Wed Jan 16 10:57:37 2013, tara, Summary, IOO, Noise budget for MC    
|
Wed Jan 16 19:08:51 2013, Koji, Summary, IOO, Noise budget for MC
|
Thu Jan 17 01:27:54 2013, Tara(?), Summary, IOO, Noise budget for MC
|
Wed Jan 16 18:58:08 2013, Riju, Update, , Photodiode transimpedance
|
Wed Jan 16 08:29:45 2013, Steve, Update, SUS, PRM damping restored
|
Tue Jan 15 19:26:35 2013, jamie, Update, Alignment, Adjustment of active TTs and input alignment
|
Tue Jan 15 20:00:42 2013, Manasa, Update, Alignment, Adjustment of active TTs and input alignment
|
Wed Jan 9 18:59:01 2013, Jenne, Update, Alignment, TT2 installed, PRM oplev layout changed
|
Thu Jan 10 15:30:33 2013, Jenne, Update, Alignment, TT2 pins swapped, ITMX door open
|
Fri Jan 11 17:32:10 2013, Manasa, Update, Alignment, TT2 connections
|
Fri Jan 11 19:12:20 2013, Koji, Update, Alignment, TT2 connections
|
Mon Jan 14 10:12:09 2013, Jenne, Update, Alignment, TT2 connections
|
Mon Jan 14 12:08:39 2013, jamie, Update, Alignment, TT2 connections
|
Fri Jan 11 11:07:04 2013, Manasa, Update, General, IFO status update - PMC problems
|
Fri Jan 11 16:13:47 2013, Jenne, Update, General, IFO status update - PMC fixed
|
Mon Jan 14 09:08:37 2013, Steve, Update, PSL, PMC is only ok short term
|
Mon Jan 7 16:45:30 2013, Jenne, Update, Alignment, Risers to bring TTs to correct beam height are wrong 
|
Tue Jan 8 17:54:34 2013, Jenne, Update, Alignment, Risers to bring TTs to correct beam height are in use
|
Thu Jan 10 12:22:36 2013, Jenne, Update, Alignment, TT matrix is funny
|
Wed Jan 9 19:32:24 2013, Riju, Update, , Photodiode transimpedance    
|
Mon Dec 17 22:42:27 2012, Koji, Summary, General, The projector lamp ended its life?
|
Mon Dec 17 22:49:33 2012, Manasa, Summary, General, The projector lamp ended its life?
|
Tue Dec 18 00:45:19 2012, Koji, Summary, General, The projector lamp ended its life?
|
Wed Jan 9 13:34:34 2013, Koji, Summary, General, The projector lamp ended its life?
|
Tue Jan 8 18:10:41 2013, Jenne, Update, SUS, PRM, SRM, BS oplevs off
|
Thu Jan 3 20:34:43 2013, Riju, Update, , Photodiode transimpedance
|
Fri Jan 4 13:23:10 2013, rana, Update, Electronics, Photodiode transimpedance
|
Tue Jan 8 14:07:04 2013, Riju, Update, Electronics, Photodiode transimpedance
|
Tue Jan 8 15:28:41 2013, Riju, Update, Electronics, Photodiode transimpedance
|
Tue Jan 8 14:01:21 2013, Riju, Update, , Photodiode transimpedance   
|
Mon Jan 7 19:23:19 2013, rana, Update, Electronics, Jamie's 1811 PS from 1998 
|
Mon Jan 7 00:08:16 2013, Jenne, HowTo, Alignment, In-vac plan
|
Thu Jan 3 19:19:59 2013, rana, HowTo, Electronics, cable racks
|
Wed Jan 2 15:33:23 2013, Jenne, HowTo, Locking, We should retry in-air locking
|
Fri Dec 21 16:50:30 2012, Rana, Update, SUS, TT in vac DB25 pin swapping
|
Wed Jan 2 06:52:50 2013, Koji, Update, SUS, TT in vac DB25 pin swapping
|
Fri Dec 21 19:49:39 2012, Riju, Update, , Photodiode transimpedance   
|
Thu Dec 20 12:14:19 2012, Jamie, Update, General, problem with in-vac wiring for TTs
|
Thu Dec 20 17:13:56 2012, Jamie, Update, General, how to deal with problem with in-vac wiring for TTs
|
Thu Dec 20 18:33:52 2012, Jamie, Update, General, in-vac adapter cables for TTs
|
Fri Dec 21 09:55:23 2012, Steve, Update, General, in-vac adapter cables for TTs 
|
Thu Dec 20 19:46:20 2012, rana, Configuration, Environment, Control Room Projector
|
Wed Dec 19 18:40:00 2012, Jenne, Update, IOO, PZT1 removed, TT1 in place
|
Wed Dec 19 19:28:12 2012, Manasa, Update, IOO, PZT1 removed, TT1 in place
|
Thu Dec 20 10:11:12 2012, Manasa, Update, IOO, TT1 connections
|
Thu Dec 20 10:35:27 2012, Steve, Update, IOO, TT1 connections
|
Wed Dec 19 21:35:33 2012, Koji, Summary, General, First Contact Training with Margot
|
Mon Dec 17 21:41:30 2012, rana, Summary, SUS, BeCu wire
|
Wed Dec 19 11:14:25 2012, Steve, Update, SUS, BeCu wire in stock
|
Tue Dec 18 16:44:00 2012, riju, Update, , Photodiode transimpedance
|
Mon Nov 12 09:21:10 2012, Steve, Update, VAC, pumpdown has started  
|
Mon Nov 12 16:52:03 2012, Steve, Update, VAC, pumpdown has completed 
|
Tue Nov 13 08:34:11 2012, Steve, Summary, VAC, pumpdown after 24days at atmosphere  
|
Tue Nov 27 09:44:09 2012, Steve, Update, VAC, pumpdown at 15 days 
|
Tue Dec 18 16:37:40 2012, Steve, Update, VAC, last RGA scan before vent 
|
Tue Dec 18 16:37:17 2012, Jamie, Update, Alignment, Post vent, pre door removal alignment
|
Tue Dec 18 15:51:33 2012, Jenne, Update, IOO, Old G&H TT mirrors' phase maps measured
|
Fri Dec 14 01:42:53 2012, Den, Update, SUS, TT angle of incidence
|
Fri Dec 14 02:52:32 2012, Koji, Update, SUS, TT angle of incidence
|
Tue Dec 18 15:32:29 2012, Jenne, Update, SUS, TT angle of incidence
|
Fri Dec 14 03:15:49 2012, Jenne, Update, SUS, TT angle of incidence
|
Mon Dec 17 19:47:15 2012, rana, Update, PEM, Seismic StripTool config updated
|
Mon Dec 17 18:39:02 2012, Jenne, Update, IOO, IPPOS centered, no IPANG beam
|
Mon Dec 17 14:45:01 2012, Jenne, Update, Alignment, Videos with PRMI locked
|
Tue Dec 4 10:51:10 2012, Steve, Update, SUS, PRM damping restored
|
Mon Dec 17 14:13:55 2012, Jenne, Update, SUS, PRM oplev gains restored
|
Mon Dec 17 11:20:58 2012, Jenne, Update, SUS, Beam dumps on vertex oplevs removed
|
Fri Dec 14 17:12:19 2012, Evan Hall, Update, PSL, PMC yaw tune-up (from Wednesday night)
|
Fri Dec 14 16:35:38 2012, Ayaka, Update, LSC, High frequency sensitivity improved  
|
Fri Dec 14 14:40:31 2012, Riju, Update, , Photodiode transimpedance
|
Fri Dec 14 03:32:51 2012, Ayaka, Update, LSC, High frequency noise in AS signal    
|
Fri Dec 14 09:31:59 2012, rana, Update, LSC, High frequency noise in AS signal
|
Fri Dec 14 10:09:30 2012, Ayaka, Update, LSC, High frequency noise in AS signal
|
Fri Dec 14 03:49:02 2012, Ayaka, Update, General, Earthquake 
|
Fri Dec 14 09:05:04 2012, steve, Update, PEM, TT after eq 6.1
|
Sat Sep 22 01:03:30 2012, Den, Update, PEM, ETMY table  
|
Mon Sep 24 17:03:39 2012, Jenne, Update, PEM, 1X1 rack power
|
Fri Oct 12 22:44:49 2012, Den, Update, PEM, ETMY table 6x
|
Sun Oct 14 11:41:42 2012, Den, Update, PEM, ETMY table  
|
Thu Dec 13 01:49:53 2012, rana, Update, PEM, seismometers
|
Thu Dec 13 21:21:34 2012, Den, Update, PEM, seismometers 
|
Thu Dec 13 18:06:59 2012, Ayaka, Update, WienerFiltering, New microphone mounts 
|
Mon Dec 3 17:04:12 2012, Ayaka, Update, PSL, PMC calibration for MC_F calibration    
|
Tue Dec 4 01:43:37 2012, rana, Update, PSL, PMC calibration for MC_F calibration
|
Tue Dec 4 11:30:36 2012, Zach, Update, PSL, PMC calibration for MC_F calibration
|
Thu Dec 13 17:24:53 2012, Ayaka, Update, PSL, PMC calibration for MC_F calibration 6x
|
Thu Dec 13 04:42:32 2012, Den, Update, SUS, ITMX local damping
|
Thu Dec 13 04:29:34 2012, Den, Update, SUS, TT angle of incidence
|
Sat Dec 8 04:12:38 2012, Den, Update, LSC, prcl
|
Sun Dec 9 01:21:51 2012, Den, Update, LSC, beam inside DRMI is clipping on PR3 Tip-Tilt 6x
|
Sun Dec 9 17:51:53 2012, rana, Update, LSC, beam inside DRMI is clipping on PR3 Tip-Tilt
|
Mon Dec 10 03:02:03 2012, Den, Update, LSC, beam inside DRMI is clipping on PR3 Tip-Tilt
|
Mon Dec 10 10:13:41 2012, Den, Update, LSC, beam inside DRMI is clipping on PR3 Tip-Tilt
|
Mon Dec 10 22:34:34 2012, Den, Update, LSC, beam inside DRMI is clipping on PR3 Tip-Tilt   
|
Thu Dec 13 03:20:48 2012, Den, Update, LSC, beam inside DRMI is clipping on PR3 Tip-Tilt  
|
Wed Dec 12 20:22:03 2012, Jamie, Update, Computer Scripts / Programs, illuminators fixed and added to VIDEO screen 
|
Wed Dec 12 17:26:47 2012, Riju, Update, , Testing AG4395A+GPIB
|
Wed Dec 12 16:52:12 2012, Jenne, Update, Alignment, PR2_face, PR3_back cameras in place   
|
Wed Dec 12 14:59:49 2012, Manasa, Configuration, 40m Upgrading, New tip-tilts layout in BSC
|
Wed Dec 12 11:49:05 2012, Ayaka, Update, LSC, Acoustic noise in POX and AS error signal 
|
Tue Dec 11 09:31:47 2012, Ayaka, Update, LSC, Oplev update for improving sensitivity 7x
|
Tue Dec 11 21:53:37 2012, Ayaka, Update, LSC, Oplev update for improving sensitivity 
|
|