Entry  Thu Jun 9 10:38:30 2011, steve, Update, PSL, PMC needs help pmcnothp.jpg
The PMC is losing power.
    Reply  Thu Jun 9 12:21:07 2011, kiwamu, Update, PSL, Re : PMC needs help Untitled.png
Nulling the slow actuation offset fixed the issue. Now PMC is back to normal.

Entry  Thu Jun 9 18:25:22 2011, kiwamu, HowTo, CDS, look back a channel which doesn' exist any more 
For some purposes I looked back the data of some channels which don't exist any more.  Here I explain how to do it.
If this method is not listed on the wiki, I will put this instruction on a wiki page.
Entry  Thu Jun 9 20:10:38 2011, kiwamu, Update, SUS, ETMY whitening filter : all off ETMY_WF2.png
I checked the state of the whitening filters for the ETMY shadow sensors.
Result : They've been
OFF  (i.e. flat response).
Entry  Thu Jun 9 16:18:03 2011, josephb, Update, CDS, Second trends only go back 12 days 
While answering a quick question by Kiwamu, I noticed we only had second trends going back to 99050000 GPS time, May
27th 2011.  
Trends (I thought) were intended to be kept forever, and certainly longer than full data, which currently goes
    Reply  Fri Jun 10 12:02:10 2011, rana, Update, CDS, Second trends only go back 12 days 


    
        
            Quote:
        
        
            
            While answering a quick question by Kiwamu, I noticed we only had second trends going
Entry  Fri Jun 10 12:04:57 2011, Jenne, Update, RF System, Bad RF connections!! 
I am in the process of calibrating AS55's shot noise, and I noticed that the AS55 PD input to the demod board was only finger-tight.  I then checked
all of the other SMA connections in the set of RF PD demod boards, and found several more that were loose, including all of the REFL55 connections. 
This is no good!!!! RF connections need to be tightened! 
Entry  Fri Jun 10 14:50:37 2011, Koji, Update, LSC, New LSC code installed 
[Koji Jamie]
The new c1lsc code has been installed. The LSC screens have also been updated (except for ASS screen).
The major changes are:
Entry  Fri Jun 10 18:49:40 2011, kiwamu, Update, IOO, Intensity Noise after the MC RIN_afterMC.png
Last night the relative intensity noise (RIN) of the beam after MC was measured.

It looks like the RIN is dominated by the motion of the MC mirrors, possibly the angular motions because
Entry  Mon Jun 13 12:34:21 2011, Jamie, Koji, Update, LSC, Updated LSC model installed 
After a couple of hickups, I was able to compile and install Koji's rework of the LSC model.
The main changes are that the model now use an RF_PD library part, and the channel names were tweaked to be more in line with what we expect.
I found a couple of small bugs in the model that were preventing it from compiling.  Those were fixed and it compiled with no further problems.
Entry  Mon Jun 13 15:33:55 2011, Jamie, Joe, Update, CDS, Dolphin fiber between 1Y3 and 1X4 appears to be dead 
The fiber that connects the Dolphin card in the c1lsc machine (in the 1Y3 rack) to the Dolphin switch in the 1X4 rack appears to have died spontaneously
this morning.  This was indicated by loss of Dolphin communication between c1lsc and c1sus.
We definitively tracked it down to the fiber by moving the c1lsc machine over to 1X4 and testing the connection with a short cable.  This
Entry  Fri Jun 10 20:23:56 2011, Larisa Thorne, Update, Electronics, Seismometer Box Update/graphs SeisNoiseGraphs.jpg
 (continuation of this)
 
The noise graphs relating total noise of the Seismometer circuit (GURALP stuff) to the LIGO seismic noise curve have been completed
    Reply  Mon Jun 13 16:27:10 2011, Jenne, Update, Electronics, Seismometer Box Update/graphs NewSeisBoxNoise.png


    
        
            Quote from elog 4807:
        

       
            
            The noise graphs relating total noise of
Entry  Mon Jun 13 18:40:08 2011, Jamie, Joe, Update, CDS, Snags in the repair of LSC CDS 
We've run into a problem with our attempts to get the LCS control back up and running.
As reported previously, the Dolphin fiber connection between c1lsc and c1sus appears to be dead.  Since we have no replacement fiber, the
solution was to move the c1lsc machine in to the 1X4 rack, which would allow us to use one of the many available short Dolphin cables, and then use a long
Entry  Mon Jun 13 19:26:42 2011, Jamie, Joe, Configuration, CDS, SUS binary IO chassis 2 and 3 moved from 1X5 to 1X4 
While preping 1X4 for installation of c1lsc, we removed some old VME crates that were no longer in use.  This freed up lots of space in 1X4. 
We then moved the SUS binary IO chassis 2 and 3, which plug into the 1X4 cross-connect, from 1X5 into the newly freed space in 1X4.  This makes the
cable run from these modules to the cross connect much cleaner.
    Reply  Tue Jun 14 09:24:36 2011, steve, Configuration, Photos, SUS binary IO chassis 2 and 3 moved from 1X5 to 1X4 P1070891.JPGP1070893.JPG


    
        
            Quote:
        
        
            

           While preping 1X4 for installation of c1lsc, we removed some old VME crates that were no longer in use.  This freed up lots of space
Entry  Tue Jun 14 09:25:17 2011, Jamie, Update, CDS, Dolphin fiber tested with c1sus, still bad 
The bad Dolphin was still bad when tested with a connection between c1sus and the Dolphin swtich.
I'm headed over to Downs to see if we can resolve the issue with the PCIe extension fiber. 
Entry  Tue Jun 14 12:23:44 2011, Jamie, Joe, Update, CDS, WE ARE ALL GREEN! LSC back up and running in new configuration. 
After moving the c1lsc computer to 1X4, then connecting c1lsc to it's IO chassis in 1Y3 by a fiber PCIe extension cable, everything is back up and running
and the status screen is all green.  c1lsc is now directly connected to c1sus via a short copper Dolphin cable.
After lunch we will do some more extensive testing of the system to make sure everything is working as expected.
Entry  Tue Jun 14 16:38:31 2011, Jamie, Update, PSL, Tweaked input pointing to PMC 
The PMC trans power was a little low (0.77V or so).  I tweaked up the input pointing and now we're getting about 0.875V transmitted.
Entry  Tue Jun 14 18:12:34 2011, Jamie, Kiwamu, Update, LSC, LSC seems to be fully recovered 
We are now locking the arms reliably, with reasonable transmitted power.  We zeroed the LSC offsets with script, since they were apparently not
being reset with either the overall burt restore or the arm restore scripts.
We have lost a bit of power through the mode cleaner.  However, we have opted not to tweak it up just yet, so that we don't have to realign
Entry  Thu Jan 13 03:00:01 2011, Jenne, Update, IOO, WFS shenanigans D990249-B-1_MCWFS_schematic.pdf
My goal this afternoon was to measure the quantum efficiency of the MC WFS.  In the process of doing this,
I discovered that when I reverted a change in the MCWFS path (see elog 4107 re: this change), 
    Reply  Thu Jan 13 12:56:57 2011, rana, Update, IOO, WFS shenanigans PerkinElmerQPDs.pdf
Actually, I just found out that there are different flavors of 'YAG-444'. 
There's a YAG-444AH and also a YAG-444-4AH. I'm not sure which one we have or even which is better. The diode's internal resistance is not listed.
They also say explicitly that he 'YAG Enhancement' is just using thicker Silicon. Since the absorption of 1064 nm light in Silicon is very small,
    Reply  Fri Jan 28 13:07:31 2011, Jenne, Update, IOO, Beam is back on the WFS 
The MC WFS have had beam dumps in front of them for the past ~2 weeks, until I could find the appropriate optic to put in the WFS path, to avoid melting
the WFS' electronics. 
Koji noted that Steve had a W2-45S in a secret stash near his desk (which Steve later had put into the regular optics storage shelves down the
    Reply  Fri Jan 28 18:19:21 2011, Jenne, Update, IOO, WFS2 has some kind of oil on it Oily_WFS2.jpg
Mystery solved!
I removed WFS2 from the AP table (after placing markers so I can put it back in ~the same place) so that I could take some reflectivity as a function
of angle measurements for aLIGO WFS design stuff.
    Reply  Mon Feb 14 15:59:49 2011, Jenne, Update, IOO, WFS quantum efficiency as a function of angle 
[Larisa and Jenne]
A few weeks ago (on the 28th of January) I had tried to measure the quantum efficiency of one quadrant of the WFS as a function of angle. 
However, Rana pointed out that I was a spaz, and had forgotten to put a lens in front of the laser.  Why I forgot when doing the measurement as a
       Reply  Wed Jun 15 00:49:34 2011, Suresh, Update, IOO, WFS2 has been fixed. WFS_QE_measurement.pngSensorsBrochure-p12.pdfP6150121.JPGP6150124.JPG
 
The WFS2 sensor head had a damaged Quadrant PIN diode (YAG-444-4A).  This has been replaced by a   YAG-444-4AH  which has a
responsivity of 0.5 A/W. 
Entry  Wed Jun 15 01:30:38 2011, Jamie, Summary, LSC, Schnupp asymmetry measurement schnupp.pngarm_phase.pyplot.pyschnupp_ETMX.pikschnupp_ETMY.pik
Measurement of Schnupp asymmetry
This was done by measuring the relative phase between the sidebands reflected from the two arms while the
arm cavities are locked.
Entry  Wed Jun 15 02:20:00 2011, Jenne, Update, Locking, MICH noise budget? MICH_noise_budget_measurements_15June2011.jpg
I would like to announce my confusion with regard to the
MICH noise budget, in hopes that someone else has some inspiration. 
If you tilt your head sideways, you will notice that in this plot (totally uncalibrated, as yet), the BLACK trace, which is my white-light
    Reply  Wed Jun 15 12:16:37 2011, Jamie, Update, Locking, MICH noise budget? 


    
        
          
 Quote
        
        
            If you tilt your head sideways, you will notice that in this plot (totally uncalibrated, as yet), the BLACK
Entry  Wed Jun 15 15:18:01 2011, kiwamu, Update, General, Wednesday cleaning 
[Jenne / Kiwamu]
We spent approximately an hour for the weekly Wednesday cleaning.
This time we moved onto an area where a desk and optics shelf reside along the Y arm.
Entry  Wed Jun 15 16:37:56 2011, Jenne, Update, PEM, PEM AA Board has been diagnosed and fixed 1X7_AAboard_connector_fix.pdf
[Jenne, Steve]
After talking with Steve, I had a look at the PEM's AA board, to see what the problem was. 
Steve said the symptom he had noticed was that the Kepco power supplies which supply the +\- 5 V to the AA board were railing at their current
    Reply  Thu Jun 16 00:39:08 2011, Koji, Update, PEM, PEM AA Board has been diagnosed and fixed 
As seen in the photo, the board has a strange bulge on the board,
and the color of the
Entry  Thu Jun 16 00:43:36 2011, Koji, Update, SUS, Vertex SUS Binary Output Boxes were turned off / need investigation 
- I was investigating the SUS whitening issue.
- I could not find any suspension which can handle the input whitening switch correctly.
- I went to 1X5 rack and found that both of the two binary output boxes were turned off. 
    Reply  Thu Jun 16 08:45:14 2011, steve, Update, SUS, Vertex SUS Binary Output Boxes removed P1070894.JPG


    
        
            Quote:
        
        
            

           - I was investigating the SUS whitening issue.
       Reply  Thu Jun 16 23:19:09 2011, Koji, Update, SUS, Vertex SUS Binary Output Boxes removed 
[Jamie, Koji]
- We found the reason why some of the LEDs had no light. It was because the LEDs were blown
as they were directly connected to the power supply.
Entry  Fri Jun 17 00:17:26 2011, rana, Configuration, Electronics, 2 RFPDs sent to LLO P1070895.JPG
Koji and I found 2 RFPD boxes to send to LLO. We've put them onto Steve's desk to be overnighted to Valera.
One of them is our old 21.5 MHz gold box RFPD from the FSS (which we don't use). The other one is a 2mm gold box one which was previously tuned
for 66 MHz.
Entry  Fri Jun 17 08:03:48 2011, steve, Update, SUS, ITMY sus damping restored 
ITMY sus damping restored.
 
Entry  Fri Jun 17 17:02:15 2011, Jamie, Update, SUS, ETMX/ETMY binary output modules (re)installed, not yet tested 
I have installed a new binary output module in ETMY, where there was none previously.  It is installed, powered (with working LEDs), hooked up (to
the binary output card and the cross connect), but it hasn't been fully tested yet.
I also re-installed the binary output module in ETMX, with newly modified power-indicator LEDs.
Entry  Fri Jun 17 23:20:05 2011, Koji, Update, LSC, Some updates of the LSC screen screen.png
Some updates of the LSC screen
- Signal amplitude monitor for the PD signals (--> glows red for more than 1000)
- Kissel Buttons for the main matrices
Entry  Mon Jun 20 09:04:13 2011, steve, Update, SUS, ETMX damping restored 
ETMX sus damping restored
Entry  Mon Jun 20 09:28:19 2011, Jamie, Update, CDS, Shutting down low-voltage DC power in 1X1/1X2 racks 
In order to install the BO module in 1X2, I need to shut down all DC power to the 1X1 and 1X2 racks.
    Reply  Mon Jun 20 10:45:43 2011, Jamie, Update, CDS, Power restored to 1X1/1X2 racks. IOO binary output module installed. 
All power has been restored to the 1X1 and 1X2 racks.  The modecleaner is locked again.
I have also hooked up the binary output module in 1X2, which was never actually powered.  This controls the whitening filters for MC WFS. 
Still needs to be tested.
Entry  Mon Jun 20 11:04:03 2011, Nicole, Update, SUS, Work Plan for Week 2 
Here is my work plan for this week:
Current Week Plan (Week 2) (As of 6/17/11)
 
Setting Up for Horizontal Displacement Measurements

1) Help Steve clean small table for experiment
Entry  Mon Jun 20 17:58:00 2011, rana, Update, CDS, Gateway program killed 
There was a rogue, undocumented, gateway process running on NODUS since ~4 PM. This guy was broadcasting channels back into the Martian and causing lockups
in the IOO controls. I did a kill -9 on its process.
Someone will pay for this.
Entry  Mon Jun 20 18:12:20 2011, Nicole, Update, SUS, Small Table Cleaned and Levelled  P6220198.JPGP6220199.JPG

The small optical bench (next to the MC-2 Chamber and the tool box tower) has been cleared of the misc. object previously on it, cleaned, and leveled
Entry  Tue May 3 04:09:53 2011, Koji, Update, LSC, REFL55 PD update REFL55.pdf
[Rana, Koji]
REFL55 was modified. The noise level confirmed. The PD is now ready to be installed.
 
    Reply  Mon Jun 20 18:36:49 2011, Suresh, Update, LSC, REFL55 PD update REFL55_response.pdf
[Suresh, Koji]
   I used a matlab code written by Koji to analyse the transimpedance and current noise data  of REFL55.  The details are in
the attached pdf file.
Entry  Tue Jun 21 00:38:21 2011, Sonali, Update, Green Locking, repositioned "QPDY_PD" ETMY_table_2011_June20.pngETMY_table_change1.jpg
1.The aim is the laser frequency stabilisation of PSL and AUX.
2.As a first step we want to couple some of the AUX laser beam into a single mode optical fibre and route the fibre to the PSL table.
3.The position of the optical fibre on the ETMY table is shown by the coupler in the attached picture. The yellow lines show the new scheme we
Entry  Tue Jun 21 16:11:13 2011, steve, Update, SAFETY, surf safety training P1070902.JPG
40m surfs:  Nicole Ing, Iswita Saikia and Sonali Mohapatra received 40m specific safety training  today.
Entry  Tue Jun 21 19:10:29 2011, Suresh, Update, Environment, ETMY end table 
[Suresh, Sonali]
There were small pieces of glass, remnants of a fluorescent tube, which were lying around
on the ETMY end table for a while now.  We picked up the larger pieces by hand and used the HEPA filtered vacuum cleaner to pick up the remaining
Entry  Tue Jun 21 19:54:33 2011, Suresh, Update, Green Locking, LightWave NPRO power supply shifted to ETMY end table 
The Lightwave NPRO power supply which is being shared between the AS table and the ETMY table has been shifted back to the ETMY table. 
The current to the laser is set at 1.5A.  The laser output is 200mW at this current level.
Entry  Tue Jun 21 20:35:50 2011, kiwamu, Update, LSC, a script to measure sensing matrix elog.png
Last night I was making a script which will measure the sensing matrix using the realtime LOCKIN module.
The script is a kind of expansion of Jamie's one, which measure the asymmetry, to more generic purpose.
It will shake a suspended optic of interest and measure the response of each sensor by observing the demodulated I and Q signals from the LOCKIN
Entry  Wed Jun 22 01:59:43 2011, Sonali, Update, Green Locking, fibre-coupling of the IR beam  ETMY_june_21.jpgcollimation_700nm_21_june.JPG
 What I did today.
1. Collimation of a beam.

    I then practiced collimation of a 700 nm laser (output) beam after being coupled through a fibre.
    I put together the set-up
Entry  Wed Jun 22 12:24:44 2011, Nicole, Summary, SUS, Midweek 2 Work Summary P6220200.JPG
I have made my transfer function model and posted it to
the suspension wiki. Here is the link to my model!
Bode Plot
Entry  Wed Jun 22 12:29:57 2011, Ishwita, Summary, Adaptive Filtering, Weekly summary 
I started on the 16th with a very intense lab tour & was fed with a large amount of data (I can't guarantee that I remember everything....)
Then... did some (not much) reading on filters since I'm dealing with seismic noise cancellation this summer with Jenne at the 40m lab.
Entry  Wed Jun 22 15:24:10 2011, kiwamu, Update, ABSL, got a laser controller for LightWave DSC_3150.JPGDSC_3153.JPG
Peter King came over to the 40m with a laser controller and gave it to us.
We will test it out with the LightWave NPRO, which was used for MOPA.
Entry  Wed Jun 22 17:35:35 2011, Ishwita, Update, General, Hot air station P6220212.JPGP6220213.JPG
This is the new hot air station for the 40m lab.........
 
Entry  Tue Jun 21 23:29:41 2011, kiwamu, Update, LSC, sensing matrix measurement 
I am now measuring the sensing matrix in the DRMI configuration.
A goal of tonight is to measure the sensing matrix as a test of the script.
 
    Reply  Wed Jun 22 17:42:03 2011, kiwamu, Update, LSC, sensing matrix measurement sensemat.png
The sensing matrix was measured in the DRMI configuration for the first time.
The measurement was done by an automatic script and the realtime LOCKIN
module built in the c1lsc model.
Entry  Wed Jun 22 18:41:23 2011, Nicole, Summary, SUS, BROKEN bread board circuit box and L9337 LED Current Versus Voltage Curve LED_I_vs_V_exp_plot.png
NOTE: The potentiometers on the bread
board circuit box (the one I have been using with the signal generator, DC power, LED displays, and pulse switches)
Entry  Wed Jun 22 18:50:45 2011, Jamie, Summary, General, July 2011 vent plan 
Kiwamu and I have started to put together a vent plan on the 40m wiki:
http://blue.ligo-wa.caltech.edu:8000/40m/vent/201107
We will keep working on this (there's still a *lot* to fill in), but please help fill in the plan by adding questions, answers, procedures, preparations,
    Reply  Wed Jun 22 21:36:41 2011, rana, Summary, General, July 2011 vent plan 
I put a paper Peet's bag with half of the Mini-Moos into George. 
Entry  Thu Jun 23 02:12:12 2011, Sonali, Update, Green Locking, work schedule. 
 June 22-June 24:
1.Coupling light into fibre at the ETMY.
2.Routing of the fibre to the PSL table.
Entry  Thu Jun 23 05:22:51 2011, kiwamu, Update, LSC, PRMI locking : not stable enough 
I was trying to measure the sensing
matrix in the PRMI configuration, but basically gave up.
It is mainly because the lock of PRMI wasn't so stable and it didn't stay locked for more than a minute.
    Reply  Thu Jun 23 09:46:16 2011, rana, Update, LSC, PRMI locking : not stable enough 
All the suspensions are bad until you fix them. But, ... there is a script
which can be used to diagnose them today:
Python SUStest
Entry  Thu Jun 23 10:17:49 2011, steve, Update, PSL, AP table is open to PSL again P1070911.JPGP1070910.JPG
Access to the north side of the PSL table is blocked by the    8" beam guard. This opens the beam pathways between them.
Entry  Thu Jun 23 10:35:12 2011, steve, Update, Computers, old computers leaving the lab P1070905.JPGP1070904.JPGblade1000.JPG
Rod Luna picked up these computers for Larry Wallace yesterday: Dell Inspiron 530, Dell Dimension 4600 and SunBlade 1000
Entry  Thu Jun 23 21:34:21 2011, kiwamu, Update, CDS, no foton on the CentOS machines  
For some reasons foton's deafault sample rate is NOT correct when it runs on the CentOS machines.
It tries to setup the sample rate to be 2048 Hz instead of 16384 Hz until you specify the frequency.
To avoid an accidental change of the sample rate, 