40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 56 of 354  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  6397   Fri Mar 9 20:44:24 2012 Jim LoughUpdateCDSDAQ restart with new ini fileDAQ reload/restart
was performed at about 1315 PST today. The
previous ini file was backed up as c1pem20120309.ini
  
  6404   Tue Mar 13 13:28:31 2012 Ryan FisherUpdateCDSDAQ restart with new ini fileExtra note:  This was the ini file that was
edited:
/cvs/cds/rtcds/caltech/c1/chans/daq/C1PEM.ini
  
  16793   Thu Apr 21 10:35:23 2022 KojiUpdateCDSDAQ seemed downYesterday, when I worked on the damping
servo, I found that any of the daqvtools
(ndscope, dtt, dataviewer,...) is not available. 
  
  4171   Thu Jan 20 00:39:22 2011 kiwamuHowToCDSDAQ setup : another trickHere
is another trick for the DAQ setup when you
add a DAQ channel associated with a new front
  
  16811   Mon Apr 25 17:24:06 2022 AnchalUpdateCDSDAQ still downI investigated this issue today. At first,
it seemed that only new suspension testpoints
are inaccessible. I was able to use diaggui
  
  3631   Thu Sep 30 21:55:31 2010 ranaUpdateCDSDAQ sys updateIts pretty exciting to see that Joe got
Alex to actually use the ELOG. Its a proof
that even rare events occur if you are patient
 Untitled.png 
  3629   Thu Sep 30 17:11:01 2010 alex iUpdateCDSDAQ system updateThe frame builder is timed from the Symmetricom
GPS card now, which is getting the IRIGB
timecode from the freq. distribution amplifier
  
  3247   Mon Jul 19 21:47:36 2010 ranaSummaryDAQDAQ timing testSince we now have a good measurement of
the phase noise of the Rb clock
Marconi locked to the Rb clock, I wanted
  
  3299   Tue Jul 27 16:03:36 2010 ranaSummaryDAQDAQ timing test

    
        
 Untitled.png 
  16853   Sat May 14 08:36:03 2022 ChrisUpdateDAQDAQ troubleshootingI heard a rumor about a DAQ problem at
the 40m.

To investigate, I tried retrieving
  
  16854   Mon May 16 10:49:01 2022 AnchalUpdateDAQDAQ troubleshooting[Anchal, Paco, JC]

Thanks Chris for the fix. We are
able to access the testpoints now but we
  
  16855   Mon May 16 12:59:27 2022 ChrisUpdateDAQDAQ troubleshootingIt looks like the RFM problem started a
little after 2am on Saturday morning (attachment
1). It’s subsequent to what I did,
 timeseries.pngerr.png 
  3057   Tue Jun 8 20:52:25 2010 josephbUpdatePEMDAQ up (for the moment)As a test, I did a remote reboot of both
Megatron and c1iscex, to make sure there
was no code running that might interfere
  
  9422   Fri Nov 22 09:54:22 2013 SteveUpdateCDSDAQ?Jamie, I think the computers know that
you are away. c1lsc keeps going down.
The short time plots are correct.
 comp8d.png 
  9423   Fri Nov 22 14:21:43 2013 JamieUpdateComputer Scripts / ProgramsDAQ?

    

       
            
  
  1737   Mon Jul 13 15:14:57 2009 AlbertoUpdateComputersDAQAWGToday Alex came over, performed his magic
rituals on the DAQAWG computer and fixed
it. Now it's up and running again.
  
  1752   Wed Jul 15 17:18:24 2009 JenneDAQComputersDAQAWG gone, now backYet again, the DAQAWG flipped out for an
unknowable reason.  In order of restart
activities listed on the Wiki, I keyed the
  
  12152   Tue Jun 7 11:12:47 2016 jamieUpdateCDSDAQD UPGRADE WORK UNDERWAYI
am re-starting work on the daqd upgrade again
now.  Expect the daqd
  
  12155   Tue Jun 7 20:49:50 2016 jamieUpdateCDSDAQD work ongoingSummary: new daqd code
running overnight test on fb1.  Stability
issues persist.
  
  12156   Wed Jun 8 08:34:55 2016 jamieUpdateCDSDAQD work ongoing38 restarts overnight.  Problem definitely
not fixed.  I'll be reverting back
to old daqd and fb this morning.  Then
  
  10481   Wed Sep 10 02:26:20 2014 JenneUpdateLSCDARM -> AS55 optickle Q has pointed out that we expect
a sign flip in the AS55 signal for DARM as
we reduce the CARM offset in the PRFPMI case.
 AS55Q_vs_DARM_PRFPMI_0pm300pm.pngAS55I_vs_DARM_PRFPMI_0pm300pm.pngAS55Q_vs_DARM_DRFPMI_0pm300pm.pngAS55I_vs_DARM_DRFPMI_0pm300pm.pngAS55Q_vs_DARM_DRFPMI_0pm1000pm.png 
  1549   Tue May 5 14:02:16 2009 robUpdateLSCDARM DC response varies with DARM offsetNote the effect of quadrature rotation
for small offsets.
 DARM_DARM_AS_DC_2.pngDARM_DARM_AS_DC_3.pngDARM_DARM_AS_DC_2.pdfDARM_DARM_AS_DC_3.pdf 
  13799   Sun Apr 29 22:53:06 2018 gautamUpdateGeneralDARM actuation estimateMotivation:

We'd like to know how much
actuation is required on the ETMs to lock
 darmEst.pdf 
  13805   Tue May 1 19:37:50 2018 gautamUpdateGeneralDARM actuation estimateHere is an updated plot - the main difference
is that I have added a trace that is the
frequency domain wiener filter subtraction
 darmEst.pdfdarmEst_time.pdf 
  13822   Mon May 7 16:23:06 2018 gautamUpdateGeneralDARM actuation estimateSummary:

Using the Wiener Filter estimate
of the DARM disturbance we will have to cancel,
 darmProj.pdf37.pngMCalign_20180507.png 
  1514   Fri Apr 24 03:57:30 2009 YoichiUpdateLockingDARM demod phaseTonight, I was able to go up to arm power
= 40 by tweaking the DARM demodulation phase.
I think the DARM loop became unstable because
  
  1515   Fri Apr 24 04:38:49 2009 YoichiUpdateLockingDARM demod phase[quote]Tonight, I was able to go up to arm
power = 40 by tweaking the DARM demodulation
phase.
  
  1516   Fri Apr 24 11:34:32 2009 robUpdateLockingDARM demod phase[quote][quote]Tonight, I was able to go up
to arm power = 40 by tweaking the DARM demodulation
phase.
 darm_phase_rotate.png 
  1519   Fri Apr 24 17:26:57 2009 YoichiUpdateLockingDARM demod phase[quote]
There's actually code in place in the LSC
to dynamically adjust the demod phase for
  
  10621   Fri Oct 17 03:05:00 2014 ericqUpdateLSCDARM locked on DC Transmission difference I've
been able to repeatedly get off of ALS and
onto (TRY-TRX)/(TRY+TRX). Nevertheless, lock
 TRdifflock.pngOct17lock.pdf 
  10737   Wed Nov 26 22:24:28 2014 JenneUpdateLSCDARM loop improved, other work[Jenne, Koji]
We have done several things this
evening, which have incrementally helped
 8x 
  15350   Tue May 26 02:37:19 2020 gautamUpdateLSCDARM loop measurement and fittingSummary:

In order to estimate the free-running
DARM displacement noise, I measured the DARM
 DARM_TF.pdfDARM_TF_breakdown.pdf 
  10864   Wed Jan 7 09:44:33 2015 ericqUpdateLSCDARM phase budgetAs Jenne mentioned, I created a model of
the DARM OLG to see why we have so little
phase margin. However, it turns out I
 DarmPhaseBudget.pdfDarmOLGresidual.pdf2015-01-DARMphase.zip 
  10868   Wed Jan 7 13:39:42 2015 ChrisUpdateLSCDARM phase budgetI think the dolphin and RFM transit times
are double-counted in this budget. As I understand
it, all IPC transit times are already built
  
  1575   Tue May 12 01:11:55 2009 YoichiUpdateLSCDARM response (DC Readout)I measured the DARM response with DC readout.

This time, I first measured the open loop
 SUS_Resp.pngDARM_Resp.png 
  11606   Wed Sep 16 15:04:33 2015 ericqSummaryLSCDC PD Whitening Board Fixed


  
  10872   Wed Jan 7 15:53:01 2015 JenneUpdateLSCDC PD analog settings exposedI have added another block to the LSC screen
(and made the corresponding sub-screen) to
expose the analog settings for the DC photodiodes. 
  
  12710   Fri Jan 13 08:54:32 2017 JohannesUpdateGeneralDC PD installedI installed a DC PD (Thorlabs PDA 520)
in the beam path to AS55. I placed a 2"
 ASDCPD_up.jpgASDCPD_down.jpgscrambled_osci.jpg 
  16150   Fri May 21 00:15:33 2021 KojiUpdateElectronicsDC Power Strip delivered / storedDC Power Strip Assemblies delivered and
stored behind the Y arm tube (Attachment
1)
 9x 
  2056   Tue Oct 6 01:41:20 2009 robUpdateLockingDC Readout Lock acquisition working well tonight. 
Was able to engage CM boost (not superboost)
with bandwidth of ~10kHz.  Also succeeded
  
  1544   Tue May 5 05:16:12 2009 YoichiUpdateLockingDC Readout and DARM responseTonight, I was able to switch the DARM to
DC readout a couple of times.
But the lock was not as stable as the RF
 DARM-TF.png 
  1545   Tue May 5 08:26:56 2009 robUpdateLockingDC Readout and DARM response[quote]Tonight, I was able to switch the DARM
to DC readout a couple of times.
But the lock was not as stable as the RF
  
  15572   Tue Sep 15 17:04:43 2020 gautamUpdateElectronicsDC adaptors deliveredThese were delivered to the 40m today and
are on Rana's desk

  
  14776   Fri Jul 19 12:50:10 2019 gautamUpdateSUSDC bias actuation options for SOSRana and I talked about some (genius)
options for the large range DC bias actuation
 heaterPitch_2018.pdfScreenshot_from_2019-07-19_16-39-21.png 
  12708   Thu Jan 12 17:31:51 2017 gautamUpdateCDSDC errorsThe IFO is more or less back to an operational
state. Some details:


The IMC mirror excess motion
 DCerror.png 
  12715   Fri Jan 13 21:41:23 2017 KojiUpdateCDSDC errorsI think I fixed the DC error issue

1. I added the leap second
(leapsecond ?) entry for 2016/12/31, 23:60:00
  
  15735   Tue Dec 15 12:38:41 2020 gautamUpdateElectronicsDC power stripI installed a DC power strip (24 V
variant, 12 outlets available) on the NW
upright of the 1X1 rack. This is for the
  
  15699   Thu Dec 3 10:46:39 2020 gautamUpdateElectronicsDC power strip requirementsSince we will have several new 1U / 2U
aLIGO style electronics chassis installed
in the racks, it is desirable to have a more
  
  4738   Wed May 18 15:54:50 2011 KojiUpdateRF SystemDC power supplies for the RF generation box in place[Koji, Steve]
DC power supplies for the RF generation
box are now in place. They are the top two
  
  4740   Wed May 18 17:06:39 2011 SureshUpdateRF SystemDC power supplies for the RF generation box in place 
I have checked the voltages on the
connector.  They are okay and I have
  
ELOG V3.1.3-