Tue Mar 19 17:00:14 2013, Steve, Update, VAC, large window quote of Cascade
|
Mon Mar 18 12:02:12 2013, Annalisa, Configuration, ABSL, ABSL setup for g-factor measurement of PRC
|
Fri Mar 15 02:14:27 2013, Jenne, Update, CDS, Simulink linking to wrong library part
|
Wed Mar 13 21:04:37 2013, Jenne, Update, Green Locking, PSL green cleaned up
|
Thu Mar 14 04:20:54 2013, Jenne, Update, Green Locking, Ybeat attempt
|
Thu Mar 14 20:22:33 2013, Jenne, Update, Green Locking, Xbeat attempt
|
Thu Mar 14 13:38:29 2013, Jenne, Update, Green Locking, PSL green cleaned up
|
Thu Mar 14 16:56:16 2013, Chloe, Update, , QPD Circuit Design
|
Wed Mar 6 20:21:34 2013, Jamie, Update, General, Beatbox pulled from rack
|
Thu Mar 14 11:51:14 2013, Jamie, Update, General, Beatbox upgraded with output whitening, reinstalled
|
Mon Mar 11 22:28:30 2013, Max Horton, Update, Summary Pages, Fixing Plot Limits
|
Wed Mar 13 15:30:37 2013, Max Horton, Update, Summary Pages, Fixing Plot Limits
|
Wed Mar 13 11:34:24 2013, Steve, Update, optical tables, table covers moved to CES
|
Mon Mar 11 14:10:05 2013, Jenne, Update, Environment, MC suspensions moved by this morning's earthquakes 
|
Mon Mar 11 15:52:46 2013, Jenne, Update, IOO, MC spots centered, WFS realigned
|
Mon Mar 11 17:18:00 2013, Manasa, Update, Environment, Earthquake: Suspensions tripped and MC realigned
|
Tue Mar 12 00:45:50 2013, Jenne, Update, IOO, MC weird again
|
Tue Mar 12 11:49:18 2013, Jenne, Update, IOO, MC weird again
|
Wed Mar 13 02:48:13 2013, Jenne, Update, IOO, MC all better
|
Thu Mar 7 18:12:03 2013, yuta, Update, Alignment, Input beam drift ~ 0.1 mrad/h in pitch
|
Fri Mar 8 20:51:00 2013, Manasa, Update, Alignment, Input beam drift - investigation **IMPORTANT**
|
Mon Mar 11 12:29:25 2013, Manasa, Update, Alignment, Input beam drift - weekend trend
|
Tue Mar 12 14:02:22 2013, Jenne, Update, Alignment, Beam drift - mystery partially solved?
|
Fri Mar 8 16:02:52 2013, Jenne, Update, Alignment, Getting closer to beam centering on Yarm
|
Tue Mar 12 00:58:05 2013, Manasa, Update, Alignment, Yarm - Spot positions centered
|
Mon Mar 11 16:29:29 2013, Steve, Update, PEM, proposed seismometer locations  
|
Mon Mar 11 19:01:21 2013, Jenne, Update, PEM, proposed seismometer locations
|
Sun Mar 10 13:29:29 2013, Koji, HowTo, IOO, How to calculate the accumulated round-trip Gouy phase
|
Sat Mar 9 19:29:27 2013, Koji, Update, PSL, Modulation depth
|
Tue Mar 5 06:27:14 2013, yuta, Update, LSC, intra-cavity power dependence on mirror misalignment   
|
Tue Mar 5 23:00:08 2013, yuta, Update, LSC, Yarm and PRC g-factor from misalignment measurement  
|
Tue Mar 5 23:37:11 2013, yuta, Update, SUS, PRM angular motion spectra
|
Wed Mar 6 02:46:20 2013, Manasa, Update, LSC, PRMI locking for g-factor measurement
|
Wed Mar 6 09:44:29 2013, Koji, Update, LSC, PRMI locking for g-factor measurement
|
Fri Mar 8 21:00:05 2013, Manasa, Update, PSL, PMC fixed
|
Mon Feb 18 18:28:01 2013, yuta, Bureaucracy, Alignment, we are going to pump down
|
Tue Feb 19 02:23:40 2013, yuta, Bureaucracy, General, action items for PRFPMI
|
Mon Feb 25 22:30:40 2013, Jenne, Bureaucracy, General, action items for PRFPMI
|
Fri Mar 8 16:05:56 2013, yuta, Bureaucracy, General, action items for PRMI / ALS-FPMI
|
Fri Mar 8 15:27:42 2013, yuta, Update, Green Locking, PSL green shutter installed
|
Fri Mar 8 12:57:57 2013, Annalisa, Update, ABSL, BS installed on ITMY table
|
Fri Mar 8 13:42:35 2013, Jenne, Update, ABSL, BS installed on ITMY table
|
Wed Mar 6 18:14:33 2013, Manasa, Summary, LSC, Calibration of BS, ITMX and ITMY actuators   
|
Thu Mar 7 01:43:35 2013, yuta, Update, LSC, calibrated MI differential length spectra 
|
Fri Mar 8 02:17:04 2013, yuta, Update, LSC, calibration of PRM actuator  
|
Fri Mar 8 03:07:19 2013, yuta, Update, LSC, calibrated PRM-ITMY length spectra 
|
Thu Mar 7 18:48:43 2013, yuta, Update, Computer Scripts / Programs, releasing my secret scripts
|
Wed Mar 6 21:58:39 2013, Jenne, Update, Electronics, POX whitening was fine all along
|
Wed Mar 6 22:11:19 2013, Koji, Update, Electronics, POX whitening was fine all along
|
Thu Mar 7 18:41:03 2013, Jenne, Update, Electronics, POX whitening was fine all along 
|
Thu Mar 7 11:43:15 2013, Jenne, Update, Electronics, POX and POY whitening DC gain left low
|
Wed Mar 6 18:51:07 2013, Annalisa, Update, Alignment, Auxiliary laser installed for FSR and TMS measurement of the PRC
|
Wed Mar 6 18:27:24 2013, Jamie, Update, General, now recording input TT channels to frames, but why no autoburt?
|
Wed Mar 6 16:14:27 2013, Steve, Update, SAFETY, safety training
|
Thu Feb 28 02:43:49 2013, yuta, Update, LSC, some qualitative evidence of PRMI sideband lock
|
Thu Feb 28 03:25:27 2013, yuta, Update, LSC, PR gain ~ 25 from PRMI carrier lock
|
Thu Feb 28 03:41:31 2013, Koji, Update, LSC, PR gain ~ 25 from PRMI carrier lock
|
Sat Mar 2 05:53:15 2013, yuta, Update, LSC, stable lock of PRMI  
|
Sat Mar 2 14:52:02 2013, rana, Update, LSC, stable lock of PRMI
|
Sun Mar 3 22:16:46 2013, Jenne, Update, LSC, LSC whitening triggering started
|
Mon Mar 4 09:55:33 2013, rana, Update, LSC, LSC whitening triggering started
|
Tue Mar 5 18:36:27 2013, Jenne, Update, LSC, LSC whitening triggering started
|
Tue Mar 5 17:23:06 2013, Chloe, Update, , QPD Adding/Subtracting Circuit
|
Tue Mar 5 14:59:32 2013, Steve, HowTo, VAC, dry-forepump replaced 
|
Tue Mar 5 01:43:04 2013, Jenne, Update, ASS, Arm A2L measurement script finished
|
Mon Mar 4 21:05:49 2013, Max Horton, Update, Summary Pages, Multiprocessing and Crontab
|
Mon Mar 4 20:03:42 2013, Annalisa, HowTo, COMSOL Tips, Study of mirror mount eigenfrequencies   
|
Mon Mar 4 19:52:03 2013, Jamie, Yuta, Update, General, input pointing mirror (TT1/TT2) control improved
|
Mon Mar 4 19:38:21 2013, Charles, Update, General, Intensity Stabilization and Control Systems
|
Mon Mar 4 18:11:10 2013, Jamie, Update, SUS, Cleaning up suspension POS inputs
|
Mon Mar 4 17:32:26 2013, yuta, Bureaucracy, General, flowchart for PRMI g-factor measurement
|
Mon Mar 4 16:26:45 2013, Brett, Update, SUS, Global Damping Noise Measurement
|
Wed Feb 27 22:46:53 2013, Max Horton, Update, Summary Pages, Multiprocessing Implementation
|
Wed Feb 27 23:19:54 2013, rana, Update, Summary Pages, Multiprocessing Implementation
|
Thu Feb 28 14:19:20 2013, Max Horton, Update, Summary Pages, Multiprocessing Implementation
|
Mon Mar 4 10:41:18 2013, Max Horton, Update, Summary Pages, Multiprocessing Implementation
|
Fri Mar 1 02:49:34 2013, Jenne, Update, ASS, Arm A2L measurement
|
Fri Mar 1 08:19:40 2013, Steve, Update, ASS, drift
|
Mon Mar 4 09:51:26 2013, Steve, Update, ASS, IP-ANG is still not real
|
Sat Feb 16 18:32:01 2013, yuta, Summary, RF System, phase tracker: OLTF  
|
Thu Feb 28 05:54:54 2013, yuta, Update, RF System, phase tracker: calibration 
|
Thu Feb 28 06:51:17 2013, yuta, Update, RF System, phase tracker: noise level
|
Sat Mar 2 20:09:12 2013, yuta, Update, RF System, phase tracker: DAQ noise limited
|
Sat Mar 2 00:23:19 2013, rana, Summary, COC, Phase Maps measured of the ATF flat mirrors
|
Fri Mar 1 01:17:06 2013, Jenne, Update, LSC, Xarm oscillation
|
Fri Mar 1 16:58:37 2013, yuta, Update, LSC, Xarm oscillation stopped
|
Sat Mar 2 00:09:31 2013, rana, Update, LSC, Xarm oscillation stopped
|
Mon Feb 4 15:26:10 2013, Jamie, Update, Computer Scripts / Programs, New "getdata" program to pull NDS channel data, including test points
|
Fri Mar 1 18:23:28 2013, Jamie, Update, Computer Scripts / Programs, updated version of "getdata"
|
Fri Mar 1 16:37:45 2013, Brett, Update, SUS, Global Damping Update 
|
Thu Feb 28 14:51:43 2013, Jenne, Update, PEM, "Rock Monster" causing low frequency noise
|
Wed Feb 27 22:28:53 2013, Brett, Update, SUS, Global Damping Update
|
Mon Feb 25 15:30:29 2013, yuta, Update, Alignment, Y arm locked, both colors
|
Mon Feb 25 17:58:28 2013, rana, Update, Alignment, Y arm locked, both colors
|
Mon Feb 25 22:42:32 2013, yuta, Summary, Alignment, current IFO situation
|
Mon Feb 25 21:25:14 2013, yuta, Update, Alignment, both arms locked in IR
|
Tue Feb 26 01:49:27 2013, Jenne, Update, Locking, PRMI locked
|
Tue Feb 26 02:04:51 2013, Koji, Update, Locking, PRMI locked
|
Tue Feb 26 11:55:11 2013, Manasa, Update, Locking, FPMI locked
|
Tue Feb 26 15:32:47 2013, Jenne, Update, Locking, FPMI locked
|
Wed Feb 27 01:09:53 2013, yuta, Update, Locking, PRMI sideband/carrier locked 6x
|
Wed Feb 27 02:44:39 2013, Jenne, Update, Locking, DRFPMI flashes
|
Wed Feb 27 20:10:43 2013, rana, Update, Locking, DRFPMI flashes
|
Wed Feb 27 19:27:29 2013, Annalisa, HowTo, COMSOL Tips, Mirror support Eigenfrequency 
|
Wed Feb 27 17:43:54 2013, Riju, Update, , Photodiode transimpedance 
|
Wed Feb 27 18:01:46 2013, Koji, Update, , Photodiode transimpedance
|
Wed Feb 27 18:17:05 2013, Riju, Update, , Photodiode transimpedance
|
Wed Feb 27 18:38:51 2013, Riju, Update, , Photodiode transimpedance
|
Wed Feb 27 14:59:01 2013, Evan, Update, , Altered MC demodulation phase 
|
Wed Feb 27 14:39:59 2013, Annalisa, Update, LSC, Fibre laid for RFPD audio
|
Wed Feb 27 14:53:02 2013, Steve, Update, LSC, what is the Fibox ?
|
Tue Feb 12 00:14:00 2013, yuta, Update, Locking, PRM coil balancing
|
Sat Feb 16 17:27:26 2013, yuta, Update, SUS, PRM coil balanced
|
Sun Feb 17 19:27:19 2013, rana, Update, SUS, PRM coil balanced
|
Wed Feb 27 11:59:43 2013, yuta, Update, SUS, PRM/BS coil re-balanced 
|
|