40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 6 of 166  Not logged in ELOG logo
Entry  Fri Dec 18 22:59:12 2020, Jon, Configuration, CDS, Updated CDS upgrade plan CDS_2020_Dec.pdfCDS_2020_Dec.graffle
    Reply  Mon Dec 21 09:28:50 2020, Jamie, Configuration, CDS, Updated CDS upgrade plan 
    Reply  Wed Dec 23 23:06:45 2020, gautam, Configuration, CDS, Updated CDS upgrade plan 
       Reply  Tue Jan 19 14:05:25 2021, Jon, Configuration, CDS, Updated CDS upgrade plan 40m_CDS_Network_-_Planned.pdf40m_CDS_Network_-_Current.pdf
          Reply  Tue Jan 19 15:43:24 2021, gautam, Configuration, CDS, Updated CDS upgrade plan 
Entry  Thu Jan 14 11:46:20 2021, gautam, Update, CDS, Expansion chassis from LHO 
    Reply  Thu Jan 14 12:19:43 2021, Jon, Update, CDS, Expansion chassis from LHO 
    Reply  Fri Jan 15 15:06:42 2021, Jon, Update, CDS, Expansion chassis from LHO 
       Reply  Fri Jan 15 16:54:57 2021, gautam, Update, CDS, Expansion chassis from LHO Screenshot_2021-01-15_17-00-06.png
          Reply  Tue Jan 19 13:19:24 2021, Jon, Update, CDS, Expansion chassis from LHO 
Entry  Wed Nov 18 22:49:06 2020, gautam, Update, ASC, Some thoughts about AS WFS electronics 
    Reply  Sun Nov 22 21:09:37 2020, gautam, Update, ASC, Planned mods for WFS head aLIGO_wfs_v5_40m.pdfTFs.pdfnoise.pdf
       Reply  Wed Nov 25 18:18:41 2020, gautam, Update, ASC, Planned mods for WFS head anodeVsOutput.pngsensitivity.png
          Reply  Sat Nov 28 21:44:53 2020, rana, Update, ASC, Planned mods for WFS head 
          Reply  Thu Dec 10 22:46:57 2020, gautam, Update, ASC, WFS head assembled aLIGO_wfs_v5_40m.pdfTF_meas.pdf
             Reply  Thu Dec 17 15:23:56 2020, gautam, Update, ASC, WFS head characterization oNoise.pdfZ_Hi.pdfZ_Low.pdfIMG_9030.jpgiNoise.pdf
    Reply  Wed Nov 25 18:30:23 2020, gautam, Update, ASC, Some thoughts about AS WFS electronics 
       Reply  Wed Dec 2 23:07:19 2020, gautam, Update, ASC, Electrical LO signal for AS WFS RF_Frequency_Source.pdf
          Reply  Thu Dec 3 11:02:35 2020, rana, Update, Electronics, Electrical LO signal for AS WFS 
          Reply  Thu Dec 3 13:55:52 2020, Koji, Update, ASC, Electrical LO signal for AS WFS 
             Reply  Thu Dec 3 20:38:46 2020, gautam, Update, ASC, Electrical LO signal for AS WFS RF_Frequency_Source.pdfdemodPath.pdfEOMpath.pdf
                Reply  Thu Dec 3 21:14:38 2020, Koji, Update, ASC, Electrical LO signal for AS WFS 
                   Reply  Thu Dec 3 21:44:49 2020, gautam, Update, ASC, Electrical LO signal for AS WFS 
                      Reply  Fri Dec 4 03:02:40 2020, Koji, Update, ASC, Electrical LO signal for AS WFS 
                         Reply  Fri Dec 4 22:41:56 2020, gautam, Update, ASC, Freq Gen Box revamp 
                            Reply  Sat Dec 5 20:44:35 2020, gautam, Update, ASC, Freq Gen Box re-installed 6x
                               Reply  Mon Dec 7 12:38:51 2020, gautam, Update, IOO, IMC loop char OLTFcomparison.pdfdemodMons.pdfOLTFcomparison.pdf
                               Reply  Mon Dec 7 22:54:30 2020, gautam, Update, LSC, Modulation depth measurement modDepth.pdf
                                  Reply  Sat Jan 16 18:59:44 2021, gautam, Update, LSC, Modulation depth measurement PLL.pdfmodDepth.pdfmodProfile.pdfEOMpath_postMod.pdf
Entry  Fri Jan 15 17:04:45 2021, gautam, Update, LSC, Messed up LSC sensing PRFPMI_Jan12sensMat.pdfPRMI3f_ALS_Jan11_largeOffsetsensMat.pdf
Entry  Thu Jan 14 12:32:28 2021, gautam, Update, CDS, Rogue master may be doing something good? Screenshot_2021-01-14_12-35-52.png
Entry  Thu Aug 6 00:34:38 2020, Yehonathan, Update, BHD, Monte Carlo Simulations 8x
    Reply  Fri Aug 7 11:23:47 2020, rana, Update, BHD, Monte Carlo Simulations 
       Reply  Mon Aug 10 07:13:00 2020, Yehonathan, Update, BHD, Monte Carlo Simulations 8x
          Reply  Tue Aug 25 05:51:29 2020, Yehonathan, Update, BHD, Monte Carlo Simulations 8x
             Reply  Mon Sep 14 07:50:01 2020, Yehonathan, Update, BHD, Monte Carlo Simulations 10x
                Reply  Fri Oct 16 09:16:37 2020, Yehonathan, Update, BHD, Monte Carlo Simulations 8x
                   Reply  Thu Oct 22 11:48:08 2020, Yehonathan, Update, BHD, Monte Carlo Simulations 8x
                      Reply  Thu Dec 10 14:48:00 2020, Yehonathan, Update, BHD, Monte Carlo Simulations MCMCLance_NoiseBudget_Example.pdfIFO_Check.pdf
                         Reply  Fri Dec 11 09:28:52 2020, rana, Update, BHD, Monte Carlo loop coupling Simulations 
                            Reply  Mon Dec 14 11:09:28 2020, Yehonathan, Update, BHD, Monte Carlo loop coupling Simulations MCMC_LANCE_OLTFs.pdfMCMC_LANCE_OLCoupling2DARM.pdf
                               Reply  Mon Jan 11 16:11:51 2021, Yehonathan, Update, BHD, Monte Carlo loop coupling Simulations MC_LANCE_OLTFs.pdf
                                  Reply  Mon Jan 11 19:10:10 2021, rana, Update, BHD, Monte Carlo loop coupling Simulations 
Entry  Wed Jan 6 22:47:41 2021, gautam, Update, ALS, Noisy ALS ALSX_excess.pngbudget.pdf
    Reply  Thu Jan 7 19:16:11 2021, gautam, Update, ALS, Noisy ALS ALS_ERR_MON.pdfAUXnoise.pdf
       Reply  Thu Jan 7 20:07:27 2021, Koji, Update, ALS, Noisy ALS 
          Reply  Thu Jan 7 21:16:22 2021, gautam, Update, ALS, Noisy ALS 
             Reply  Thu Jan 7 23:25:19 2021, Koji, Update, ALS, Noisy ALS 
          Reply  Fri Jan 8 20:01:11 2021, gautam, Update, ALS, Noisy ALS ALSX_IR_green.pdf
Entry  Wed Jan 6 19:00:04 2021, gautam, Update, LSC, Phase loss in POX/POY loops POXloop.pdfloopFit.pdf
Entry  Wed Jan 6 16:18:38 2021, gautam, Update, Optical Levers, BS Oplev glitchy missingData.pngOLRIN.pdfBS_OL_P.pdfBS_OL_suppression.pdf
Entry  Wed Jan 6 15:28:04 2021, gautam, Update, VAC, Vac rack UPS batteries replaced 
Entry  Wed Dec 23 10:13:08 2020, gautam, Update, CDS, Near term upgrades IMG_0020.pdf
Entry  Mon Dec 21 18:18:03 2020, gautam, Update, CDS, Many model changes CDSoverview.png
    Reply  Tue Dec 22 22:11:37 2020, gautam, Update, CDS, AA filt repaired and reinstalled 
Entry  Sat Dec 19 20:24:25 2020, gautam, Update, Electronics, WFS hardware install 
Entry  Thu Dec 10 17:12:43 2020, Jon, Update, , New SMA cables on order 
    Reply  Sat Dec 19 00:25:20 2020, Jon, Update, , New SMA cables on order 
       Reply  Sat Dec 19 02:42:56 2020, Koji, Update, , New SMA cables on order 
Entry  Fri Dec 18 10:52:17 2020, gautam, Update, CDS, RFM errors  RFMdiag.png
Entry  Tue Dec 15 12:38:41 2020, gautam, Update, Electronics, DC power strip 
Entry  Thu Dec 10 22:45:42 2020, gautam, Update, SUS, More spare OSEMs 
Entry  Thu Dec 10 16:24:13 2020, gautam, Update, Equipment loan, Noliac PZT --> Paco 
Entry  Wed Dec 9 20:14:49 2020, gautam, Update, VAC, UPS failure rackBeforenAfter.pdfIMG_0008.jpgIMG_0009.jpgvacStatus.png
    Reply  Thu Dec 10 13:05:52 2020, Jon, Update, VAC, UPS failure TP2_time_history.pngslow_controls_monitors.png
       Reply  Thu Dec 10 14:29:26 2020, gautam, Update, VAC, UPS failure vacDiag1.png
Entry  Thu Dec 10 11:07:24 2020, Chub, Update, VAC, UPS fault 
    Reply  Thu Dec 10 11:17:50 2020, Chub, Update, VAC, UPS fault 
Entry  Wed Dec 9 15:37:48 2020, gautam, Update, CDS, RFM switch IP addr reset Screenshot_2020-12-09_15-39-20.pngScreenshot_2020-12-09_15-46-46.png
Entry  Wed Dec 9 12:02:04 2020, gautam, Update, LSC, POX locking still unsatisfactory armRIN.pdfPOX_OLTF.pdf
Entry  Wed Dec 9 11:54:11 2020, gautam, Update, Optical Levers, ITMX HeNe replaced OLtrend_old_ndscope.pngITMX_OL_P.pdfITMX_OL_Y.pdf
Entry  Tue Dec 8 15:07:13 2020, gautam, Update, Computer Scripts / Programs, ndscope updated test.pdf
Entry  Mon Dec 7 14:32:02 2020, gautam, Update, LSC, New demod phases for POX/POY locking POX_POY_OLTF.pdfPOX_POY_spectra.pdf
Entry  Fri Dec 4 19:23:40 2020, Koji, Update, Electronics, AA/AI board testing ongoing 
Entry  Tue Nov 10 12:41:23 2020, gautam, Update, IOO, 1W > IMC CD93A725-FB5C-4F67-BB2E-D122205114B0.jpeg
    Reply  Tue Nov 10 14:30:06 2020, gautam, Update, IOO, WFS2 broken  WFS2broken.pngWFS2broken_RF.png
       Reply  Fri Dec 4 15:58:22 2020, Koji, Update, IOO, WFS2 broken  
Entry  Wed Sep 16 12:03:07 2020, Jon, Update, VAC, Replacing pressure gauges vac_gauges.png
    Reply  Wed Dec 2 12:27:49 2020, Jon, Update, VAC, Replacing pressure gauges 
       Reply  Thu Dec 3 14:53:58 2020, Jon, Update, VAC, Replacing pressure gauges 
Entry  Thu Dec 3 10:46:39 2020, gautam, Update, Electronics, DC power strip requirements 
Entry  Thu Dec 3 10:33:00 2020, gautam, Update, VAC, TrippLite UPS delivered DFDD4F39-3F8A-439D-888D-7C0CE2E030CF.jpeg
Entry  Wed Dec 2 18:35:31 2020, gautam, Update, DetChar, Summary page revival 
Entry  Wed Dec 2 17:54:03 2020, gautam, Update, CDS, FE reboot 
Entry  Wed Dec 2 12:35:31 2020, Paco, Summary, Computer Scripts / Programs, TC200 python driver  
    Reply  Wed Dec 2 15:27:06 2020, gautam, Summary, Computer Scripts / Programs, TC200 python driver  
Entry  Tue Nov 24 16:51:29 2020, gautam, Update, PonderSqueeze, Ponderomotive squeezing in aLIGO QN_heatmap_RSE.pdfQN_heatmap_SR.pdfnoiseBudget.pdf
Entry  Mon Nov 23 23:27:43 2020, Koji, Summary, ASC, Q3000 characterization 
Entry  Wed Nov 18 17:51:50 2020, gautam, Update, VAC, Agilent pressure gauge controller delivered 
    Reply  Mon Nov 23 16:33:10 2020, gautam, Update, VAC, More vacuum deliveries  
Entry  Mon Nov 23 12:25:14 2020, gautam, Update, BHD, BHD MMT Optics delivered IMG_8965.HEIC
    Reply  Mon Nov 23 14:52:10 2020, Koji, Update, BHD, BHD MMT Optics delivered 
Entry  Tue Nov 17 13:24:40 2020, Chub, Update, General, big UPS on the way 
Entry  Thu Nov 12 14:31:27 2020, gautam, Update, Electronics, SR560s in need of repair/battery replacement IMG_8947.jpg
    Reply  Tue Nov 17 00:26:32 2020, rana, Update, Electronics, SR560s in need of repair/battery replacement 
Entry  Mon Nov 16 16:00:19 2020, gautam, Update, Equipment loan, LB1005-->Cryo lab 
Entry  Wed Nov 4 00:10:43 2020, gautam, Update, General, Vent activities today IMG_0184.jpgIMG_0185.jpgIMG_0187.jpgIMG_0207.jpegIMG_0210.jpg
    Reply  Thu Nov 5 22:27:34 2020, gautam, Update, General, Vent activities today 
       Reply  Fri Nov 6 11:36:37 2020, gautam, Update, General, ETMY suspension eigenmodes ETMY_pkFitNaive.pdfETMY.tar.bz2
          Reply  Tue Nov 10 15:13:41 2020, rana, Update, General, ETMY suspension eigenmodes 
             Reply  Thu Nov 12 14:26:35 2020, gautam, Update, General, ETMY suspension eigenmodes ETMY.tar.bz2
       Reply  Sun Nov 8 20:22:35 2020, gautam, Update, General, Vent activities today IFOalignment.png
          Reply  Sun Nov 8 23:24:29 2020, Koji, Update, General, Vent activities today 
          Reply  Mon Nov 9 17:40:17 2020, gautam, Update, General, Pumpdown IMG_8937.jpgpumpdown.png
             Reply  Tue Nov 10 11:31:13 2020, Koji, Update, General, Pumpdown Screen_Shot_2020-11-10_at_11.30.21.png
Entry  Tue Nov 10 17:46:06 2020, gautam, Update, General, IFO recovery RFMerrs.pngIFOrecovery.pngALS_ool.pdfPRMIcarr.png
Entry  Tue Nov 10 11:59:37 2020, gautam, Update, VAC, Stuck RV2 damagedThread.001.jpegIFOstatus.pngP1a_leakTest.png
Entry  Fri Nov 6 14:08:44 2020, gautam, Update, PSL, PMC re-locked 
Entry  Tue Nov 3 09:06:50 2020, gautam, Update, General, Lab alarm tripped 
Entry  Wed Oct 28 20:42:53 2020, Koji, Update, General, Vent Prep 10x
    Reply  Thu Oct 29 12:43:35 2020, gautam, Update, General, Vent Prep preVentAlignment.pngPRMIcarr_PRMalignment.pngALS_ool.pdflowPowerMC.png
       Reply  Thu Oct 29 19:30:56 2020, gautam, Update, General, Vent complete ventValveStatus.pngvent_Oct2020.jpgventValveStatus_overnight.pnglowPowerIMC_afterVent.png
          Reply  Mon Nov 2 12:44:25 2020, gautam, Update, General, ETMY and OMC chamber heavy doors off CB84FD62-C48B-414F-8825-50C9DE0B47CF.jpeg
             Reply  Mon Nov 2 16:46:06 2020, gautam, Update, General, Plan for OMC chamber IMG_2318.JPGIMG_2332.JPG
                Reply  Mon Nov 2 17:13:19 2020, Koji, Update, General, Plan for OMC chamber 
                   Reply  Mon Nov 2 17:32:05 2020, gautam, Update, General, Plan for OMC chamber IMG_2317.JPG
Entry  Thu Oct 29 09:50:12 2020, anchal, Summary, Calibration, Preliminary calibration measurement taken PreliminaryCalibrationData.pdf
Entry  Tue Oct 27 23:47:53 2020, gautam, Update, General, ISS checkout 
    Reply  Wed Oct 28 14:01:03 2020, not gautam, Update, General, ISS checkout 
       Reply  Wed Oct 28 14:07:47 2020, gautam, Update, General, ISS checkout 
Entry  Sat Oct 3 16:51:27 2020, gautam, Update, CDS, RFM errors RFMstat.pngRFMerrs.png
    Reply  Wed Oct 28 09:35:00 2020, Koji, Update, CDS, RFM errors Screen_Shot_2020-10-28_at_10.06.00.png
Entry  Fri Oct 23 16:41:06 2020, Koji, Update, IOO, Excess laser freq noise investigation plot.pdf
    Reply  Mon Oct 26 13:35:58 2020, Koji, Update, IOO, Excess laser freq noise investigation 6x
       Reply  Mon Oct 26 17:26:26 2020, gautam, Update, IOO, Excess laser freq noise investigation 
ELOG V3.1.3-