40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 57 of 175  Not logged in ELOG logo
Entry  Thu Nov 18 16:42:29 2010, Joonho Lee, Configuration, Electronics, Quad Video for PMCT, RCT, RCR fixed. 
Entry  Thu Nov 18 17:42:20 2010, Joonho Lee, Summary, Electronics, CCD cables. Upgrade_plan_(Nov18).pdf
Entry  Thu Nov 18 23:45:18 2010, rana, Configuration, PSL, PMC Refl Cam mc2_simulink.png
Entry  Fri Nov 19 04:23:12 2010, Suresh, Update, SUS, Cleaned and stuck magnets to dumbbells 7x
Entry  Fri Nov 19 12:53:50 2010, josephb, Update, CDS, Testpoints on c1iscex now working 
Entry  Fri Nov 19 03:43:33 2010, Kevin, Update, Electronics, REFL55 Characterizations 
    Reply  Fri Nov 19 15:51:50 2010, Koji, Update, Electronics, REFL55 Characterizations 
Entry  Fri Nov 19 16:13:09 2010, Jenne, Update, SUS, ETMU05: magnets glued to optic StatusTable.png
Entry  Fri Nov 19 18:20:59 2010, Suresh, Update, SUS, Glue dynamics! Too_much_glue_1.jpgToo_much_glue_2.jpgToo_much_glue_2.jpgToo_much_glue_3.jpg
Entry  Sat Nov 20 01:58:56 2010, yuta, HowTo, CDS, editting RT models and MEDM screens 
Entry  Sat Nov 20 02:25:30 2010, yuta, Update, CDS, 2 LOCKINs for suspension models LockinRoll.png
Entry  Sat Oct 30 05:27:53 2010, yuta, Summary, CDS, CDS time delay measurement delaysetup.pngCDSdelay.png
    Reply  Sat Oct 30 14:35:43 2010, Koji, Summary, CDS, CDS time delay measurement CDS_system_investigation_090323.pdf
       Reply  Mon Nov 1 15:47:15 2010, yuta, Summary, CDS, CDS time delay measurement downupsampling.pngCDSdelay2.png
          Reply  Mon Nov 1 16:43:24 2010, Koji, Summary, CDS, CDS time delay measurement 
             Reply  Sat Nov 20 03:37:11 2010, yuta, Summary, CDS, CDS time delay measurement - the ripple c1tst16Kdelay.png
Entry  Fri Nov 19 17:12:22 2010, yuta, Update, CDS, ETMX damped, but with weird TO_COIL matrix ETMXdamping.png
    Reply  Mon Nov 22 12:00:18 2010, josephb, Update, CDS, Updated Computer Restart Procedures for FB 
Entry  Mon Nov 22 13:16:52 2010, josephb, Summary, CDS, CDS Plan for the week 
Entry  Mon Nov 22 16:16:04 2010, josephb, Update, CDS, Did an SVN update on the CDS code 
Entry  Mon Nov 22 17:48:11 2010, josephb, Update, CDS, c1iscex is not seeing its Binary Output card 
Entry  Mon Nov 22 18:39:53 2010, Jenne, Update, SUS, ETMU07: magnets glued to optic. ETMU05: magnets removed StatusTable.png
Entry  Mon Nov 22 20:01:56 2010, kiwamu, Configuration, Computers, GPIB box : took it out from HP3563A and connect it to AG4395A 
Entry  Tue Nov 23 01:27:33 2010, Kevin, Update, Electronics, POX Characterizations 
Entry  Mon Nov 22 20:31:58 2010, kiwamu, Update, Green Locking, searching for unknown loss in green PD path RFPDresponse.png
    Reply  Tue Nov 23 01:45:47 2010, kiwamu, Update, Green Locking, noise curve of wideband RFPD noise_RFPD.png
Entry  Tue Nov 23 10:53:20 2010, josephb, Update, CDS, timing issues 
Entry  Tue Nov 23 11:20:30 2010, josephb, Update, CDS, Cleaning up old target directory 
Entry  Tue Nov 23 11:32:03 2010, Joonho, Summary, Electronics, RF distribution unit. Frequency_Distribution_Unit_Arrangement.jpg
Entry  Tue Nov 23 14:52:28 2010, Jenne, Update, PEM, PEM Model Started 
Entry  Tue Nov 23 18:08:28 2010, Jenne, Update, SUS, ETMU07: Balanced, standoff glued. ETMU05: Magnets glued to optic StatusTable.png
Entry  Tue Nov 23 22:45:59 2010, kiwamu, Update, Computers, Altium 
Entry  Tue Nov 23 16:55:14 2010, josephb, Update, CDS, Updated apps 
    Reply  Tue Nov 23 23:52:49 2010, rana, Update, CDS, Updated apps 
Entry  Wed Nov 24 17:57:24 2010, Jenne, Update, SUS, ETMU07: Baking. ETMU05: Needs side magnets reglued StatusTable.png
Entry  Wed Nov 24 18:11:26 2010, Jenne, Update, PEM, Some progress on getting PEM channels 
Entry  Tue Nov 23 23:13:40 2010, kiwamu, Summary, CDS, plan: we will install C1LSC 
    Reply  Thu Nov 25 02:49:39 2010, kiwamu, Update, CDS, installation of C1LSC: still going on DSC_2723_ss.jpgDSC_2724_ss.jpgDSC_2727_ss.jpg
Entry  Fri Nov 26 16:37:29 2010, kiwamu, Update, Photos, pictures on PIcasa DSC_2657_ss.jpg
Entry  Mon Nov 29 17:45:28 2010, Zach, Update, elog, restarted elog 
Entry  Mon Nov 29 18:05:17 2010, Leo Singer, Configuration, Computers, installed graphviz on Rosalba 
Entry  Mon Nov 29 22:50:07 2010, Suresh, Update, SUS, ETMU05 Side Magnets glued back  
Entry  Tue Nov 30 11:44:36 2010, Zach, Update, elog, elog restarted -- SCRIPT adapted for 2.8.0 
Entry  Tue Nov 30 12:10:44 2010, josephb, Update, elog, Elog restarted again 
Entry  Tue Nov 30 12:25:08 2010, josephb, Update, CDS, LSC computer to chassis cable dead 
Entry  Tue Nov 23 10:48:31 2010, Koji, Update, IOO, the plan of the day 
    Reply  Tue Nov 23 22:01:49 2010, kiwamu, Update, IOO, immigration plan for in-vac PZT mirrors  Untitled.png
       Reply  Mon Nov 29 11:51:41 2010, kiwamu, Update, IOO, swaped in-vac PZT mirrors  
          Reply  Tue Nov 30 04:22:52 2010, kiwamu, Update, IOO, swaped in-vac PZT mirrors  
             Reply  Tue Nov 30 12:33:27 2010, kiwamu, Summary, IOO, cabling of in-vac PZT mirrors  
Entry  Tue Nov 30 12:45:36 2010, kiwamu, Update, SUS, found a loose connection : ITMX damping 
Entry  Tue Nov 30 14:21:21 2010, Zach, Update, elog, Script unnecessary 
Entry  Tue Nov 30 16:02:18 2010, josephb, Update, CDS, status 
Entry  Tue Nov 30 18:15:52 2010, Jenne, Update, SUS, ETMX ready to be installed. ETMY ready for winching StatusTable.png
Entry  Tue Nov 30 19:35:09 2010, Zach, Update, elog, restarted again 
Entry  Wed Dec 1 12:02:49 2010, josephb, alex, Update, CDS, Rebuilding frame builder with latest code 
Entry  Wed Dec 1 13:41:21 2010, josephb, alex, rolf, Update, CDS, Timing is back 
Entry  Thu Dec 2 00:34:32 2010, rana, HowTo, LSC, How Does Cavity Locking Work (answered by Nikon) 
Entry  Wed Dec 1 02:39:00 2010, Suresh, Update, SUS, Installation of ETMU07 as ETMX 
    Reply  Thu Dec 2 02:50:12 2010, kiwamu, Update, SUS, ETMX installed 
Entry  Fri Dec 3 05:21:11 2010, kiwamu, Update, Green Locking, locked the laser to the cavity 
Entry  Fri Dec 3 14:34:23 2010, rana, Update, CDS, fooling around in the FB rack 
Entry  Fri Dec 3 15:37:10 2010, josephb, Update, CDS, fb, front ends fixed - tested RFM between c1ioo and c1iscex 
Entry  Fri Dec 3 15:56:50 2010, Joonho, Jenne., Summary, Electronics, RF distribution unit plan RFsystem_plant_VISIO2.png
ELOG V3.1.3-