Entry  Wed Feb 12 19:47:40 2014, Jenne, Update, LSC, Calibrated REFL signals CalibratedUsingPRMdrive.pdf
    Reply  Wed Feb 12 20:30:41 2014, Koji, Update, LSC, Calibrated REFL signals 
Entry  Wed Feb 12 14:05:16 2014, ericq, Update, SUS, PRM Oplev Checked Out ol_spectra.pdf
    Reply  Wed Feb 12 14:59:36 2014, Steve, Update, SUS, clipping removed from PRM oplev PRMoplPointing.jpgPRMoplevReturn.jpg
       Reply  Wed Feb 12 19:37:05 2014, Jenne, Update, SUS, clipping removed from PRM oplev 
Entry  Wed Feb 12 11:57:55 2014, Jenne, Update, LSC, Musings on RFPDs 
Entry  Tue Feb 4 16:43:50 2014, manasa, Update, General, IFO alignment update 
    Reply  Tue Feb 4 17:40:19 2014, manasa, Update, General, Ready for pump down?? 
       Reply  Tue Feb 4 23:01:24 2014, Jenne, Update, General, Ready for pump down?? 
          Reply  Wed Feb 5 15:26:57 2014, manasa, Update, General, Ready for pump down?? 
       Reply  Mon Feb 10 16:02:12 2014, Jenne, Update, General, PRM oplev clipped in vacuum Screenshot-Untitled_Window-1.png
          Reply  Mon Feb 10 16:20:28 2014, Jenne, Update, General, PRM QPD recentered 
             Reply  Mon Feb 10 18:59:25 2014, Jenne, Update, ASC, PRM ASC better, but not great yet 
                Reply  Mon Feb 10 19:56:10 2014, rana, Update, ASC, PRM ASC better, but not great yet 
Entry  Mon Feb 10 18:03:41 2014, jamie, Update, CDS, 12 core c1sus replacement 
Entry  Sat Feb 8 15:14:18 2014, ericq, Update, LSC, PRM Sideband Splitting PRCpeaks.pdf
Entry  Fri Feb 7 17:52:41 2014, Koji, Summary, General, Some cleaning up 
Entry  Thu Feb 6 16:41:31 2014, ericq, Update, General, In-Vac Alignment 
    Reply  Fri Feb 7 12:43:12 2014, ericq, Update, General, In-Vac Alignment 
       Reply  Fri Feb 7 13:00:52 2014, Jenne, Update, General, In-Vac Alignment 
          Reply  Fri Feb 7 13:30:22 2014, Gabriele, Update, General, In-Vac Alignment 
          Reply  Fri Feb 7 13:30:25 2014, ericq, Update, General, In-Vac Alignment 
Entry  Wed Feb 5 20:41:57 2014, Den, Update, LSC, calibrated spetra from OAF test oaf_cal.pdf
Entry  Wed Feb 5 09:28:32 2014, Steve, Update, SUS, ETMY damping restored 
Entry  Tue Feb 4 00:42:18 2014, Koji, Update, General, X arm aligned for IR/GR 
Entry  Mon Feb 3 23:31:33 2014, Manasa, Update, General, Alignment update / Y arm locked 
Entry  Mon Feb 3 10:17:14 2014, Steve, Update, PEM, dusty surfaces AP-ISCT.jpgBSC-rim.jpgITMX-ISCT.jpg12daysAtm.png
Entry  Fri Jan 31 19:29:36 2014, Gabriele, Summary, LSC, PRC and SRC lengths map_jan31st.pdfsurvey_v3.zip
Entry  Fri Jan 31 18:41:25 2014, manasa, Update, General, IFO alignment update 
Entry  Thu Jan 30 19:00:25 2014, Gabriele, Summary, LSC, PRC length changed map_jan30.pdfsurvey_v3_jan30.m
Entry  Wed Jan 29 21:01:03 2014, Gabriele, Summary, LSC, PRC length measurement analysis map.pdfscript.zip
Entry  Wed Jan 29 16:36:37 2014, Koji, Summary, General, High power beam blasting of the aLIGO RFPD  
Entry  Tue Jan 28 23:32:12 2014, Koji, Update, General, X/Y arm locked with the IR beam good_alignment.png
Entry  Thu Jan 23 23:10:19 2014, ericq , Update, General, Vent so far 
    Reply  Mon Jan 27 21:36:35 2014, ericq , Update, General, Vent so far 
       Reply  Tue Jan 28 22:24:46 2014, ericq , Update, General, Further Alignment 
Entry  Mon Jan 27 17:49:46 2014, rana, HowTo, Computer Scripts / Programs, sendmail started on nodus: fixing SwiftMail on Dokuwiki 
Entry  Mon Jan 27 12:26:00 2014, Koji, Update, IOO, IOO Slow Actuator Servo threshold changed 
Entry  Fri Jan 24 12:44:25 2014, Gabriele, HowTo, LSC, Procedure to measure PRC length 8x
    Reply  Fri Jan 24 13:10:12 2014, Jamie, HowTo, LSC, Procedure to measure PRC length path.pdf
       Reply  Sat Jan 25 21:09:16 2014, gabriele, HowTo, LSC, Procedure to measure PRC length 
Entry  Wed Jan 22 20:00:41 2014, Jenne, Update, General, VENT GO! IFOstatus_lowPower_preVent.png
Entry  Tue Jan 21 19:41:59 2014, Jenne, Update, Electronics, RF distribution box power button fail 
    Reply  Wed Jan 22 16:36:45 2014, ericq, Update, Electronics, RF distribution box power button fail 
Entry  Fri Sep 4 16:09:26 2009, josephb, Summary, VAC, Rebooted RGA computer and reset RGA settings 
    Reply  Tue Jan 21 17:26:59 2014, Jenne, Summary, VAC, Rebooted RGA computer and reset RGA settings 
       Reply  Wed Jan 22 15:24:11 2014, Steve, Summary, VAC, Rga scan after reboot Rgascan169dwarmingup.pngBlankMedmMustBeFixed.png
Entry  Wed Jan 22 09:05:42 2014, Gabriele, Configuration, LSC, REFL11 back 
Entry  Fri Jan 17 11:44:25 2014, Gabriele, Summary, LSC, More length measurements, more confusion results_as11.pdfresults_as55.pdf
Entry  Thu Jan 16 21:38:13 2014, ericq, Update, LSC, Repeat of PRC length measurement 
Entry  Wed Jan 15 13:05:30 2014, Jenne, Update, PEM, 4.4 EQ in Fontana, CA 
    Reply  Thu Jan 16 08:19:29 2014, Steve, Update, PEM, 4.4 and 3.8M local earth quakes local4.4eq.pnglocal3.8eq.png
Entry  Wed Jan 15 18:42:57 2014, Jenne, Update, ASC, POP ASC QPD offline for a few hours this afternoon 
Entry  Wed Jan 15 18:18:15 2014, Gabriele, Summary, LSC, PRC length measurement analysis experimental_data_as11.pdfexperimental_data_as55.pdfsimulation_phase_difference.pdf
Entry  Tue Jan 14 19:10:51 2014, Gabriele, Summary, LSC, PRC length measurement 
Entry  Tue Jan 14 19:05:48 2014, Gabriele, Summary, LSC, PRMI locked on sideband 
Entry  Tue Jan 14 10:34:57 2014, Steve, Update, PSL, green transmission measurment greenPickUp.jpg
Entry  Mon Sep 30 13:02:51 2013, Masayuki,Manasa, Update, IOO, PMC and MC alignment 
    Reply  Thu Oct 3 01:24:31 2013, Jenne, Rana, Update, IOO, PMC  PMCR_1064822387.bmppmc80.png
       Reply  Sun Oct 6 22:52:09 2013, Jenne, Rana, Update, IOO, input beam to PMC aligned again pmcr.png
          Reply  Mon Oct 14 17:51:40 2013, Jenne, Update, IOO, input beam to PMC drifted again 
             Reply  Mon Oct 21 13:15:52 2013, Koji, Update, IOO, PMC aligned 
             Reply  Fri Oct 25 10:45:16 2013, Steve, Update, PSL, laser drift monitor set up laserDriftMon.jpgPMCT_120d.pngPMCT_1000d.png
                Reply  Fri Oct 25 19:56:58 2013, rana, Update, PSL, laser drift monitor set up PMC-IRSISSS.pngPA250052.JPGPA280044.JPG
                Reply  Fri Jan 10 15:33:02 2014, Steve, Update, PSL, laser drift monitor set up idea 2daysDrift.png
                   Reply  Mon Jan 13 11:08:48 2014, Steve, Update, PSL, 3 good days of IOO pointing 3gdPSLpointing.png
                   Reply  Tue Jan 14 10:12:12 2014, Steve, Update, PSL, laser drift monitor set up idea bad4thday.png
Entry  Mon Jan 13 19:31:04 2014, Gabriele, Summary, LSC, PRMI locking 
Entry  Wed Jan 8 13:01:48 2014, Gabriele, Summary, LSC, Effect of PRC length mismatch on error signals REFL_vs_PRClength.pdf
    Reply  Wed Jan 8 16:08:52 2014, ericq, Summary, LSC, Effect of PRC length mismatch on error signals phaseVlength.pdf
       Reply  Wed Jan 8 19:05:30 2014, Gabriele, Summary, LSC, Effect of PRC length mismatch on error signals as11.pngas55.png
          Reply  Thu Jan 9 17:58:31 2014, ericq, Summary, LSC, Effect of PRC length mismatch on error signals 
             Reply  Fri Jan 10 15:31:07 2014, rana, Summary, LSC, Effect of PRC length mismatch on error signals 
                Reply  Sun Jan 12 09:57:24 2014, Gabriele, Summary, LSC, Effect of PRC length mismatch on error signals 
Entry  Tue Jan 7 23:24:41 2014, Jenne, Update, General, IFO plan, list o' things to do 
    Reply  Wed Jan 8 13:46:39 2014, Jenne, Update, General, IFO plan, PRM baffle PRMcage_6Sept2012.JPG
    Reply  Wed Jan 8 17:53:26 2014, manasa, Update, General, IFO plan, IPANG telescope IPANG_layout.pngIPANG.png
       Reply  Thu Jan 9 17:21:45 2014, rana, Update, General, IFO plan, IPANG telescope 
    Reply  Thu Jan 9 10:34:58 2014, Steve, Update, PSL, PSL pointing changes in pitch Lfnfdnc.png24hPSLpointing.png
       Reply  Fri Jan 10 10:28:03 2014, Steve, Update, PSL, PSL pointing changes  clamped.png
Entry  Tue Jan 7 23:53:35 2014, Jamie, Update, CDS, daqd can't connect to c1vac1, c1vac2 
Entry  Mon Jan 6 18:32:17 2014, RANA, Update, IOO, MC1/3 kicked this morning at 8:30 kicked.png
    Reply  Mon Jan 6 20:52:09 2014, Jenne, Update, IOO, MC1/3 kicked this morning at 8:30 
    Reply  Tue Jan 7 10:44:13 2014, Steve, Update, IOO, MC drift 2dTrend.pngdriftNotKick.png
       Reply  Tue Jan 7 11:11:36 2014, rana, Update, IOO, MC drift 
    Reply  Tue Jan 7 16:41:08 2014, manasa, Update, IOO, WFS moving MC suspensions 2dayMCtrend.pngWFSvsMCsuspensions.png
       Reply  Tue Jan 7 17:16:04 2014, manasa, Update, IOO, MC aligned MCspots.png
          Reply  Tue Jan 7 20:57:41 2014, Jenne, Update, IOO, MC aligned 
             Reply  Tue Jan 7 23:09:10 2014, manasa, Update, IOO, MC aligned WFSdrift.png
Entry  Tue Jan 7 21:00:02 2014, Jenne, Update, IOO, IP POS, IP ANG aligned 
Entry  Wed Dec 18 11:37:12 2013, Jenne, Update, LSC, POP22 and POP110 demod phases 
    Reply  Wed Dec 18 18:45:39 2013, Jenne, Update, LSC, REFL 165 demod phases 
       Reply  Mon Jan 6 22:11:46 2014, Jenne, Update, LSC, PRCL sideband locking still not so happy 
Entry  Fri Jan 3 15:19:39 2014, rana, Summary, PSL, PSL pointing monitoring PSL_pointing_2013.png
    Reply  Fri Jan 3 18:21:45 2014, rana, Summary, PSL, PSL pointing monitoring 
       Reply  Mon Jan 6 16:30:31 2014, Jenne, Summary, PSL, PSL pointing monitoring MCspots_6Jan2014.png
Entry  Wed Jan 1 15:01:29 2014, Koji, Summary, General, IFO recovery 
Entry  Sat Dec 21 01:54:04 2013, Koji, Configuration, LSC, LSC Whitening for the DCPDs/CM servo replaced 
Entry  Fri Dec 20 00:16:39 2013, Koji, Summary, CDS, RCG parsing bug? Bit2Word1.pngBit2Word2.png
    Reply  Fri Dec 20 11:40:13 2013, Jamie, Summary, CDS, RCG parsing bug? 
    Reply  Fri Dec 20 18:00:02 2013, Koji, Summary, CDS, RCG parsing bug? Screenshot-c1lsc-LSC.png
Entry  Thu Dec 19 19:45:12 2013, ericq, Update, Green Locking, X-Arm Green PDH Loop Stuff xarmPDHtfs.pdfxarmCLG.pdflayout.pdf
Entry  Wed Dec 18 17:28:50 2013, Gabriele, Summary, LSC, Estimate of the PRC length error data_fit2.pngdata_kick.pngpop110_vs_dL.pngpop110_vs_dL.png
    Reply  Thu Dec 19 12:51:57 2013, Jenne, Summary, LSC, Estimate of the sign of the PRC length error DesignLength.pngPlus5cm.pngMinus5cm.png
       Reply  Thu Dec 19 18:33:25 2013, Gabriele, Summary, LSC, Estimate of the sign of the PRC length error 
Entry  Thu Dec 19 14:40:42 2013, Koji, Update, CDS, RFM Time over mitigation for c1mcs 