40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 5 of 344  Not logged in ELOG logo
Entry  Fri May 21 11:56:34 2010, Alberto, Update, 40m Upgrading, 40mUpgrade Field Power and RF Power Spectrum at the ports. 38m/38.55m arm length issue. 7x
Entry  Wed May 26 17:10:09 2010, Alberto, Update, 40m Upgrading, RF Generation box Visio-frequencyGenerationBox_wiringSchematic.png
Entry  Wed May 26 22:22:03 2010, Alberto, Configuration, 40m Upgrading, Arm cavity length reflRFpowerVsArmLength_3658m.pngreflRFpowerVsArmLength_3750m.png
Entry  Thu May 27 12:52:02 2010, Alberto, Update, 40m Upgrading, Arm lengths 
Entry  Fri May 28 21:32:32 2010, Alberto, Update, 40m Upgrading, MC alignment 
Entry  Tue Jun 1 06:30:38 2010, Koji, Configuration, 40m Upgrading, effect of the arm length  arm_cavity1.pngarm_cavity2.pngarm_cavity.nb.zip
Entry  Mon Jun 21 18:01:34 2010, Jenne, Update, 40m Upgrading, SRM, PRM hung, magnets inspected 
Entry  Tue Jun 22 20:07:08 2010, Jenne, Update, 40m Upgrading, First attempt at Tip Tilt hanging 2_ECDs_small.jpgMagnetStickingOutFar_small.jpg
    Reply  Fri Jul 30 02:54:04 2010, Koji, Update, 40m Upgrading, More optics installed on the BS table 
Entry  Fri Jul 30 12:46:38 2010, Koji, Configuration, 40m Upgrading, BS chamber status BS_layout_Jul_29_2010.png
Entry  Thu Jan 27 21:10:47 2011, Osamu, Update, 40m Upgrading, Calibrated noise of green 20110127_Calibrated_grrennoise.pdf20110127_Calibrated_grrennoise.jpg20110127_TF_ETMXSUSEXC_to_PZTOUT.pdf
Entry  Wed Oct 19 12:25:58 2011, Suresh, Update, 40m Upgrading, Active Tiptilts from LLO moved to clean shelf along X arm 
Entry  Wed Oct 19 13:45:11 2011, Suresh, Update, 40m Upgrading, Active Tiptilts from LLO moved to clean shelf along X arm 
Entry  Mon Aug 6 11:07:06 2012, Manasa, Update, 40m Upgrading, Optical layout updated 
    Reply  Wed Aug 8 20:51:56 2012, Manasa, Update, 40m Upgrading, Optical layout updated 
    Reply  Fri Aug 17 18:49:55 2012, Manasa, Update, 40m Upgrading, Optical layout updated 
Entry  Tue Aug 21 18:23:58 2012, Manasa, Update, 40m Upgrading, ETMX table layout 
Entry  Thu Sep 6 19:21:58 2012, Manasa, Configuration, 40m Upgrading, Baffle problem bfl.png
    Reply  Fri Sep 7 11:58:12 2012, Manasa, Configuration, 40m Upgrading, Baffle problem bfl.png
    Reply  Fri Sep 7 13:01:53 2012, Manasa, Configuration, 40m Upgrading, Baffle problem Picture1.png
    Reply  Thu Sep 27 19:03:06 2012, Manasa, Update, 40m Upgrading, New ETMX layout - Version 1.0 ETMX_OldNew.png
    Reply  Thu Sep 27 20:05:57 2012, Koji, Update, 40m Upgrading, New ETMX layout - Version 1.0 
    Reply  Fri Sep 28 07:49:30 2012, Steve, Update, 40m Upgrading, New ETMX layout - Version 1.0 
Entry  Tue Nov 13 11:30:54 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser ETMX_sch.png
    Reply  Tue Nov 13 16:18:51 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile 
    Reply  Tue Nov 13 20:13:07 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile 
    Reply  Mon Nov 19 20:03:53 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table ETMX_endtable_New_Model.pdf
    Reply  Mon Nov 19 20:17:53 2012, Jenne, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table 
    Reply  Mon Nov 19 22:42:14 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table 
    Reply  Wed Dec 12 11:04:45 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table ETMX_endtable_New_Model.png
Entry  Wed Dec 12 14:59:49 2012, Manasa, Configuration, 40m Upgrading, New tip-tilts layout in BSC bs.png
    Reply  Thu Jan 10 12:41:06 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : wiki page 
    Reply  Tue Mar 5 00:24:52 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : customized mount 
    Reply  Tue Mar 19 14:21:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade : INVENTORY Endtable_inventory.pdf
    Reply  Tue Mar 19 19:19:50 2013, Jenne, Update, 40m Upgrading, Endtable upgrade : INVENTORY 
    Reply  Wed Mar 20 14:00:21 2013, Steve, Update, 40m Upgrading, Endtable upgrade  
    Reply  Wed Mar 20 15:51:54 2013, Manasa, Update, 40m Upgrading, Endtable upgrade  Endtable_inventory.pdf
    Reply  Thu Mar 21 08:11:53 2013, Steve, Update, 40m Upgrading, ETMY table swap 
    Reply  Thu Mar 21 08:46:46 2013, Manasa, Update, 40m Upgrading, ETMY table swap 
    Reply  Thu Mar 21 17:06:34 2013, Steve, Update, 40m Upgrading, ETMY table is out ETMYtableSupport.jpg
    Reply  Mon Mar 25 18:07:31 2013, Steve, Update, 40m Upgrading, ETMY table is out shimmingEE.jpg
    Reply  Mon Mar 25 18:42:38 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : Timeline Endtable_progress.pdf
    Reply  Tue Mar 26 16:10:31 2013, Jamie, Update, 40m Upgrading, ETMY table leveling end-tabel-leveling.png
    Reply  Tue Mar 26 16:36:24 2013, Steve, Update, 40m Upgrading, table leveling mounts go here  optabSTAND.PDFswivvelMountEE.jpg
    Reply  Fri Mar 29 00:27:06 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : Assembly IMG_0433.JPGIMG_0434.JPG
    Reply  Fri Mar 29 16:30:27 2013, Steve, Update, 40m Upgrading, table leveling mounts go here  
    Reply  Fri Mar 29 16:35:54 2013, Steve, Update, 40m Upgrading, Endtable upgrade 
    Reply  Tue Apr 2 17:23:23 2013, Steve, Update, 40m Upgrading, new ETMY optical table & enclosure in place EEopt1d.jpg
    Reply  Thu Apr 4 17:23:05 2013, Steve, Update, 40m Upgrading, ETMY optical table & enclosure is ready for optics 
    Reply  Fri Apr 5 01:18:34 2013, Manasa, Update, 40m Upgrading, Not a fan of the new plastic box yet 
ELOG V3.1.3-