40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 61 of 344  Not logged in ELOG logo
Entry  Tue Aug 21 01:54:09 2012, Jenne, Update, Locking, FPMI locked - arms locked with IR 
Entry  Tue Aug 21 01:59:33 2012, Jenne, Update, Green Locking, Green locking needs help! 
Entry  Tue Aug 21 15:25:41 2012, Jenne, Update, Computers, pyepics installed 
Entry  Tue Aug 21 22:54:47 2012, Jenne, Update, Locking, Removed beam dump from POY path 
Entry  Wed Aug 22 01:54:03 2012, Jenne, Update, General, List o' things: YarmASS, ETMXTcamera, POXwhiteningTriggering 
Entry  Wed Aug 22 16:50:09 2012, Jenne, Update, Locking, Double integrator in ARM LSC servos DoubleIntegrator_timeSeries_LowRes.pngDoubleIntegrator_Bode_vs_Ramp_LowRes.png
Entry  Wed Aug 22 18:58:12 2012, Jenne, Update, PEM, Weird BLRMS increase 10x
    Reply  Thu Aug 23 00:18:54 2012, Jenne, Update, PEM, Weird BLRMS increase BS_OSEMsensors_higherFreqPeakIsOlder_LowerFreqPeakIsMoreRecent.pdf
Entry  Thu Aug 23 21:53:06 2012, Jenne, Update, Green Locking, Xgreen still wouldn't lock 
    Reply  Thu Aug 23 22:54:32 2012, Jenne, Update, Green Locking, Xgreen still wouldn't lock Xarm_Green_ErrorReflSignals_23Aug2012_LowRes.png
    Reply  Fri Aug 24 14:46:08 2012, Jenne, Summary, General, Detailed alignment plan 
Entry  Fri Aug 24 22:01:15 2012, Jenne, Update, IOO, MC spot position - close MCdecenter_24Aug2012.png
    Reply  Sun Aug 26 11:53:09 2012, Jenne, Update, IOO, MC2 getting kicked up regularly 
    Reply  Sun Aug 26 12:26:44 2012, Jenne, Update, IOO, MC spot position - not done yet 
Entry  Sun Aug 26 20:58:21 2012, Jenne, Update, VAC, Don't vent!!!! 
    Reply  Mon Aug 27 01:05:36 2012, Jenne, Update, IOO, MC spot position - callin' it quits MCdecenter_26Aug2012.png
    Reply  Mon Aug 27 15:49:46 2012, Jenne, Update, SUS, EQ damage 
    Reply  Mon Aug 27 18:32:48 2012, Jenne, Update, IOO, MC spot position - Jenne is stupid 
    Reply  Mon Aug 27 23:52:59 2012, Jenne, Update, IOO, MC Spots centered MCdecenter_26Aug2012.png
    Reply  Tue Aug 28 00:23:54 2012, Jenne, Update, PSL, PMC alignment going bad PMC_transmission_GoingDown_27Aug2012.png
    Reply  Tue Aug 28 17:43:04 2012, Jenne, Update, PSL, Power reduced! 
    Reply  Tue Aug 28 17:51:39 2012, Jenne, Update, PSL, PBS and Half Wave plates introduced 
Entry  Tue Aug 28 17:59:03 2012, Jenne, Update, VAC, VENT: GO! 
Entry  Wed Aug 29 21:02:45 2012, Jenne, Update, IOO, Optics between Faraday and PRM are centered, realigned 
Entry  Thu Aug 30 19:08:08 2012, Jenne, Update, VAC, Dogs on BS, ITM chambers checked 
Entry  Thu Aug 30 20:20:52 2012, Jenne, Update, SUS, Watek camera placed on SE viewport of ITMX to look at PRM 
Entry  Thu Aug 30 20:31:35 2012, Jenne, Update, IOO, PZT1 and PZT2 set to center of their ranges 
Entry  Tue Sep 4 11:32:58 2012, Jenne, Update, Locking, Friday in-vac work 
Entry  Tue Sep 4 13:31:55 2012, Jenne, Update, General, The Plan 
Entry  Tue Sep 4 20:03:38 2012, Jenne, Update, General, in-vac progress 
Entry  Tue Sep 4 20:06:04 2012, Jenne, Update, Locking, MC scan input switched to the 11MHz port of EOM 
    Reply  Tue Sep 4 20:13:46 2012, Jenne, Update, General, The Plan - Tues evening version 
Entry  Wed Sep 5 19:29:45 2012, Jenne, Update, General, Yarm aligned to IR incident beam 
    Reply  Thu Sep 6 10:57:27 2012, Jenne, Update, General, Forgot to turn green refl pd back on 
Entry  Thu Sep 6 13:07:02 2012, Jenne, Update, IOO, IPANG no longer a reference :( 
Entry  Thu Sep 6 16:46:44 2012, Jenne, Update, SUS, BS aligned, target removed 
Entry  Thu Sep 6 18:49:30 2012, Jenne, Update, RF System, AS 55 may be broken 
    Reply  Thu Sep 6 19:36:19 2012, Jenne, Update, RF System, AS 55 is fine 
Entry  Fri Sep 7 01:25:53 2012, Jenne, Update, General, PRC, SRC flashing 
    Reply  Fri Sep 7 17:34:53 2012, Jenne, Update, Computers, Sensoray Video Capture 
    Reply  Fri Sep 7 17:37:16 2012, Jenne, Update, , cavitymode scan 
Entry  Sat Sep 8 00:04:53 2012, Jenne, Update, General, Beam scan measurement plan - to do Monday morning. 
Entry  Thu Sep 13 17:19:45 2012, Jenne, Update, SUS, Mirrors being installed on active TTs 
Entry  Thu Sep 13 23:27:14 2012, Jenne, Update, General, Pre-close checklist 
Entry  Fri Sep 14 00:56:13 2012, Jenne, Update, General, DRMI aligned 
    Reply  Fri Sep 14 12:51:43 2012, Jenne, Update, SUS, Need risers for active TTs 
    Reply  Fri Sep 14 18:18:33 2012, Jenne, Update, General, In Vac Pictures mmt2.jpg
    Reply  Fri Sep 14 18:28:25 2012, Jenne, Update, General, In Vac Pictures pzt1_light.jpgmmt1.jpgmmt2.jpgpzt2.jpgippo.jpg
Entry  Sat Sep 15 18:29:25 2012, Jenne, Update, General, More photos taken 
    Reply  Mon Sep 17 13:39:32 2012, Jenne, Update, General, More photos taken AllPhotos_Sept2012.pdf
ELOG V3.1.3-