical LeversBS/PRM HeNe is deadI found that the BS/PRM OL SUM channels
were reading close to 0. So I went to the
optical table, and found that there was no
 BSOL_dead.png 
  14344   Tue Dec 11 14:33:29 2018 gautamUpdateCDSNDScopeNDscope is now running on pianosa. To be
really useful, we need the templates, so
I've made 
 ndscope.png 
  14343   Tue Dec 11 14:24:18 2018 aaronUpdateOMCAligning the OMCI set up a function generator to drive
OMC-L, and have the two DCPD mons and the
OMC REFL PD sent to an oscilloscope. I need
  
ELOG V3.1.3-