Thu Nov 18 16:42:29 2010, Joonho Lee, Configuration, Electronics, Quad Video for PMCT, RCT, RCR fixed.
|
Thu Nov 18 17:42:20 2010, Joonho Lee, Summary, Electronics, CCD cables.
|
Thu Nov 18 23:45:18 2010, rana, Configuration, PSL, PMC Refl Cam
|
Fri Nov 19 04:23:12 2010, Suresh, Update, SUS, Cleaned and stuck magnets to dumbbells 7x
|
Fri Nov 19 12:53:50 2010, josephb, Update, CDS, Testpoints on c1iscex now working
|
Fri Nov 19 03:43:33 2010, Kevin, Update, Electronics, REFL55 Characterizations
|
Fri Nov 19 15:51:50 2010, Koji, Update, Electronics, REFL55 Characterizations
|
Fri Nov 19 16:13:09 2010, Jenne, Update, SUS, ETMU05: magnets glued to optic
|
Fri Nov 19 18:20:59 2010, Suresh, Update, SUS, Glue dynamics!   
|
Sat Nov 20 01:58:56 2010, yuta, HowTo, CDS, editting RT models and MEDM screens
|
Sat Nov 20 02:25:30 2010, yuta, Update, CDS, 2 LOCKINs for suspension models
|
Sat Oct 30 05:27:53 2010, yuta, Summary, CDS, CDS time delay measurement 
|
Sat Oct 30 14:35:43 2010, Koji, Summary, CDS, CDS time delay measurement
|
Mon Nov 1 15:47:15 2010, yuta, Summary, CDS, CDS time delay measurement 
|
Mon Nov 1 16:43:24 2010, Koji, Summary, CDS, CDS time delay measurement
|
Sat Nov 20 03:37:11 2010, yuta, Summary, CDS, CDS time delay measurement - the ripple
|
Fri Nov 19 17:12:22 2010, yuta, Update, CDS, ETMX damped, but with weird TO_COIL matrix
|
Mon Nov 22 12:00:18 2010, josephb, Update, CDS, Updated Computer Restart Procedures for FB
|
Mon Nov 22 13:16:52 2010, josephb, Summary, CDS, CDS Plan for the week
|
Mon Nov 22 16:16:04 2010, josephb, Update, CDS, Did an SVN update on the CDS code
|
Mon Nov 22 17:48:11 2010, josephb, Update, CDS, c1iscex is not seeing its Binary Output card
|
Mon Nov 22 18:39:53 2010, Jenne, Update, SUS, ETMU07: magnets glued to optic. ETMU05: magnets removed
|
Mon Nov 22 20:01:56 2010, kiwamu, Configuration, Computers, GPIB box : took it out from HP3563A and connect it to AG4395A
|
Tue Nov 23 01:27:33 2010, Kevin, Update, Electronics, POX Characterizations
|
Mon Nov 22 20:31:58 2010, kiwamu, Update, Green Locking, searching for unknown loss in green PD path
|
Tue Nov 23 01:45:47 2010, kiwamu, Update, Green Locking, noise curve of wideband RFPD
|
Tue Nov 23 10:53:20 2010, josephb, Update, CDS, timing issues
|
Tue Nov 23 11:20:30 2010, josephb, Update, CDS, Cleaning up old target directory
|
Tue Nov 23 11:32:03 2010, Joonho, Summary, Electronics, RF distribution unit.
|
Tue Nov 23 14:52:28 2010, Jenne, Update, PEM, PEM Model Started
|
Tue Nov 23 18:08:28 2010, Jenne, Update, SUS, ETMU07: Balanced, standoff glued. ETMU05: Magnets glued to optic
|
Tue Nov 23 22:45:59 2010, kiwamu, Update, Computers, Altium
|
Tue Nov 23 16:55:14 2010, josephb, Update, CDS, Updated apps
|
Tue Nov 23 23:52:49 2010, rana, Update, CDS, Updated apps
|
Wed Nov 24 17:57:24 2010, Jenne, Update, SUS, ETMU07: Baking. ETMU05: Needs side magnets reglued
|
Wed Nov 24 18:11:26 2010, Jenne, Update, PEM, Some progress on getting PEM channels
|
Tue Nov 23 23:13:40 2010, kiwamu, Summary, CDS, plan: we will install C1LSC
|
Thu Nov 25 02:49:39 2010, kiwamu, Update, CDS, installation of C1LSC: still going on  
|
Fri Nov 26 16:37:29 2010, kiwamu, Update, Photos, pictures on PIcasa
|
Mon Nov 29 17:45:28 2010, Zach, Update, elog, restarted elog
|
Mon Nov 29 18:05:17 2010, Leo Singer, Configuration, Computers, installed graphviz on Rosalba
|
Mon Nov 29 22:50:07 2010, Suresh, Update, SUS, ETMU05 Side Magnets glued back
|
Tue Nov 30 11:44:36 2010, Zach, Update, elog, elog restarted -- SCRIPT adapted for 2.8.0
|
Tue Nov 30 12:10:44 2010, josephb, Update, elog, Elog restarted again
|
Tue Nov 30 12:25:08 2010, josephb, Update, CDS, LSC computer to chassis cable dead
|
Tue Nov 23 10:48:31 2010, Koji, Update, IOO, the plan of the day
|
Tue Nov 23 22:01:49 2010, kiwamu, Update, IOO, immigration plan for in-vac PZT mirrors
|
Mon Nov 29 11:51:41 2010, kiwamu, Update, IOO, swaped in-vac PZT mirrors
|
Tue Nov 30 04:22:52 2010, kiwamu, Update, IOO, swaped in-vac PZT mirrors
|
Tue Nov 30 12:33:27 2010, kiwamu, Summary, IOO, cabling of in-vac PZT mirrors
|
Tue Nov 30 12:45:36 2010, kiwamu, Update, SUS, found a loose connection : ITMX damping
|
Tue Nov 30 14:21:21 2010, Zach, Update, elog, Script unnecessary
|
Tue Nov 30 16:02:18 2010, josephb, Update, CDS, status
|
Tue Nov 30 18:15:52 2010, Jenne, Update, SUS, ETMX ready to be installed. ETMY ready for winching
|
Tue Nov 30 19:35:09 2010, Zach, Update, elog, restarted again
|
Wed Dec 1 12:02:49 2010, josephb, alex, Update, CDS, Rebuilding frame builder with latest code
|
Wed Dec 1 13:41:21 2010, josephb, alex, rolf, Update, CDS, Timing is back
|
Thu Dec 2 00:34:32 2010, rana, HowTo, LSC, How Does Cavity Locking Work (answered by Nikon)
|
Wed Dec 1 02:39:00 2010, Suresh, Update, SUS, Installation of ETMU07 as ETMX
|
Thu Dec 2 02:50:12 2010, kiwamu, Update, SUS, ETMX installed
|
Fri Dec 3 05:21:11 2010, kiwamu, Update, Green Locking, locked the laser to the cavity
|
Fri Dec 3 14:34:23 2010, rana, Update, CDS, fooling around in the FB rack
|
Fri Dec 3 15:37:10 2010, josephb, Update, CDS, fb, front ends fixed - tested RFM between c1ioo and c1iscex
|
Fri Dec 3 15:56:50 2010, Joonho, Jenne., Summary, Electronics, RF distribution unit plan
|
|