Thu Jun 9 10:38:30 2011, steve, Update, PSL, PMC needs help
|
Thu Jun 9 12:21:07 2011, kiwamu, Update, PSL, Re : PMC needs help
|
Thu Jun 9 18:25:22 2011, kiwamu, HowTo, CDS, look back a channel which doesn' exist any more
|
Thu Jun 9 20:10:38 2011, kiwamu, Update, SUS, ETMY whitening filter : all off
|
Thu Jun 9 16:18:03 2011, josephb, Update, CDS, Second trends only go back 12 days
|
Fri Jun 10 12:02:10 2011, rana, Update, CDS, Second trends only go back 12 days
|
Fri Jun 10 12:04:57 2011, Jenne, Update, RF System, Bad RF connections!!
|
Fri Jun 10 14:50:37 2011, Koji, Update, LSC, New LSC code installed
|
Fri Jun 10 18:49:40 2011, kiwamu, Update, IOO, Intensity Noise after the MC
|
Mon Jun 13 12:34:21 2011, Jamie, Koji, Update, LSC, Updated LSC model installed
|
Mon Jun 13 15:33:55 2011, Jamie, Joe, Update, CDS, Dolphin fiber between 1Y3 and 1X4 appears to be dead
|
Fri Jun 10 20:23:56 2011, Larisa Thorne, Update, Electronics, Seismometer Box Update/graphs
|
Mon Jun 13 16:27:10 2011, Jenne, Update, Electronics, Seismometer Box Update/graphs
|
Mon Jun 13 18:40:08 2011, Jamie, Joe, Update, CDS, Snags in the repair of LSC CDS
|
Mon Jun 13 19:26:42 2011, Jamie, Joe, Configuration, CDS, SUS binary IO chassis 2 and 3 moved from 1X5 to 1X4
|
Tue Jun 14 09:24:36 2011, steve, Configuration, Photos, SUS binary IO chassis 2 and 3 moved from 1X5 to 1X4 
|
Tue Jun 14 09:25:17 2011, Jamie, Update, CDS, Dolphin fiber tested with c1sus, still bad
|
Tue Jun 14 12:23:44 2011, Jamie, Joe, Update, CDS, WE ARE ALL GREEN! LSC back up and running in new configuration.
|
Tue Jun 14 16:38:31 2011, Jamie, Update, PSL, Tweaked input pointing to PMC
|
Tue Jun 14 18:12:34 2011, Jamie, Kiwamu, Update, LSC, LSC seems to be fully recovered
|
Thu Jan 13 03:00:01 2011, Jenne, Update, IOO, WFS shenanigans
|
Thu Jan 13 12:56:57 2011, rana, Update, IOO, WFS shenanigans
|
Fri Jan 28 13:07:31 2011, Jenne, Update, IOO, Beam is back on the WFS
|
Fri Jan 28 18:19:21 2011, Jenne, Update, IOO, WFS2 has some kind of oil on it
|
Mon Feb 14 15:59:49 2011, Jenne, Update, IOO, WFS quantum efficiency as a function of angle
|
Wed Jun 15 00:49:34 2011, Suresh, Update, IOO, WFS2 has been fixed.   
|
Wed Jun 15 01:30:38 2011, Jamie, Summary, LSC, Schnupp asymmetry measurement    
|
Wed Jun 15 02:20:00 2011, Jenne, Update, Locking, MICH noise budget?
|
Wed Jun 15 12:16:37 2011, Jamie, Update, Locking, MICH noise budget?
|
Wed Jun 15 15:18:01 2011, kiwamu, Update, General, Wednesday cleaning
|
Wed Jun 15 16:37:56 2011, Jenne, Update, PEM, PEM AA Board has been diagnosed and fixed
|
Thu Jun 16 00:39:08 2011, Koji, Update, PEM, PEM AA Board has been diagnosed and fixed
|
Thu Jun 16 00:43:36 2011, Koji, Update, SUS, Vertex SUS Binary Output Boxes were turned off / need investigation
|
Thu Jun 16 08:45:14 2011, steve, Update, SUS, Vertex SUS Binary Output Boxes removed
|
Thu Jun 16 23:19:09 2011, Koji, Update, SUS, Vertex SUS Binary Output Boxes removed
|
Fri Jun 17 00:17:26 2011, rana, Configuration, Electronics, 2 RFPDs sent to LLO
|
Fri Jun 17 08:03:48 2011, steve, Update, SUS, ITMY sus damping restored
|
Fri Jun 17 17:02:15 2011, Jamie, Update, SUS, ETMX/ETMY binary output modules (re)installed, not yet tested
|
Fri Jun 17 23:20:05 2011, Koji, Update, LSC, Some updates of the LSC screen
|
Mon Jun 20 09:04:13 2011, steve, Update, SUS, ETMX damping restored
|
Mon Jun 20 09:28:19 2011, Jamie, Update, CDS, Shutting down low-voltage DC power in 1X1/1X2 racks
|
Mon Jun 20 10:45:43 2011, Jamie, Update, CDS, Power restored to 1X1/1X2 racks. IOO binary output module installed.
|
Mon Jun 20 11:04:03 2011, Nicole, Update, SUS, Work Plan for Week 2
|
Mon Jun 20 17:58:00 2011, rana, Update, CDS, Gateway program killed
|
Mon Jun 20 18:12:20 2011, Nicole, Update, SUS, Small Table Cleaned and Levelled 
|
Tue May 3 04:09:53 2011, Koji, Update, LSC, REFL55 PD update
|
Mon Jun 20 18:36:49 2011, Suresh, Update, LSC, REFL55 PD update
|
Tue Jun 21 00:38:21 2011, Sonali, Update, Green Locking, repositioned "QPDY_PD" 
|
Tue Jun 21 16:11:13 2011, steve, Update, SAFETY, surf safety training
|
Tue Jun 21 19:10:29 2011, Suresh, Update, Environment, ETMY end table
|
Tue Jun 21 19:54:33 2011, Suresh, Update, Green Locking, LightWave NPRO power supply shifted to ETMY end table
|
Tue Jun 21 20:35:50 2011, kiwamu, Update, LSC, a script to measure sensing matrix
|
Wed Jun 22 01:59:43 2011, Sonali, Update, Green Locking, fibre-coupling of the IR beam 
|
Wed Jun 22 12:24:44 2011, Nicole, Summary, SUS, Midweek 2 Work Summary
|
Wed Jun 22 12:29:57 2011, Ishwita, Summary, Adaptive Filtering, Weekly summary
|
Wed Jun 22 15:24:10 2011, kiwamu, Update, ABSL, got a laser controller for LightWave 
|
Wed Jun 22 17:35:35 2011, Ishwita, Update, General, Hot air station 
|
Tue Jun 21 23:29:41 2011, kiwamu, Update, LSC, sensing matrix measurement
|
Wed Jun 22 17:42:03 2011, kiwamu, Update, LSC, sensing matrix measurement
|
Wed Jun 22 18:41:23 2011, Nicole, Summary, SUS, BROKEN bread board circuit box and L9337 LED Current Versus Voltage Curve
|
Wed Jun 22 18:50:45 2011, Jamie, Summary, General, July 2011 vent plan
|
Wed Jun 22 21:36:41 2011, rana, Summary, General, July 2011 vent plan
|
Thu Jun 23 02:12:12 2011, Sonali, Update, Green Locking, work schedule.
|
Thu Jun 23 05:22:51 2011, kiwamu, Update, LSC, PRMI locking : not stable enough
|
Thu Jun 23 09:46:16 2011, rana, Update, LSC, PRMI locking : not stable enough
|
Thu Jun 23 10:17:49 2011, steve, Update, PSL, AP table is open to PSL again 
|
Thu Jun 23 10:35:12 2011, steve, Update, Computers, old computers leaving the lab  
|
Thu Jun 23 21:34:21 2011, kiwamu, Update, CDS, no foton on the CentOS machines
|
|