  3481   Fri Aug 27 19:30:31 2010 ranaUpdateCDSSLOW controlsFor the future SLOW controls our current
plan is to keep using the VME based stuff
and associated processors (Baja, Motorola,
  
  3482   Fri Aug 27 22:09:37 2010 JenneUpdatePSLThe beginnings of the new PSL[Rana, Jenne]
Like
 phoenix.jpg 
  3483   Sat Aug 28 01:02:31 2010 ranaUpdatePSLThe beginnings of the new PSLIn fact, many of the mounts need
to be adapted to 4": the beefy
steering mirrors going into the PMC, the
  
  3484   Sat Aug 28 08:17:51 2010 AbertoUpdateElectronicsFSS Frequency Generation Box under testI've taken the FSS frequency generation
box out of the 1Y1 rack. It's sitting on
one of the electronics benches. I'm measuring
  
  3485   Sun Aug 29 21:18:00 2010 ranaUpdateComputerskallo -> rossaWe changed the name of the new control
room computer from kallo to rossa (since
its red).
  
  3486   Mon Aug 30 11:41:34 2010 kiwamuUpdateComputersdisable sendmail and isdn {Rana and Kiwamu}
Yesterday we disabled the sendmail
daemon and the isdn daemon on allegra because
  
  3487   Mon Aug 30 13:57:25 2010 KojiSummaryPSLPSL table vibrational performance after the upgradeJenne and Koji
Last week Jenne has put the accelerometers
on and under the PSL table immediately after
 PEM_100830_SPE.pdfPEM_100830.pdf 
  3488   Mon Aug 30 18:22:00 2010 ranaSummaryPSLPSL Enclosure is UNSTABLEThe lifting and resetting of the
BLUE PSL enclosure has made it unstable somehow.
When I push on it a little it rocks
  
  3489   Mon Aug 30 18:35:22 2010 JenneUpdateWienerFilteringSecret Hiding Place for Raw DataAs it turns out, data seems to fall off
the 16Tb drives after ~20 days.  Which
makes it a good thing that I saved all of
  
  3490   Mon Aug 30 22:45:49 2010 kiwamuUpdateCDSbinary outputs for the new CDS{ Joe and Kiwamu }
Today we made some efforts to
get the binary outputs (BOs) working.
  
  3491   Mon Aug 30 23:21:36 2010 ranaHowToPSL2W NPRO Mount designed with emachineshop.com softwareTo test out this website - emachineshop.com,
Jenne and I are designing some of the mounts
for the new beam height.
 LaserMount.png 
  3492   Tue Aug 31 02:50:45 2010 kiwamuUpdateCDSvertex suspensions controlled by the new CDSI plugged the
new CDS to the vertex suspensions.
  
  3493   Tue Aug 31 10:44:17 2010 steveUpdatePEMconcrete sealedThe PSL -leg concrete was sealed with a
single coat of SCOFIELD Cureseal-S to minimize
shedding of particles.
 P1060787.JPG 
  3494   Tue Aug 31 11:50:14 2010 kiwamuUpdateCDSmaximum number of BIOs { Joe and Kiwamu },
 
  
  3495   Tue Aug 31 13:31:00 2010 steveUpdatePEMroom temp loweredI lowered room 101 thermostat setting from
74F to 72F
  
  3496   Tue Aug 31 14:47:53 2010 steveConfigurationPEMtoilet upgradeOur toilets were replaced by a green Gerber
1.6 gpf ( 6 lpf ) last week.
 toil-n.JPG 
  3497   Tue Aug 31 15:26:46 2010 ranaUpdatePEMroom temp loweredAnd I raised it back to 73F. The thermometers
on the wall show 74-75F as the actual room
temp. The dial on the temperature controller
  
  3498   Tue Aug 31 16:42:26 2010 josephbUpdateCDSTemporarily reverting to CDS revision 2005Apparently updating to the latest revision
of the RCG has some issues with diaggui and
awgtpman.  Alex had to do some recompiling
  
  3499   Tue Aug 31 17:58:38 2010 AlbertoUpdateElectronicsFSS Frequency Generation Box - Phase NoiseA few weeks ago, on Jul 24, Rana and I
measured the phase noise of the FSS frequency
box (aka the 'Kalmus Box'). See elog entry
 2010-08-31_FSSPhaseNoise04modified.png 
  3500   Tue Aug 31 19:46:00 2010 ranaUpdatePSLPSL upgrade update
    Steve is handling the mount
height increase for the PMC and RC steering
mirrors, as well as a mount (non-steerable)
  
  3501   Wed Sep 1 07:52:27 2010 AlbertoConfigurationElectronicsPMC board unplugged, turned on Sorensen switches on 1Y1 rackToday I put the FSS frequency box back
into the 1Y1 rack.
To power it on, I turned on the 24V
  
  3502   Wed Sep 1 08:28:43 2010 KojiUpdatePSLPSL upgrade update


   
        
            
  
  3503   Wed Sep 1 08:36:59 2010 KojiHowToPSL2W NPRO Mount designed with emachineshop.com software1. I can not see whether the attaching
surface is flat or not.
It should have ~1mm step to avoid
  
  3504   Wed Sep 1 08:40:28 2010 AlbertoConfigurationElectronicsPMC board unplugged, turned on Sorensen switches on 1Y1 rack


   
        
            
  
  3505   Wed Sep 1 10:54:15 2010 steveUpdatePEM more crane balancing Crane balancing at the south end is continuing
today.
  
  3506   Wed Sep 1 11:34:39 2010 AlbertoUpdateElectronicsFSS Box Phase Noise from DAQI measured the phase noise of the LO output
of the FSS box from the DAQ. I'm attaching
the results.
 2010-09-01_FSSPhaseNoise.png2010-09-01_FSSphaseNoiseMeasurementSetup.png 
  3507   Wed Sep 1 12:24:47 2010 josephbUpdateCDSTrying to get up to date CDS code runnningAlex, Joe:
We copied the latest x02 to c1x02
and modified to our the config block in it.
  
  3508   Wed Sep 1 12:34:14 2010 ranaUpdateElectronicsFSS Box Phase Noise from DAQThe differences between this setup and
the one used previously is the lack of the
50 Ohm terminator in the mixer output and
  
  3509   Wed Sep 1 16:29:28 2010 AlbertoUpdateElectronicsFSS Box Phase Noise from DAQ - Measurement setup modified


   
        
            
 2010-09-01_FSSPhaseNoise_DAQ_00-02_comparison.png2010-09-01_FSSPhaseNoise_DAQ_02.pngFSSphaseNoiseMeasurementSetup02.png 
  3510   Wed Sep 1 17:17:42 2010 ranaUpdateElectronicsFSS Box Phase Noise from DAQ - Measurement setup modifiedWith the setup now working, we should now
test the power filtering for the crystal
and amplifier.
  
  3511   Thu Sep 2 01:44:13 2010 JenneUpdatePSLPSL beam hitting the PMC![Rana, Jenne]
More PSL progress. 
The new laser was raised to a 4 inch
  
  3512   Thu Sep 2 01:48:23 2010 JenneFrogsTreasureNot cool....This totally creeped me out when I found
it wandering around on the floor not so far
from my desk:
 CreepyBug.jpg 
  3513   Thu Sep 2 14:11:17 2010 steveSummaryPEMsouth end crane balancing is completedThe crane I -beam now leveled at all degrees
of rotation.  The lower hinge was moved
southward  about 1/4 of an inch. 
 P1060798.JPGP1060800.JPGP1060804.JPG 
  3514   Thu Sep 2 16:41:32 2010 steveConfigurationSAFETYlaser is ON: safety glasses required!I hooked up interlock to the Innolight
2W 1064 nm in the enclosure. The manual shutter 
is closed on this unit.
  
  3515   Thu Sep 2 16:45:48 2010 josephbUpdateCDSNumbering scheme of the PCI busRolf has recently written a document describing
how one should fill out an IO chassis and
how the numbering works out.  This can
  
  3516   Thu Sep 2 17:43:30 2010 josephbUpdateCDSOne working BO output module, others not so much Joe and Kiwamu:
We found one bug in the RCG code,
where the second input for the CDO32 part
  
  3517   Thu Sep 2 21:22:31 2010 Sanjit, KojiConfigurationComputersrossa nvidia driver and dual monitor configuration 
Simple steps (but don't try these
on a working computer without getting some
  
  3518   Thu Sep 2 23:35:33 2010 ranaConfigurationComputersrossa nvidia driver and dual monitor configurationWhy are we running CentOS 4.8 instead of
5.5 ?    What runs at LLO?    
What runs in Downs?
  
  3519   Fri Sep 3 06:55:42 2010 ranaUpdatePSLPSL beam hitting the PMC!NPRO
Koji and I inspected and photographed
the laser after opening up its case. I then
  
  3520   Fri Sep 3 11:03:41 2010 AlbertoFrogsElectronicsCable cutting toolsI found this very interesting German maker
of cool cable cutting tools. It's called
Jokari.
  
  3521   Fri Sep 3 11:23:16 2010 josephbConfigurationComputersrossa nvidia driver and dual monitor configurationAt LLO the machines are running Centos 5.5.
 A quick login confirms this.  Specifically
the release is 2.6.18-194.3.1.el5.



  
  3522   Fri Sep 3 13:04:30 2010 KojiFrogsElectronicsCable cutting toolsYeah, this looks nice.
And I also like to have something
I have attached. This is "HOZAN P-90",
 P90.jpg 
  3523   Fri Sep 3 23:42:34 2010 JenneUpdatePSLPSL update of the dayRana and I were poking around on the PSL
table today, getting a few more items raised
to the correct height.
  
  3524   Sun Sep 5 21:35:41 2010 ranaConfigurationComputersrossa notes**** Deleted
apps/emacs
apps/linux64/firefoxold
  
  3525   Mon Sep 6 01:46:58 2010 ranaUpdatePSLPSL update of the dayTo bypass the polarizer issue, I just used
cubes. One I took from the FSS-Refcav path
and the other from the power control part
  
  3526   Mon Sep 6 10:08:10 2010 AlbertoConfigurationComputersNetgear Network Switch fan broken.The Netgear Network Switch in the top shelf
of Nodus' rack has a broken fan. It is the
one interfaced to the Martian network.
  
  3527   Mon Sep 6 20:38:58 2010 KojiUpdateCDSSusension model reviewedI have reviewed the suspension model of
C1SUS and refined it.
It is comaptible to the current one
 suspension_model.pdf 
  3528   Mon Sep 6 21:08:44 2010 ranaUpdateCDSSusension model reviewedWe must remember
that we are using the Rev.B
SOS Coil Drivers and not the Rev. A. 
  
  3529   Mon Sep 6 22:09:11 2010 AlbertoUpdateElectronicsRF Frequency Generation Box heat sink installed and testedLast week I noticed that the high power
amplifiers in the Frequency Generation Box
became hot after 2 hours of continuous operation
 DSC_2467.JPG2010-09-06_FreqBoxAmplifierTemperatureTrend.pngDSC_2433.JPG 
  3530   Tue Sep 7 08:56:00 2010 AlbertoUpdateElectronicsFrequency Generation Box Assembly - Phase Noise MeasurementsHere are the results of my phase noise
measurements on the 7 outputs of the Frequency
Generation Box. (BIN=95L applied by DTT).
 2010-09-03_FreqBoxPhaseNoise_AllOutputsComparison_smooth.png2010-09-03_FreqBoxPhaseNoise_AllOutputsComparison_smooth.pdf 