  3531   Tue Sep 7 10:50:53 2010 josephbConfigurationComputersrossa notesThe controls group is user id 500 by default
on most new machines.  Unfortunately, the
user ID used across the already existing
  
  3532   Tue Sep 7 13:31:49 2010 AlbertoUpdateElectronicsRF System - Frequency Distribution Box - Priority PlanWe need a distribution unit in the LSC
rack to: 1) collect the demod signals coming
from the Frequency Generation Box 2) adjust
 Visio-RFsystem_plan_distributiont.pngRFsystem_plant_distribution_priority.png 
  3533   Tue Sep 7 14:42:02 2010 DmassConfigurationelogelog restartedelog crashed on an upload. restarted and
it worked fine with the same file.
  
  3534   Tue Sep 7 15:31:28 2010 josephb, alexUpdateCDSBinary Output working/ IO chassis fixedAs noted previously,
we were having problems with getting multiple
32 channel binary output cards working. 
  
  3535   Tue Sep 7 15:57:07 2010 AlbertoConfigurationComputersNodus connection not working. Fixed[Joe, Alberto]
The Nodus connection to the Martian
network stopped working after someone switched
  
  3536   Tue Sep 7 20:44:54 2010 YoichiHowToCOMSOL TipsCOMSOL example for calculating mechanical transfer functionsI added COMSOL example files to the 40m
svn to demonstrate how to make transfer function
measurements in COMSOL.
  
  3537   Tue Sep 7 22:21:17 2010 AlbertoConfigurationComputerselog restarted    
  3538   Tue Sep 7 22:21:47 2010 DmassConfigurationelogelog restarted


   
        
            
  
  3539   Tue Sep 7 23:17:45 2010 sanjitConfigurationComputersrossa notes

    

       
            
  
  3540   Tue Sep 7 23:34:15 2010 Kiwamu, SanjitConfigurationComputerse-loge-log was repeatedly hanging and several
attempts to start the daemon failed.
problem was solved after clearing
  
  3541   Tue Sep 7 23:49:08 2010 sanjitConfigurationComputersaldabella network configuration 
added name server 192.169.113.20
as the first entry in /etc/resolv.conf
  
  3542   Wed Sep 8 00:01:07 2010 rana, valeraUpdatePSLPMC updateWe ran the cables for the PMC: The RF cable
for the 35.5 MHz drive was cheap and so we
swapped the 29.5 MHz cable for it.
  
  3543   Wed Sep 8 09:50:13 2010 ranaUpdatePSLPSL updateAlso, Kiwamu has modified the layout drawing
to add the green PLL stuff. This has collapsed
the reference cavity's wave function placing
  
  3544   Wed Sep 8 11:46:53 2010 kiwamuUpdatePSLupdate of the layoutI put some
green stuff on the layout drawing.
 40mPSL.png 
  3545   Wed Sep 8 11:56:24 2010 kiwamuSummaryCDSSeptember CDS test plan Joe and Kiwamu
We discussed about our CDS plan for
this September. The summary of the plan
  
  3546   Wed Sep 8 14:44:37 2010 josephbUpdateCDSUpdated parse_mdl_to_ipc.py and feCodeGen.plI updated parse_mdl_to_ipc.py to correctly
work with the 3 new cdsIPCx parts, namely
cdsIPCx_PCIE (for dolphin connections), cdsIPCx_RFM
  
  3547   Wed Sep 8 16:17:58 2010 steveUpdatePEMparticle counter problemI played with the particle counter this
morning. Now it's running and reading the
correct numbers on the old COCHECKLIST.adl
  
  3548   Thu Sep 9 05:58:04 2010 kiwamuUpdatePSLmode matching from PMC to IMC I started mode matching of the
beam going to IMC. The work is still going
on.
  
  3549   Thu Sep 9 08:23:45 2010 steveUpdateSAFETYmain laser turned offInnolight 2W 1064nm main laser was turned
off for more enclosure related work.
The electrician re rooting the power-
  
  3550   Thu Sep 9 11:17:15 2010 steveUpdateSAFETYmain laser is back ON


   
        
            
 P1060813.JPGP1060814.JPGP1060816.JPG 
  3551   Thu Sep 9 11:31:54 2010 steveUpdatePEMaccelerometer cable connectionI turned off/on the power to the accelerometers
in order to re rout their connections. I
found cable connector body-nut  #3 loose
  
  3552   Thu Sep 9 12:02:03 2010 AlbertoUpdateElectronicsFrequency Generation Box - Amplitude Noise MeasurementsI measured the amplitude noise of the source
outputs and the EOM outputs of the Frequency
Generation box.
 FreqBoxAmplitudeNoiseMeasurementSetup.pngFreqBoxAmplitudeNoise_BusbyBox_AllChannels.png 
  3553   Thu Sep 9 14:42:40 2010 josephbUpdateCDSUpdating suspensions modelI've been working on updating the suspensions
model, incorporating Koji's refinements as
well as trying to simplify the model and
 SingleSUS.png 
  3554   Thu Sep 9 16:54:56 2010 ranaUpdateSAFETYmain laser is back ONI turned off the laser last night to protect
against the electricians. but failed to elog
it. I accept the burnt toast completely.
  
  3555   Thu Sep 9 18:53:56 2010 AlbertoConfigurationElectronicsBusby Box, Rai's Box, SR554 in the RF cabinetI stored the Busby Box, the Rai's Box and
the SR554 preamp in the RF cabinet down the
Y arm.
  
  3556   Fri Sep 10 02:35:30 2010 rana, kiwamu, valera, taraConfigurationPSLupdateOver the last couple nights we got the
beam into the FSS path and all the way to
the IMC and out onto the AP table.
 40mPSL.pdf 
  3557   Sat Sep 11 03:16:51 2010 ranaConfigurationComputersrossa notesI wiped out the old CentOS install on rossa
and installed CentOS 5.5 on there. The DVDs
are on a spindle in the control room; there
  
  3558   Sat Sep 11 22:42:07 2010 valeraUpdatePSLPSL update- The PMC REFL PD was moved from the temporary
location to the one called for by the PSL
layout (picture attached). The leakage beams
 DSC_2502.JPGDSC_2505.JPG 
  3559   Sun Sep 12 22:36:03 2010 ranaConfigurationComputersrossa notesI found Sanjit's instructions for doing
the Nvidia settings too complicated and so
I followed these instructions from Facebook:
  
  3560   Sun Sep 12 23:02:53 2010 valeraUpdate PMC mode matchingKiwamu and I found that the first lens
in the PMC mode matching telescope was mislabeled.
It is supposed to be PLCX-25.4-77.3-C and
 pmc.pdfpmc-abcd.tiff 
  3561   Sun Sep 12 23:16:52 2010 valeraUpdate FSS mode matchingThe attached plot shows the beam scans
of the beam leaking from the back mirror
of the PMC to the BS cube that first turns
 fss.pdffssaom-abcd.tifffssrc-abcd.tiff 
  3562   Mon Sep 13 00:19:32 2010 ranaUpdate VCO Driver Output power v. slider control voltageI measured the RF power output of the VCO
Driver box as a function of slider value.
I measured using the Gigatronics Handheld
 vco.png 
  3563   Mon Sep 13 02:45:59 2010 ranaConfigurationDMFseisBLRMS restartsI restarted the seisBLRMS DMF monitor by
ssh'ing into mafalda and starting up a matlab
session. I also have started a StripTool
  
  3564   Mon Sep 13 10:22:48 2010 josephbUpdateCDSRCG bugs/feature request wiki pageI've started a wiki page under the Upgrade
09/New CDS section regarding known bugs and
pending feature requests for the Real Time
  
  3565   Mon Sep 13 11:40:50 2010 AlbertoUpdateElectronicsFrequency Box Documentation Added to the SVNI uploaded all the material about the RF
frequency Generation Box  into the SVN under
the path:
 freqBoxSVNdierctoryStructure.png 
  3566   Mon Sep 13 11:49:34 2010 kiwamuUpdatePSLmode matching from PMC to IMCI have been working on the mode matching
lenses which are sitting after the boradband
EOM.
 psl_mmt1.pngnewMM.png 
  3567   Mon Sep 13 12:09:42 2010 kiwamuSummaryGeneralelog restarted Elog didn't respond, so I restarted
it with the script.
Before killing the process somehow
  
  3568   Mon Sep 13 19:41:38 2010 ranaUpdatePSLFSS AOM alignmentThe IR sensitive Olympus 570 camera gives
us a really nice view of these IR beams.
Its actually a lot better than what you can
  
  3569   Mon Sep 13 21:52:53 2010 kiwamuUpdateGreen Lockingthe X end laser is ON
 I turned ON the laser
at the X end station, which had
  
  3570   Mon Sep 13 22:51:07 2010 tara,valeraConfigurationPSLbeam scan for RCAVOn Friday, Valera and I calculated the
modematching for reference cavity from AOM.
We scan the beam profile where the
 2010_09_10_w.mat 
  3571   Tue Sep 14 00:21:51 2010 ranaOmnistructureEnvironmentOffice area temperature changeI changed the setpoint for the HVAC control
(next to Steve) from 73F to 72F. This is
to handle the temperature increase in the
  
  3572   Tue Sep 14 18:07:41 2010 AlbertoUpdateElectronicsFrequency Box Documentation Added to the SVNI completed a LIGO document describing
design, construction and characterization
of the RF System for the 40m upgrade.
  
  3573   Wed Sep 15 01:27:52 2010 rana, steve, valeraUpdatePSLFSS cables connected- connected the TTFSS cables (FSS fast
goes directly to NPRO PZT for now)
- measured the reference cavity 21.5
  
  3574   Wed Sep 15 01:58:28 2010 valeraUpdatePSLFSS lockingThe RefCav is locked and aligned. I changed
the fast gain sign by changing the jumper
setting on the TTFSS board. The RefCav visibility
 DSC_2510.JPG 
  3575   Wed Sep 15 03:08:26 2010 KojiUpdatePSLFSS lockingBrilliant! This is the VERY way
how the things are to be conquered!

  
  3576   Wed Sep 15 14:34:57 2010 josephbSummaryCDSPlan for RFM switch overSteps for RFM switch over:
1) Ensure the new frame builder code
is working properly:
  
  3577   Wed Sep 15 16:00:26 2010 koji, steveUpdateMOPA We removed the Lightwave MOPA Controller
from 1X1 (south)  It was a real painfully
messy job to pull out the umbilical.
  
  3578   Wed Sep 15 16:12:35 2010 koji, steveUpdateMOPAMOPA Controller is taken out of the PSL rackWe removed the Lightwave MOPA Controller,
PA#102, NPRO206 power supply to make room
for the IOO chassy at 1X1 (south) rack.
 P1060843.JPG 
  3579   Wed Sep 15 19:29:13 2010 valeraSummary PSL power budget
    
        

            Location
  
  3580   Fri Sep 17 01:36:14 2010 valeraUpdate PMC line widthThe attached plots show the PMC cavity
line width measurement with 1 mW and 160
mW into the PMC. The two curves on each plot
 TEK00009.PNGTEK00010.PNG 