Fri Jul 22 15:39:55 2011, haixing, Update, SUS, matching the magnets
|
Fri Jul 22 17:01:41 2011, Iron Man, Frogs, General, Proof that Alberto lived through his Iron Man!
|
Sat Jul 23 02:24:10 2011, Suresh, Update, IOO, restarted the frame builder
|
Mon Jul 25 11:46:28 2011, steve, Update, SUS, ETMY sus problem hunt
|
Mon Jul 25 13:01:24 2011, kiwamu, Update, CDS, c1ioo Make problem
|
Mon Jul 25 13:09:39 2011, Jamie, Update, CDS, c1ioo Make problem
|
Mon Jul 25 17:16:02 2011, Jamie, Update, SUS, Now acquiring SUSXXX_IN1_DQ channels
|
Mon Jul 25 18:51:38 2011, Manuel, Update, PEM, STS-2 seismometer hardware testing with Jan
|
Mon Jul 25 23:43:20 2011, Manuel, HowTo, Electronics, Manual for 1201 Low Noise Preamplifier 
|
Tue Jul 26 03:15:52 2011, Jenne, Update, Locking, Latest MICH noise budget 
|
Wed Jul 20 14:42:34 2011, steve, Update, SUS, oplev gains today
|
Wed Jul 20 19:24:12 2011, rana, Update, SUS, oplev gains today 
|
Wed Jul 20 19:48:03 2011, Jamie, Update, SUS, Re: oplev gains today
|
Thu Jul 21 09:04:59 2011, valera, steve, Update, SUS, oplev gains were not optimized
|
Mon Jul 25 00:35:44 2011, rana, Update, SUS, something wrong with ETMY LR sensor 
|
Tue Jul 26 11:38:45 2011, steve, Update, SUS, ETMY bias checked
|
Thu Jul 21 16:06:35 2011, steve, Update, SUS, oplev gains today checked by conlog
|
Sun Jul 24 20:36:03 2011, haixing, Summary, Electronics, AA filter tolerance analysis 6x
|
Sun Jul 24 20:47:21 2011, rana, Summary, Electronics, AA filter tolerance analysis
|
Sun Jul 24 22:19:19 2011, haixing, Summary, Electronics, AA filter tolerance analysis
|
Tue Jul 26 21:11:40 2011, haixing, Summary, Electronics, AA filter tolerance analysis
|
Wed Jul 27 01:57:28 2011, Sonali, Update, Green Locking, Weekly Summary
|
Wed Jul 27 10:04:29 2011, Suresh, Update, IOO, WFS transfer function measurements
|
Wed Jul 27 01:58:23 2011, kiwamu, Update, LSC, locking status
|
Wed Jul 27 08:59:10 2011, Suresh, Update, LSC, locking status
|
Wed Jul 27 10:10:12 2011, steve, Update, PSL, locking status
|
Wed Jul 27 12:19:19 2011, Nicole, Summary, SUS, Weekly Summary 
|
Wed Jul 27 12:31:47 2011, Manuel, Ishwita, Summary, PEM, Weekly summary
|
Wed Jul 27 15:38:01 2011, steve, Update, VAC, beam traps for vacuum
|
Fri Jun 24 22:35:23 2011, rana, Configuration, CDS, dataviewer broken on pianosa
|
Wed Jul 27 15:49:13 2011, jamie, Configuration, CDS, dataviewer now working on pianosa
|
Wed Jul 27 15:49:56 2011, steve, Update, SAFETY, Manuel receives safety training
|
Thu Jul 28 13:51:00 2011, Sonali, Update, Green Locking, ZHL-32A-S.
|
Thu Jul 28 16:00:28 2011, kiwamu, Update, Computer Scripts / Programs, another offset script : offset2
|
Thu Jul 28 02:33:04 2011, Jenne, Update, Locking, Yarm flashing, but not yet locked
|
Thu Jul 28 16:10:34 2011, kiwamu, Update, LSC, Both arm locked
|
Thu Jul 28 16:26:42 2011, steve, Update, SUS, ITMX, ITMY & ETMY OSEM gains adjusted
|
Thu Jul 28 17:04:04 2011, Nicole, Update, SUS, Photosensor Head Calibration Curve
|
Thu Jul 28 19:49:12 2011, Sonali, Update, PSL, PMC trans beam aligned.
|
Thu Jul 28 21:52:40 2011, rana, Update, Computers, another attempt to use pianosa
|
Fri Jul 29 12:25:54 2011, Ishwita, Manuel, Update, PEM, STS-2 seismometer box
|
Fri Jul 29 12:39:26 2011, jamie, Update, CDS, c1iscex mysteriously crashed
|
Fri Jul 29 16:04:51 2011, steve, Update, SUS, ETMX, PRM & SRM OSEM gains set
|
Fri Jul 29 18:43:02 2011, Manuel, Ishwita, Update, PEM, plugging seismometers to ADC
|
Sat Jul 30 00:33:33 2011, Koji, Update, PSL, ABSL Laser crystal temp left largely excited & left unattended for more than 3hours
|
Sat Jul 30 02:47:43 2011, rana, Update, PSL, ABSL Laser crystal temp left largely excited & left unattended for more than 3hours
|
Sat Jul 30 05:11:45 2011, Suresh, Update, Green Locking, Y- end table clean-up
|
Sat Jul 30 07:07:28 2011, kiwamu, Update, ASC, MCASS status
|
Tue Jul 26 09:01:53 2011, Jenny, Update, Computer Scripts / Programs, Mode matching 
|
Sat Jul 30 10:03:32 2011, Jenny, Update, Computer Scripts / Programs, Mode matching
|
Thu May 12 00:59:45 2011, ryan, rana, Update, PSL, Return of the PSL temperature box
|
Sat Jul 30 19:06:25 2011, ryan, rana, Update, PSL, Return of the PSL temperature box
|
Sat Jul 30 20:41:50 2011, rana, Update, PSL, RefCav Stabilization back on
|
Sat Jul 30 10:01:35 2011, Jenny, Update, PSL, PSL table work    
|
Sun Jul 31 00:37:57 2011, kiwamu, Update, PSL, Re : PSL table work
|
Mon Aug 1 08:52:37 2011, steve, Update, VAC, preparation to vent  
|
Sun Jul 31 17:28:34 2011, kiwamu, Summary, LSC, Tolerance of Arm length = 2 cm  
|
Mon Aug 1 11:46:56 2011, rana, Summary, LSC, Tolerance of Arm length = 2 cm
|
Mon Aug 1 16:06:05 2011, steve, Update, SUS, oplevs are centered
|
Mon Aug 1 17:47:37 2011, steve, Update, ASC, what is not working
|
Mon Jun 20 00:59:02 2011, kiwamu, Summary, General, Weekly report
|
Mon Jun 27 10:04:29 2011, kiwamu, Summary, General, Weekly report
|
Mon Jul 4 14:27:35 2011, kiwamu, Summary, General, Weekly report
|
Mon Jul 25 11:02:19 2011, kiwamu, Summary, General, Weekly report
|
Mon Jul 25 11:04:22 2011, kiwamu, Summary, General, Weekly report
|
Mon Jul 25 11:06:38 2011, kiwamu, Summary, General, Weekly report
|
Mon Aug 1 22:30:59 2011, kiwamu, Summary, General, Weekly report
|
Mon Aug 1 23:29:24 2011, Manuel, Ishwita, Update, WienerFiltering, Getting Data by matlab
|
Wed Jul 27 15:18:50 2011, kiwamu, Summary, General, schedule
|
Wed Jul 27 15:42:41 2011, kiwamu, Summary, General, mitues of 40m meeting : Task list
|
Sun Jul 31 22:48:35 2011, kiwamu, Summary, General, preparation of the vent : status update
|
Mon Aug 1 20:21:05 2011, kiwamu, Update, Green Locking, Y arm green beam axis : aligned
|
Tue Aug 2 02:20:09 2011, kiwamu, Update, Green Locking, Y arm green beam axis : done
|
Tue Aug 2 02:35:23 2011, kiwamu, Update, General, preparation of the vent : status and plan
|
Tue Aug 2 10:53:03 2011, Jenne, Omnistructure, SAFETY, Regular door out of service. Use Control Room Door only!!
|
Tue Aug 2 11:02:52 2011, Jenne, Update, SUS, PRM Watchdog tripped
|
Tue Aug 2 11:52:44 2011, kiwamu, Summary, General, Schedule
|
Tue Aug 2 15:41:06 2011, kiwamu, Update, IOO, Measurement of MC spot positions : done
|
Tue Aug 2 16:43:23 2011, jamie, Update, CDS, NDS2 server on mafalda restarted for access to new channels
|
Mon Aug 1 04:08:24 2011, kiwamu, Update, ABSL, Arm length measurement : cavity kick technique
|
Tue Aug 2 16:55:21 2011, rana, Update, ABSL, Arm length measurement : cavity kick technique
|
|