  13460   Fri Dec 1 17:09:29 2017 Udit KhandelwalSummaryGeneral Current objectives and statuses:


CAD Model of 40m lab (facility,
chambers, invacuum components etc)

Status:
  
  13472   Wed Dec 13 17:46:08 2017 Udit KhandelwalSummaryGeneralSummary of Current Tasks40m
Lab CAD

1. 40m_bldg.dwg has 2D drawing
 top_view.pngisometic_view.png 
  13484   Fri Dec 15 18:24:46 2017 ranaSummaryOptical LeversPRMToday Angelina and I looked at the PRM
OL with an eye towards installing a 2nd QPD.
We want to try out 
  
  13489   Wed Dec 20 00:43:58 2017 KevinSummaryGeneralDAC noise contribution to squeezing noise budgetGautam and I looked into the DAC noise
contribution to the noise budget for homodyne
detection at the 40m. DAC noise is currently
 40m_squeezing.pdf40mDAC_squeezing.pdf 
  13490   Thu Dec 21 19:25:48 2017 KevinSummaryGeneralDAC noise contribution to squeezing noise budgetGautam and I redid our calculations, and
the updated plot of squeezing as a function
of DAC current noise per coil is shown in
 40mDAC_squeezing.pdf 
  13491   Fri Dec 22 09:40:19 2017 ranaSummaryGeneralDAC noise contribution to squeezing noise budget
Should not count the ITMs. On those
we can use big resistors / filters to cut
out the noise.
For the initial
  
  13494   Sun Dec 31 12:43:50 2017 ranaSummaryElectronicsSR560: reworkingI have
ordered some LSK389A (in both the SOIC-8
and TO-71 packages) to replace the SR560's
 Preamps.pdf 
  13516   Mon Jan 8 20:50:01 2018 ranaSummaryElectronicsSR560: reworkingI replaced the NPD5565 with a LSK389 (SOIC-8
with DIP adapter). There was a noise reduction
of ~30%, but not nearly as much as I expected.
  
  13544   Fri Jan 12 20:35:34 2018 Udit KhandelwalSummaryGeneral2018/01/12 Summary
40m Lab CAD


Worked
  
  13560   Fri Jan 19 15:22:19 2018 Udit KhandelwalSummaryGeneral40m CAD update 2018/01/1940m CAD Project


All parts will be now named
according to the numbering system in this
 Screenshot_3.png 
  13566   Mon Jan 22 12:48:48 2018 KojiSummaryGeneralBeat setup for aLIGO EOM testI'm planning to construct a beat setup
between the PSL and AUX beams. I am going
to make it in the area shown in a blue square
 IMG_3048.JPG 
  13567   Mon Jan 22 20:54:58 2018 KojiSummaryGeneralAUX-PSL beat setupThe beat setup has been made on the PSL
table. The BS and the PD were setup. The
beat was found at 29.42degC and 50.58degC
 IMG_3051.JPG 
  13575   Wed Jan 24 13:55:04 2018 KiraSummaryPEMSeismometer can insulation testGautam and I set up the insulated seismometer
can in the lab today. I had previously wired
up the two heaters I placed onto the sides
 6x 
  13601   Fri Feb 2 21:12:46 2018 Udit KhandelwalSummaryGeneralSummary - 2018/02/02Tip-Tilt
Suspension CAD:
Discussed with Koji about motivation
  
  13602   Fri Feb 2 22:47:00 2018 KojiSummaryGeneralAP1053: Packaging & PerformanceI've packaged an AP1053 in a Thorlabs
box. The gain and the input noise level were
measured. It has the gain of ~10 and the
 AP1053.JPGAP1053_measurement.pdfAP1053_gain.pdfAP1053_noise.pdf 
  13638   Fri Feb 16 21:03:17 2018 Udit KhandelwalSummaryGeneralSummary 2018/02/1640m Lab Cad:
Updated the dimensions of and fleshed
out the chambers in greater detail, by referring
  
  13654   Fri Feb 23 20:46:04 2018 Udit KhandelwalSummaryGeneralCAD Summary 2018/02/23I have more or less finished cadding the
test mass chamber by referring to the drawings
Steve gave me. Finer details like lugs and
 tmc_20180223.JPG 
  13662   Wed Feb 28 21:14:34 2018 gautamSummaryPEMChannel adminSince we decided to use the Acromag for
readback of the temperature sensor for Kira's
seismometer temperature control, I enabled
 tempSensData.png 
  13677   Fri Mar 9 20:35:41 2018 Udit KhandelwalSummaryGeneralSummary 2018/03/091. Optical Table Layout 

I had discussed with Koji a way
to record coordinates of optical table equipments
  
  13683   Thu Mar 15 16:00:25 2018 Larry WallaceSummaryComputersCert renewal for NODUSThe cert for nodus has been renewed for
another 2 years.

The following is the basic
  
  13686   Mon Mar 19 07:37:00 2018 Angelina PanSummary Proposed QPD Optical ArrangementI am currently working on an optical arrangement
consisting of a QPD that measures the fluctuations
of an incoming HeNe laser beam that
 angelinaCode.py.tar.bz2 
  13699   Thu Mar 22 17:47:16 2018 Angelina PanSummary Proposed QPD Optical Arrangement   IMG_0869.jpg 
  13705   Mon Mar 26 21:25:55 2018 ranaSummaryIOOMC2 Trans table has issuesGautam, Rana

While at the MC2 table, we noticed
that it has some optical problems:
 20180326_201929.jpg 
  13706   Mon Mar 26 21:40:26 2018 gautamSummaryIOOMC2 classical radiation pressure noise[rana, gautam]

we measured the RIN of the MC2
transmission using the PDA255 I had put on
 IMC_RIN.pdfIMC_RadPress.pdfMC2_radPress.tgz 
  13717   Thu Mar 29 12:03:37 2018 Jon RichardsonSummaryGeneralProof-of-Concept SRC Gouy Phase MeasurementI've been developing an idea for making
a direct measurement of the SRC Gouy phase at
RF. It's a very different approach from
 src_gouy_phase_v3.pdfmeasurement_block_diagram.png 
  13825   Tue May 8 10:24:10 2018 KiraSummaryPEMplan for this weekHere are a few things I will be working
on:


Design PCB boards for the
  
  13832   Fri May 11 11:47:33 2018 johannesSummaryPEMAcromag issuesThe replacement Acromag we scooped from
the West Bridge E-Shop does actually seem
to work, although we thought it was broken
  
  13844   Tue May 15 15:13:23 2018 KiraSummaryPEMAcromag issuesI tried calibrating the other channels
today, but they still fluctuate. Sometimes
they do stabilize at +/- 10V, but then suddenly
  
  13865   Fri May 18 18:14:18 2018 Udit KhandelwalSummaryGeneralSummary 05/18/2018Tip-Tilt Suspension Design:

Designed a new ECD plate and
changed dimensions of the side arms after
  
  13884   Wed May 23 19:24:37 2018 Udit KhandelwalSummaryGeneralSummary 05/23/2018Tip-Tilt Redesign Project with
Koji:

Did
 ecdplate_eddy.png 
  13898   Wed May 30 16:12:30 2018 Jonathan HanksSummaryCDSLooking at c1oaf issuesWhen c1oaf starts up there are 446 gain
channels that should be set to 0.0 but which
end up at 1.0.  An example channel is
  
  13979   Mon Jun 18 11:12:23 2018 KiraSummaryPEMfinishing up work at the labSince I am finishing my job at the lab,
I have stored all my electronics in a box
(attachment 1) and placed it under the table
 IMG_20180618_101640.jpgIMG_20180618_093920.jpgIMG_20180618_093932.jpg 
  13996   Thu Jun 21 14:23:22 2018 Udit KhandelwalSummaryGeneralA summary of the Tip-TIlt Mirror Holder design changesHere’s a quick summary of the Tip-Tilt
Design updates (all files are in the dropbox
in [TipTiltSus>TT_New]) that I have been
 1.png2.png3-1.png3-2.png3-3.png 
  13997   Thu Jun 21 14:57:59 2018 KojiSummaryGeneralA summary of the Tip-TIlt Mirror Holder design changes> 2. Weighted screw rod at the
bottom for tilting the mirror-holder:

Too long. The design of the holder
  
  14014   Mon Jun 25 19:14:02 2018 UditSummaryGeneralRe: A summary of the Tip-TIlt Mirror Holder design changes2. Weighted screw rod at the bottom
for tilting the mirror-holder:

The screw length selected here
 4-1.png4-2.png 
  14015   Mon Jun 25 21:14:08 2018 KojiSummaryGeneralRe: A summary of the Tip-TIlt Mirror Holder design changes3.
- Do we need this much of extended
range of the clamp location? How much range
  
  14042   Fri Jul 6 19:39:37 2018 Udit KhandelwalSummaryGeneralCAD drawings of cantilever suspension requiredRequest
to Koji to acquire the drawings or 3D CAD
of the cantilever suspensions of the Tip-Tilt
  
  14044   Sun Jul 8 12:20:12 2018 JonSummaryAUXGouy Phase Measurements from AUX-Laser ScansThis note reports analysis of cavity scans
made by directly sweeping the AUX laser carrier
frequency (no sidebands). The measurement
 yarm_aux_carrier_trans.pdfprmi_aux_carrier_trans.pdfdrmi_aux_carrier_trans.pdf 
  14047   Mon Jul 9 17:29:28 2018 Udit KhandelwalSummaryTip-TIltTipTilt mirror holder final changesFinal Summary of changes to mirror holder
in Tip-Tilt holder.

Determining minimum range
 d_COM.png1-1.png1-2.png2-1.png 
  Draft   Wed Jul 11 18:13:19 2018 keerthanaSummaryAUXGouy Phase Measurements from AUX-Laser ScansFrom the Measurement Jon made, FSR is 3.967
MHz and the Gouy phase is 52 degrees. From
this, the length of the Y-arm cavity
  
  14069   Fri Jul 13 20:36:33 2018 KojiSummaryGeneralIn vac/In air heater wiring I went to the Y-end and took more photos
of the cable stand. These revealed that in-vac
pin #13 is connected to the shield of the
 heater_wiring.pdf 
  14073   Mon Jul 16 15:07:19 2018 KojiSummaryVACOven C vent[Steve Koji]

- Attachment1: Removed the thermal
cap. Checked the temperature of the oven.
 P_20180716_141512.jpgP_20180716_141601.jpgP_20180716_141610.jpgP_20180716_141827.jpgP_20180716_143901.jpg 
  14077   Tue Jul 17 12:55:45 2018 KojiSummaryGeneralStarted pumping[Steve, Koji, Gautam]

We started pumping down
at ~12:15PM.
 6x 
  14079   Tue Jul 17 18:16:38 2018 SteveSummaryVACpumpdown 81 at 6 hrsPrecondition:  4 days at atm.  
Atm5

HEPA tent used during the vent
 6x 
  14080   Tue Jul 17 22:25:41 2018 KojiSummaryVACpumpdown 81 at 6 hrs10:20PM


Opened VM2 to pump down
the RGA section with TP1
Stopped
  
  14082   Wed Jul 18 12:49:08 2018 SteveSummaryVACpumpdown 81 at 6 +4.5hrsThe manual gate valve scan was clean. Atm1
    TP1 was pumping on it overnight.

         
 manlGateScan.pnghanding_over_Mag.pngTGVw2auxfans_.jpg 
  14083   Wed Jul 18 17:36:50 2018 SteveSummaryVACpumpdown 81 at 6 +9 hrs completedIFO P1 6e-4 Torr,  manual gate valve
is fully open

The annuloses will be pumped down
 pd81completed.pngpd81@30hrs.png 
  14085   Thu Jul 19 01:56:25 2018 gautamSummaryVACAUX pump shutdown[koji,
gautam]

Per Steve's instructions, we
  
  14086   Thu Jul 19 04:44:09 2018 Annalisa, TerraSummaryThermal Compensationfrequency shift observed with heating!Annalisa, Gautum, Koji, Terra

Summary: with
the reflector setup, we measured a frequency
 scanning_fine_2018-07-19-07-32-08_parsed.pdfscanning_fine_2018-07-19-06-57-47_parsed.pdfYscan_scanning_parsed_2am.txt.pdf 
  14087   Thu Jul 19 11:01:03 2018 SteveSummaryVACpd81 @ 2e-5 TorrCold cathode gauge just turned on.  pd81@2days.png 