  3076   Mon Jun 14 22:16:08 2010 JenneUpdateIOOMode scan after Mode Matching Telescope

[Jenne, Kiwamu]

We measured the mode after the Mode Matching Telescope. 

 

---- fitted parameters ----

       w0_h =  2.85 +/- 0.0115 mm

       w0_v =  2.835 +/- 0.00600 mm

       z0_h = 5.4 +/- 0.447  m

       z0_v  = 6.9 +/- 0.305  m

  3094   Mon Jun 21 18:01:34 2010 JenneUpdate40m UpgradingSRM, PRM hung, magnets inspected

[Jenne, Kiwamu, Rana, Eric Gustafson]

The SRM and PRM have been re-hung, and are ready for installation into the chambers.  Once we put the OSEMs in, we may have to check the rotation about the Z-axis.  That was not confirmed today (which we could do with the microscope on micrometer, or by checking the centering of the magnets in the OSEMs).

Also, Eric and Rana inspected the Tip Tilt magnets, and took a few that they did their best to destroy, and they weren't able to chip the magnets.  There was concern that several of the magnets showed up with the coatings chipped all over the place.  However, since Rana and Eric did their worst, and didn't put any new chips in, we'll just use the ones that don't have chips in them.  Rana confiscated all the ones with obvious bad chips, so we'll check the strengths of the other magnets using a gaussmeter, and choose sets of 4 that are well matched. 

Eric, photographer extraordinaire, will send along the pictures he took, and we'll post them to Picasa.

  3098   Tue Jun 22 18:56:32 2010 JenneUpdateEnvironmentBad placement of recycling bin

Someone has been moving the big blue recycling bin in front of the laser-chiller-chiller (the air conditioner in the control room).  This is unacceptable.  The chiller temp was up to 20.76C.  No good. 

You are free to move the recycling bin around so you can access drawers or the bike-exit-door in the control room, but make sure that it does not block air flow between the chiller-chiller and the chiller. 

The attached photo shows the BAD configuration.

  3099   Tue Jun 22 20:07:08 2010 JenneUpdate40m UpgradingFirst attempt at Tip Tilt hanging

[Jenne, Steve, Nancy, Gopal]

We made an attempt at hanging some of the Tip Tilt eddy current dampers today. 

Photo 1 shows the 2 ECDs suspended.

Procedure:

(1) Loosen the #4-40 screws on the side of the ECDs, so the wire can be threaded through the clamps.

(2) Place the ECDs in the locator jigs (not shown), and the locator jigs in the backplane (removed from main TT structure), all laying flat on the table.

(3) Get a length of Tungsten wire (0.007 inch OD = 180um OD), wipe it with acetone, and cut it into 4 ~8cm long segments (long enough to go from the top of the backplane to the bottom).

(4) Thread a length of wire through the clamps on the ECDs, one length going through both ECDs' clamps.

(5) One person hold the wire taught, and straight, and as horizontal as possible, the other person tightened the clamping screws on the ECDs.

(6) Again holding the wire in place, one person put the clamps onto the backplane (the horizontal 'sticks' with 3 screws in them).

(7) The end. In the future, we'll also clip off extra pieces of wire.

When we held up the backplane to check out our handy work, it was clear that the bottom ECD was a much softer pendulum than the top one, since the top one has the wire held above and below, while the bottom one only has the wire held on the top.  I assume we'll trim the wire so that the upper ECD is only held on the top as well?

Lessons learned:

* This may be a 3 person job, or a 2 people who are good at multitasking job.  The wire needs to be held, the ECDs need to be held in place so they don't move during the screwing/clamping process, and the screws need to be tightened.

* Make sure to actually hold the wire taught. This didn't end up happening successfully for the leftmost wire in the photo, and the wire is a bit loose between the 2 ECDs.  This will need to be redone.

* We aren't sure that we have the correct screws for the clamps holding the wire to the backplane.  We only have 3/16" screws, and we aren't getting very many threads into the aluminum of the backplane.  Rana is ordering some 316 Stainless Steel (low magnetism) 1/4" #4-40 screws.  We're going for Stainless because Brass (the screws in the photo), while they passed their RGA scan, aren't really good for the vacuum.  And titanium is very expensive.  

The 2nd photo is of the magnet sticking out of the optic holder.  The hole that the magnet is sitting in has an aluminum piece ~2/3 of the way through.  A steel disk has been placed on one side, and the magnet on the other.  By doing this, we don't need to do any press-fitting (which was a concern whether or not the magnets could withstand that procedure), and we don't need to do any epoxying.  We'll have to wait until the ECDs are hung, and the optic holder suspended, to see whether or not the magnet is sticking out far enough to get to the ECDs. 

  3104   Wed Jun 23 12:47:43 2010 JenneUpdateSUSPRM, SRM ready for vacuum

I fitzed with the PRM and SRM briefly, and I now believe that they're both ready to go into the chambers. 

For each optic, I used the microscope on a micrometer to check that the scribe lines on each side of the optic were at the same height.  Basic procedure was to center the microscope on one scribe line, move the microscope to the other side, to see how far the line was from center, and try to (very gently!!) rotate the optic in the wire about the z-axis about half the distance that the one scribe line needed to be.  Rinse and repeat several times until satisfied. 

I then checked that our HeNe oplev was still at 5.5" beam height, and that the beam traveled straight across the table.  I put the SRM in the oplev, unclamped the EQ stops, and waited for it to settle.  The HEPA filters were turned off, to minimize the breeze.  While the SRM settled, I worked on the height/rotation for the PRM on the other table. 

After checking the SRM balance, I clamped it and moved it, and checked the PRM balance, then turned off the HeNe and rewrapped everything in foil, and turned on the HEPAs.

Both the SRM and the PRM seem a little off in Pitch.  The beam returning to the QPD (placed just next to the laser) was always ~1cm above the center of the QPD.  The beam travel distance was ~3m (vaguely) from laser to optic to QPD.  This effect may be because the optics were originally balanced with OSEMs in place, and I didn't have any OSEMs today.  Koji and I found several months ago that the OSEMs have some DC affect on the optics.

Anyhow, since our optics are so small, I think the OSEMs and coils can handle this small DC offset in pitch, so I think we're ready to rock-n-roll with putting them in the chambers.

Still on the to-do list......Tip Tilts!

The photo shows the oplev beam position on (kind of) the QPD, for the SRM.  The PRM was basically the same.

  3115   Thu Jun 24 13:02:59 2010 JenneUpdateComputersSome lunchtime reboots

[Jenne, Megan, Frank]

We rebooted c1iovme, c1susvme1, and c1susvme2 during lunch.  Frank is going to write a thrilling elog about why c1iovme needed some attention.

C1susvme 1&2 have had their overflow numbers on the DAQ_RFMnetwork screen red at 16384 for the past few days.  While we were booting computers anyway, we booted the suses.  Unfortunately, they're still red.  I'm too hungry right now to deal with it....more to follow.

  3121   Fri Jun 25 15:22:45 2010 JenneOmnistructureSAFETYNo entry to the 40m LVEA until further notice!

                                                                                                                                                                                                                                                                               

The 40m corner station crane is out of order, and it's stuck in a way that prohibits entry to the 40m LVEA / IFO room for safety.  The crane has been locked out / tagged out. 

Until further notice, absolutely no one may enter the 40m LVEA.  Work is permitted in the desk / control room areas.

Signs have been posted on all doors into the LVEA.  Please consider those doors locked out / tagged out.

                                                                                                                                                                                                                                                                               

  3131   Tue Jun 29 08:55:18 2010 JenneFrogsEnvironmentWe're being attacked!

Infested_InvasionOfKillerBugs.jpg

We're going to have to reinstate the policy of No food / organic trash *anywhere* in the 40m.  Everyone has been pretty good, keeping the food trash to the one can right next to the sink, but that is no longer sufficient, since we've been invaded by an army of ants:

AntInvasion_small.jpg

We are going back to the old policy of Take your trash out to the dumpsters outside.  I'm sure there are some old wives tales about how exercise after eating helps your digestion, or something like that, so no more laziness allowed!

  3133   Tue Jun 29 11:48:17 2010 JenneConfigurationSAFETYBack in LASER HAZARD mode.

[Steve, Kiwamu, Jenne]

The 40m is now back in Laser Hazard mode.  Safety glasses are required for entry into the LVEA / IFO room.

  3139   Tue Jun 29 20:47:19 2010 JenneUpdatePEMTerminator put on Guralp Box

A little D-sub terminator was put on the Gur1 input to the Guralp box, to check again the noise level of the box.

  3147   Wed Jun 30 14:38:04 2010 JenneUpdatePEMGuralp terminator is switched

I moved the Guralp box's input terminator from Gur1 to Gur2 a minute or so ago to check the other channels.

  3149   Wed Jun 30 17:30:54 2010 JenneUpdatePEMSeismometers moved for MC Wiener work

Now that the MC is back up and running, I put the Guralp seismometers at the ends of the mode cleaner.  Gur1 is near MC2, and Gur2 is near MC1 (yes, it seems backwards....that's how the cable lengths work).  Also, the set of 3 MC2 accelerometers are in place under MC2.  I can't find the black cube for the other set of accelerometers, so there aren't any around MC1/3. 

  3154   Thu Jul 1 14:28:39 2010 JenneUpdatePEMMC1 Accelerometers in place

Kevin sent me an email with top secret info on where one of the other accelerometer cubes was hiding (it was with his shaker setup on the south side of the SP table), so I took it and put the 3 MC1 accelerometers in their 3-axis configuration. 

Also, I changed the orientation of both sets of 3 axis accelerometers to reflect a Right Handed configuration, to go along with the new and improved IFO configuration.  Previously (including last night), the MC2 accelerometers were together in a Left Handed configuration.

  3162   Tue Jul 6 17:38:27 2010 JenneUpdateSUSTip Tilt Progress!

[Jenne, Kyung Ha]

We successfully suspended the 4 eddy current dampers for the first Tip Tilt.  We had some lessons learned, including how to carefully get an allen wrench in between the dampers to do up some of the screws, and how to be careful not to bend the wire while tightening the screws.  More tomorrow...

  3171   Wed Jul 7 19:41:27 2010 JenneUpdateSUS1.5 more ECD sets suspended for tip tilts

[Jenne, Kyung Ha]

We made some good progress on suspending the Tip Tilt ECDs today.  We finished one whole set, plus another half.  The half is because one of the screw holes on the lower right ECD somehow got cross threaded.  The ECD and screws in question were separately wrapped in foil to mark them as iffy.  We'll redo that second half tomorrow.  This makes a total of 2.5 (including yesterday's work) ECD backplanes suspended.  The only thing left for these ones is to trim up the excess wire.

We also (with Koji) took a look at the jig used for suspending the mirror holder.  It looks like it was designed for so many Tip Tilt generations ago as to be basically useless for the 40m TTs.  The only really useful thing we'll get out of it is the distance between the suspension block and the mirror holder clamps.  Other than that we'll have to make do by holding the mirror and block at the correct distance apart, utilizing a ruler, calipers, or similar.  Rana pointed out that we should slightly bend the blade springs up a bit, so that when they are holding the load of the mirror holder, they sit flat. 

Attached below are 2 different pictures of one of the ECD backplane sets that has been suspended.  One with black background to illustrate the general structure, and one with foil background to emphasize the wires.

  3172   Wed Jul 7 22:22:49 2010 JenneUpdateComputersSome channels not being recorded!!!

[Rana, Jenne]

We discovered to our great dismay that several important channels (namely C1:IOO-MC_L, but also everything on c1susvme2) are not being recorded, and haven't been since May 17th.  This corresponds to the same day that some other upgrade computers were installed.  Coincidence?

We've rebooted pretty much every FE computer and the FrameBuilder and DAQ_CONTROL approximately 18 times each (plus or minus some number).  No matter what we do, or what channels we comment out of the C1SUS2.ini file, we get a Status on the DAQ_Detail screen for c1susvme2 of 0x1000.  Except sometimes it is 0x2000.  Anyhow, it's bad, and we can't make it good again. 

I have emailed Joe about fixing this (with some assistance from Alberto, since we all know how much he likes doing the Nuclear Reboot option for the computers :)

  3196   Mon Jul 12 14:22:36 2010 JenneSummaryPSLThings I did to the PSL today: Refcav, PMC, cameras, etc.

Quote:

I re-aligned the beam into the PMC. I got basically no improvement. So I instead changed the .LOW setting so that PMCTRANS would no longer go yellow and make the donkey sound.

I did the same for the MOPA's AMPMON because its decayed state is now nominal.

[Jenne, Chip]

The alarm was still going, because the LOLO setting was higher than the LOW, which is a little bit silly.  So we changed the .LOLO setting to 0.80 (the LOW was set to 0.82)

We also changed psl.db to reflect these values, so that they'll be in there the next time c1psl gets rebooted.

  3205   Tue Jul 13 11:51:19 2010 JenneUpdatePEMGur1 has no signal?!?!?!?!

[Sanjit, Jenne]

Sanjit discovered that the Gur1 channels are all digital 0.  We determined that this began on July8, 04:00 UTC (~9pm on the 7th?).

It's digital zero, so we suspect a software thing.  Just to check, we put a sine wave in, and didn't see anything.  Gur2 seems totally fine, and the sine wave input showed up nicely on dataviewer.  What's going on? Sabotage to prevent this paper from getting done?  Dmass trying to get his paper done before me???

Investigations are ongoing.... Joe claims it's not his fault, since his shenanigans near the PEM rack were on days before, and days after this, but not on the 7th.  

  3211   Tue Jul 13 23:20:37 2010 JenneUpdatePEMGur1 has no signal?!?!?!?!

Quote:

[Sanjit, Jenne]

Sanjit discovered that the Gur1 channels are all digital 0.  We determined that this began on July8, 04:00 UTC (~9pm on the 7th?).

It's digital zero, so we suspect a software thing.  Just to check, we put a sine wave in, and didn't see anything.  Gur2 seems totally fine, and the sine wave input showed up nicely on dataviewer.  What's going on? Sabotage to prevent this paper from getting done?  Dmass trying to get his paper done before me???

Investigations are ongoing.... Joe claims it's not his fault, since his shenanigans near the PEM rack were on days before, and days after this, but not on the 7th.  

 I just rebooted c0dcu1, which didn't help anything.  Joe said he'd try to give me a hand tomorrow.

  3220   Wed Jul 14 16:39:06 2010 JenneUpdateDAQDebugging Guralp and reboots

[Joe, Jenne]

Joe got on the phone with Alex, and Alex's magic Alex intuition told him to ask about the RFM switch.  The C0DAQ_CTRL's overload light was orangeAlex suggested hitting the reset button on that RFM switch, which we did. That fixed everything -> c0dcu1 came back, as did the frame builder.  Rana had pointed out earlier that we could have brought back all of the other front ends, and enabled the damping of the optics even though the FB was still down.  It's okay to leave the front ends & watchdogs on, and just reboot the FB, AWG, and DAQ_CTRL computers if that is necessary.

Anyhow, once the FB was back online, we got around to bringing back all of the front ends (as usual, except for the ones which are unplugged because they're in the middle of being upgraded).  Everything is back online now.

After all of this craziness, all of the Guralp channels are working happily again. It is still unknown why they starting being digital zero, but they're back again. Maybe I should have rebooted the frame builder in addition to c0dcu1 last night?

 

Quote:

This is regards to zero signal being reported by the channels C1:PEM-SEIS_GUR1_X, C1:PEM-SEIS_GUR1_Y, and C1:PEM-SEIS_GUR1_Z.

I briefly swapped Guralp 1 EW and Guralp 2 EW to confirm to myself that it was not on the gurlap end (although the fact that its digital zero is highly indicative a digital realm problem).  I then unplugged the 17-32, and then 1-16 channel connections to the 110B.  I saw floating noise on the GUR2 channels, but still digital zero on the GUR1 channels, which means its not the BNC break out box.

There was a spare 110B, unconnected in the crate, so to do a quick test of the 110B, I turned off the crate and swapped the 110Bs, after copying the switch configuration of the first 110B to the second one.  The original 110B was labeled ADC 1, while the second 110B was labeled ADC 0.  The switches were identical except for the ones closest to the Dsub connectors on the front.  All those switches in that set were to the right, when looking down at the switches and the Dsub connectors pointing towards yourself.

Unfortunately, the c0duc1 never seemed to come up with the new 110B (ADC 0).  So we put the original 110B back.  And turned the crate back on. 

The fb then didn't seem to come back quite right.  We tried rebooting fb40m it, but its still red with status 1.  c0daqctrl is green, but c0dcu1 is red, although I'm not positive if thats due to fb40m being in a strange state.  Jenne tried a telnet in to port 8087 and shutdown, but that didn't seem to help.  At this point, we're going to contact Alex when he gets in around 12:30.

 

 

  3249   Tue Jul 20 11:49:31 2010 JenneUpdateSUSSome Suspensions not damping

[Jenne, Koji]

I moseyed into the control room this morning, to find ITMX and ITMY both with their watchdogs tripped.  ITMY (new convention) wouldn't damp.  Koji discovered that there was a sign flip in 2 of the sensors.  A set of reboots of c1susvme1&2 fixed the problem. 

A side note:  For the ETMs, the OSEM sensor readouts are gigantic (~20,000), whereas for the similar channels on all other optics, the readouts are on the order of 1.  After some looking around, it seems that this is just the way things have been (for at least 100 days), and the filters in the SUSPOS and other SUS filter banks have a high pass filter to take care of this.  It's weird, but it seems to be the way it is, and the ETMs damp, so it's all good.

  3295   Mon Jul 26 20:30:35 2010 JenneUpdateSUS2 Tip Tilts suspended and balanced

[Koji, Jenne]

We were on Team Cleanroom, while Kiwamu and Alberto were on Team Chamber.  Team Cleanroom suspended and balanced 2 Tip Tilts this afternoon.

One of the TTs that was suspended today is the one which was broken on Friday (see elog 3278).  We resuspended it using the regular 0.0036" diameter wire (91um).  We balanced it using the HeNe oplev, and then set it aside.  This TT has serial number 2.

We noticed that, like the previous 2 TT suspensions (this one before it was broken, and the one actually installed in the BS chamber on Friday, which is #3), there seems to be a little bit of hysteresis in the pointing.  The difference comes if we poke the top of the mirror holder and observe the place the reflected beam spot comes to rest at, and if we poke the bottom of the mirror holder.  The beam spot stays a little higher when we poke the top vs. when we poke the bottom. 

To combat this, we tried suspending our second TT of the day (the one that Kyung Ha and I had half finished) using thinner wire for the mirror holder.  We used the 0.0017" diameter wire (43um) that is used for the SOSes.  Unfortunately, it still seems like there is a similar hysteresis.  The thin-wire TT has serial number 4.

While working on TT4, we recalled that we have to include rubber dampers for the vertical blade springs.  Oooops!  We used some of the leftover #4-40 screws with viton tips that Zach and Mott had made for Earthquake stops to damp the vertical resonance of the blades.  We measured the Q factor by flicking the blades up or down.  We changed the oplev setup to be a shadow sensor setup, and watched the ringdown of the vertical mode on the 'scope.  We counted #cycles/time = frequency, and the t(1/2) time for the exponential ringdown to calculate the Q.  For the shadow sensor, we positioned the QPD in line with the initial HeNe beam, and placed the edge of the mirror holder clamp partially in the beam, so the beam was partly occluded.  When the mirror shook up and down, more or less of the beam was blocked, and we could see this power fluctuation on the 'scope.

Using the formula Q = pi  f0 T1/2 / ln(2) = 4.53 f0 T1/2, where T1/2 is the the time it takes for the amplitude to decay by half, we measured a Q of 31 for the vertical mode with no damping, and a Q of 14 with damping.  Koji confirmed the calculation and put it into wiki.

We need to go through the other TTs that have been assembled and give them their rubber dampers.

 

  3303   Tue Jul 27 23:46:45 2010 JenneUpdateSUSQ measurements of 2 TTs

[Koji, Jenne]

We took measurements of the Q of all the modes that we could think of for TT#4, and then repeated several of the same measurements for TT#2.  We noticed that when we took off the backplane and then replaced it on TT#4, the pitch pointing had changed, so we had to repeat the balancing procedure by slightly shifting the position of the wire clamps relative to the mirror holder. No fun. We decided to quit removing the backplanes. 

The main conclusion of this evening's measurements of TT#4 is that everything looks very close to the design ideas.  Good work team!

TT#4:

'Free Swinging' values (just for interest)

Vert, no damping:   Q = 31.4

Pitch, no damping (ECD backplane removed): Q = ~700

Yaw, no ECDs: Q = ~900

Pos, no ECDs (no measurement) - we had already put the backplane back on, and didn't want to take it off again.

 

Damped Values:

Vert, with damping: Q = 14.3

Pitch, with ECDs: overdamped, so Q < 1/2

Yaw, with ECDs: Q = 2.3

Pos, with ECDs: Q = 1.4

Side, with ECDs: Q = 1.9

 

We also measured the resonant frequency of each of the ECDs for this TT (since we had the backplane removed anyway...)

ECD UL: 10.05Hz

ECD UR: 10.15Hz

ECD LL: 10.21Hz

ECD LR: 10.21Hz

 

TT#2:

Yaw, with ECDs: Q = 7.0

Pitch, with ECDs: overdamped, so Q < 1/2

Vert: Problematic.  No damping, f = 25.9Hz, Q = 36.  With rubber dampers, f = 20.0Hz, Q = 42.   Yes, you read that right.  The frequency is lower, and the Q is higher *with* the damping.  Perhaps our brains are fried.  Perhaps we've discovered new, inconsistent physics (awfully unlikely....). We'll revisit this again tomorrow to figure out what mistake we're making.

  3314   Wed Jul 28 18:24:57 2010 JenneUpdateGreen Locking2 Green Periscopes have mirrors, aligned

[Koji, Jenne, Kiwamu]

This is to describe the work that went on in the Cleanroom today.  Kiwamu's entry will detail the tidbits that happened in the chamber.

We engraved the periscope mounts with the mirror info for the mirrors which were placed in the periscope.  We also engraved the barrels of the optics with their info, for posterity.  Koji carefully put the mirrors into the periscopes.  Since we have wedged optics, the goal was to have the front HR surface of the mirror parallel to the plane of the mount, and leave a bit of space behind one side of the optic (if we just pushed the optic fully in, the HR surface wouldn't be flat, and would send the beam off to the left or right somewhere).  Once the mirrors were mounted in the periscopes, we checked the vertical levelness of the outcoming beam.  For the first periscope (the one which has been installed on the BS table), the beam was deflected upward (2.5)/32 inches over 55inches.  This corresponds to a 1.4mRad vertical deflection.  The second periscope (which will eventually be installed on the OMC table) had a deflection of 1/32 over 55inches, or 0.6mRad.  We did not check the side-to-side deflection for either of the periscopes.

We also engraved one more DLC mount with mirror info, and put a mirror into the mount.  This is one of the optics that was placed onto the BS table today, which Kiwamu will describe.

We removed TT#3 from the BS chamber so that it could have rubber vertical dampers installed, and be characterized.  For future reference, the #'s of the Tip Tilts refers to the serial number of the suspension block piece, which forms the top horizontal bar of the frame. 

  3334   Fri Jul 30 17:24:22 2010 JenneUpdatePEMGuralps back in the 40m

I brought the GUR2 seismometer back from Bridge so I can get some more MC/Seismic data during the next week while we're pumped down, before we start doing things to the PSL table.  Both of the Gur Seismometers are connected back up to the breakout box as of ~3:27pm today.  Alastair still has the handheld controller thing (which I use for mass centering, on occasion), since he'll want the seismometer back in a week or two when I'm done with it.

 

Something is wrong with both X channels of the Guralps.  Alastair claimed that he and Frank didn't do anything bad when they opened up the breakout box, but I am suspicious. 

 

While I'm at it, a reminder that Jan and his SURF student Greg still have the Ranger, disassembled over in Bridge.  They made a note in their elog, but not in the 40m elog when they took it back again.

Whenever you're done with the Mode Cleaner for the next week, please make sure it is locked, nicely aligned and happy before you leave.  Also please make a note of what you're doing and when, so that I know what is good data and what is data with unusual conditions.

In other, semi-bad news (but already recovered from), when I was finishing putting the Guralp Breakout Box back in the rack, I bumped the power strip that is on the top back side of the rack, near the corner that the door opens on (not the corner the door hinges on).  I turned the power strip back on, and I think everything that is connected to it came back okay.  Anyhow, my bad. Sorry. 

  3349   Mon Aug 2 18:02:46 2010 JenneUpdatePEMSeismometer Update: Still not good, but perhpas getting better

Today's seismometer diagnosis activities are still underway, this is just an update (since I did some reboots):

Problem 1: X and Z channels on both seismometers were flipped.  I unplugged an X cable (East/West on the cable labels) and the Z channel (vert) would go to floating ADC zero.  Rana suggested that the ADCs sometimes have random channel hopping, and that a reboot of the c0dcu1 computer which handles the PEM ADCU should fix this problem.  I keyed the c0dcu1 / c0daqawg crate, those computers came back just fine, and the channels were no longer flipped.  This is a good thing.  Although now it's actually the Z channels that were / are bad on both seismometers, not the X's.

While rebooting those computers, c1iovme, c1sosvme, c1susvme1 and c1susvme2 crashed.  I rebooted them, although for the first few power cycles c1susvme1&2 couldn't mount /cvs/cds/caltech.  Eventually they did, and life is good again.  Except that the seismometers are still funny.

  3351   Tue Aug 3 01:51:01 2010 JenneUpdatePEMSeismometer Update: Still not good, but perhaps getting better

Quote:

Today's seismometer diagnosis activities are still underway, this is just an update (since I did some reboots):

Problem 1: X and Z channels on both seismometers were flipped.  I unplugged an X cable (East/West on the cable labels) and the Z channel (vert) would go to floating ADC zero.  Rana suggested that the ADCs sometimes have random channel hopping, and that a reboot of the c0dcu1 computer which handles the PEM ADCU should fix this problem.  I keyed the c0dcu1 / c0daqawg crate, those computers came back just fine, and the channels were no longer flipped.  This is a good thing.  Although now it's actually the Z channels that were / are bad on both seismometers, not the X's.

While rebooting those computers, c1iovme, c1sosvme, c1susvme1 and c1susvme2 crashed.  I rebooted them, although for the first few power cycles c1susvme1&2 couldn't mount /cvs/cds/caltech.  Eventually they did, and life is good again.  Except that the seismometers are still funny.

 Some more progress, but still not complete:

Jan and I looked at all of the Gur channels on a 'scope (battery, so as not to be grounded), and 5 of the 6 looked good.  We were looking at the BNCs just as they go into the ADC.  The one which still looks bad is Gur1Z.  The 'scope just doesn't see any signal on that channel. 

In addition, the ADC's BNC input #4 (which normally has Gur2Z) looks totally shot.  When it's floating, the signal on dataviewer definitely doesn't look floating.  I'm probably going to have to move over to another channel, and just give that one up (this ADC already has several channels which have been declared bad, so maybe it's not a surprise that this can happen?)

Since one of the Gur signals looks bad (Gur1Z) and one of the ADC channels looks bad (usual Gur2Z), I switched the Z channels on the ADC board, so the channel being saved as Gur1Z is in fact Gur2Z.  This is valid as of ~1:15am until further elog notice.

During my investigations into why Gur1Z is funny, I also looked at the signal on the BNC octopus cable coming straight from the output of the Guralp Breakout Box (this is the cable which goes from "ADC Out" on the back of the box which is a 37 pin D-sub to 9 differential BNCs), and sometimes I saw zero on the 'scope, but sometimes there was a signal which would coincide with jumping tests.  Whenever there was a signal however, it was always a way lower amplitude (at least by a factor of 10?) than the other channels.

All of this craziness led to me pulling the Guralp box to investigate. 

Upon opening the box, I recalled that the channels go in order: Vert, NS, EW.  The Gur1Z channel is that first vert channel, and it's the one which always had a blue input capacitor rather than a surface mount one.  Being suspicious of Frank and Alastair, since they seemed unhappy with my capacitor choices, I wondered if they had wiggled the blue cap, and tore something loose.  Just in case, and to make things seem more uniform, I replaced the blue cap with a surface mount 1uF cap.  (Actually its 0.909uF, replacing the 0.905uF blue cap, according to the black DMM that measures capacitance.) While I was in there, since it had been a problem in the past (elog 2811), I relflowed the solder on some of the resistors, especially near the output op amp. 

Anyhow, none of that may have been necessary.  All 6 of the Gur channels were examined on a 'scope, using clip doodles to measure the various Test Points on the circuit.  I looked at all of the TPs in Gur1Z, and I didn't find that any particular stage was any noisier than the others.  Also, all 6 of the Gur channels seemed totally fine in terms of sending a good signal to the output of the box, including Gur1Z which is currently under investigation.  All of the channels passed the "output looks ~20x the input" test, and for approximately equal thumping on the ground all 6 channels seemed to have similar amplitude outputs.  The Z channels on both channels one and channels two were a little bigger than the X's or Y's, but the 2 Z channels were about the same.  This test was done using Guralp2 and the Gur2 cable on both channels 1 and 2, and then checked with Guralp 1, using the Gur2 cable on channels 1.  The Vert1 channel always seemed good.

I now am suspicious of one or more of the cables: either the Gur1 cable from the seismometer to the box, or the Vert1 channel of the octopus cable.  I'm satisfied that the BNC cables running through the cable tray are okay (although it might not hurt to check that they all successfully send a sine wave...)  I opened up the backshell of the Gur1 cable, on the end that connects to the breakout box.  Nothing seemed amiss.  I still need to Beep the cable to check its connections, and look at the octopus cable. 

Recap / Current Status:  Breakout Box is reinstalled, both seismometers hooked up.  The Z channels on the seismometers are swapped at the ADC input. The dataviewer channels Gur1_X, Gur1_Y, Gur1_Z (which is actually Z of Gur2 seismometer) and Gur2_X, Gur2_Y are all good.  Nancy is going to leave the MC in a happy place, and note the time when she's done. Tomorrow I'll check out the cables for the Gur1Z seismometer channel. 

  3354   Tue Aug 3 11:50:16 2010 JenneUpdatePEMSeismometer Problem Tracked down

After some cable swapping this morning, I have determined which cable is bad.  It's the Gur1 cable between the seismometer and the breakout box.  This is a milspec -> 37pin d-sub cable.  I'll pull out the cable and have a look at it after lunch.

  3356   Wed Aug 4 03:01:56 2010 JenneUpdatePEMCatastrophic Cable Failures

Quote:

After some cable swapping this morning, I have determined which cable is bad.  It's the Gur1 cable between the seismometer and the breakout box.  This is a milspec -> 37pin d-sub cable.  I'll pull out the cable and have a look at it after lunch.

 So, I was wrong about which cable it was, probably in my rush to get some lunch.  The actual culprit was the octopus cable that Bob made waaay back in the day (~2 years ago) to go from the "ADC out" of the breakout box (37pin Male Dsub) to 9 BNCs.  As it turns out, the Gur1Z channel of that cable was broken on both ends!!! 

On one end, we have the 37 pin Dsub.  The cable used was so thick (way too thick for this application) that it made a super rigid connection between the wires and the connector, and any bending of the cable stressed this connection, despite the strain-relief of the backshell.  The Gur1Z connection snapped off when I was gently wiggling the connections to check them out.  Also, since the wires were all so thick, they didn't really fit into the hole in the backshell, so 2 or 3 of them were squished.....straight through the insulation so that several channels were shorted together / potentially shorted to ground.  This may explain some of the nasty behavior that Rana and I had seen (although I might have forgotten to elog? My bad.) that even with the inputs of the breakout box all terminated, there was high coherence between the channels.  Terminated inputs should give random noise, so this was fishy. 

On the other end of the cable we have the 9 BNCs.  I had finished redoing the 37pin end of the cable, and was 'beeping' it to check it out, when to my dismay I found that the Gur1Z channels (the inside and the outer shield of the BNC connector) were shorted together.  I removed these 2 wires from the Dsub connector to confirm that the BNC was at fault.  Koji looked at the BNC with me after I chopped it off of the cable.  Bad news strikes again.  To get the wires to fit in the inner pin of the BNC connector, the cable-maker had cut off several strands of the wire to make it skinnier.  It appears that over the years these cut-off strands wiggled their way to touching the outer shield.  This appears to be a danger for all of the BNCs on this cable: a little bit of torque (which one might expect during plugging and unplugging a BNC) and the 2 sides of the differential measurement will be shorted together.

I then decided to start afresh and make my own cable.  I found some AWG26 8-twisted-pair cable laying around underneath the Yarm (since this was all I could find, I was just going to do the Gur1 and Gur2 channels, and leave out the Gur3's).  The 37 Dsub side was easy, but I seem not able to connect such skinny wire to the BNC connectors in a robust way.  Since this bad cable has so far cost me ~2.5 16-hour days of grief, I don't want my new version of it to also be bad.  At this point, I await the advice of one wiser than I. I think BNC connectors are designed for something a little closer to ~20AWG, but I could be wrong.  Also, they are obviously optimized for coax cable. So what I have now is never going to be great.  Maybe tomorrow I can go to the Electronics Shop / Store and buy BNC connectors that are meant to be soldered-to.  That would be awesome.

Since I currently have no functional cable to go from Breakout box to ADC, the Guralps are unplugged for tonight.

Conclusions for the day / evening:  Frank, Alastair and Jenna are mostly absolved of blame, although the traveling to Bridge and opening and closing the box (which usually involves more plugging and unplugging of cables) probably didn't help this cable out too much.  Also, Bob definitely owes me a Sugar Napoleon or something.

 In other news, since the Gur2Z ADC channel is totally wacked, I have taken over (but not renamed) the Ranger channel for Gur2Z for now.  Jan still has the Ranger hostage over in Bridge, so this is okay for now.

  3362   Wed Aug 4 20:15:07 2010 JenneUpdatePEMYay! Guralps work again!

After much hassle, the Guralp cable from the ADC Out of the breakout box to the ADC is fixed, and everything is plugged in and working again.  The seismometers are back in their regular positions at the ends of the MC, ready for some excellent seis/MC combo data. 

I solidified the change of putting the Gur2Z channel into a different BNC input on the ADC.  The C1ADCU_PEM.ini file has been changed so that what used to be the Ranger's channel is now recognized as Gur2Z. 

Also, I changed the same .ini file to reflect Koji's move of ACC_MC1_Z to the old AUDIO_MIC2 channel, so now all 6 Accelerometer channels have the same calibrations again.

Another big change is the change from old-left-handed convention to new-right-handed convention.  The seismometers are aligned the same way they always have been (with the North-South markers aligned with the MC), but now the North-South output is plugged into the BNC on the ADC that is associated with Gur*_X, and the East-West output is plugged into the ADC channel associated with Gur*_Y.  This is true for both Guralp Seismometers. 

So, now we have:

Gur1_X = Gur1_NS = ADC#10

Gur1_Y = Gur1_EW = ADC#11

Gur1_Z = Gur1_Vert = ADC#12

Gur2_X = Gur2_NS = ADC#2

Gur2_Y = Gur2_EW = ADC#3

Gur2_Z = Gur2_Vert = ADC#24

SEIS_Ranger_Y = no longer in the .ini file

  3373   Fri Aug 6 12:22:04 2010 JenneUpdateIOOMC data taking over the weekend

Nancy has the Mode Cleaner for her work for the night, and is going to leave the MC happy, locked, autolocker on, WFS enabled, the works, and write down in the elog the time that she's finished. After that, I'm taking MC/seismic data all weekend long.  During the weekend, if at all possible, please don't go into the IFO room, especially near the Mode Cleaner.  If you do need to go into the IFO room, please elog the time you went in, and the time you left so I can correlate it with my dataThis is actually important, so please stick a quick elog entry in if you even think about opening the doors to the IFO room. It is much appreciated. 

  3416   Thu Aug 12 23:41:48 2010 JenneUpdateelogrestarted

Quote:

 script

 More of the same. 

Who is putting weird figures into the elog?!?!  I haven't checked lately, but this is what usually crashes the elog.  It's been happening a lot lately, and it might be the .pdf's. 

Let's play a new game.  We'll call this game "Everyone only use .png files for the next week" Ready? GO!

  3425   Mon Aug 16 19:12:18 2010 JenneUpdateSUSMore TT characterization

[Jenne, Yoichi]

We characterized Tip Tilts numbers 2 & 3 today.  Recall #4 is the one which Koji and I measured some time ago, and #s 1 & 5 have yet to be suspended (that's on the to-do list for tomorrow).

When we began looking at #3 (the one which had been in the BS chamber for a few days, but was removed for characterization) we found that the pitch pointing was way off.  The beam was way too low after reflection.  So we adjusted that (and got it right on the first try....a miracle!).  This does however make me pretty concerned about our in-chamber pointing.  Are we destroying our pointing during travel between the cleanroom and the chambers?  Is there anything we can do about it? Pointing doesn't seem to be lost when we move them around on the tables in the cleanroom, ie we can pick up a TT, move it, leave it for a while, move it back to the oplev, and the pointing still seems okay.  But the TT which was sent to the chambers came back with bad pointing. I'm sure this is related to the hysteresis we see in the pointing if we poke the top of the mirror holder versus the bottom when exciting pitch motion.

For both #2 and #3, we measured the frequency and Q of Pitch, Yaw, Pos, Side, Vert motion.  For the Vert motion, we measured both without and with EQ stops as dampers.  For the other modes, all were measured with the ECD backplane in place.  Pitch and Yaw were measured with reflection off of the mirror surface onto the PD, while Pos, Side and Vert were measured using the wire clamp on the mirror holder to obscure the beam as a shadow sensor.

TT #2

Pitch: Overdamped, no freq measured, Q < 1/2

Yaw: freq ~1.8Hz, Q between 2-7

Pos: freq ~1.75Hz, Q too low to measure, but above critically damped

Side: freq ~ 1.8Hz, Q~5

Vert no dampers: freq ~20Hz, Q~36

Vert with dampers on outer screws: freq~24Hz, Q~8,

TT #3

Pitch: no freq measured.  Q~1/2?  Upon being excited in Pitch, the beam started down way below the photodiode, came up a little past its DC place, and went back down a tiny bit.  So not quite overdamped.

Yaw: freq ~1.96Hz, Q very low

Pos: freq ~1.72Hz, Q~3

Side: freq ~1.85Hz, Q~6

Vert no dampers: freq ~20Hz, Q~75

Vert with dampers on outer screws: freq ~20Hz, Q~34  (Frequency stayed constant....we did several measurements both with and without the dampers...but the half life time changed significantly)

 

Things we noticed:  Koji and I had been concerned the last time we were looking at TT#2 because the frequency got lower and the Q seemed to get higher when we added the damping to the vertical blades.  Yoichi and I did not find that to be true today.  We did notice, however, that the EQ stop screws with the viton had been placed in the holes closer to the clamping point, whereas with TT #4 the screws had been placed in the holes farther from the clamping point.  We moved the screws on TT #2 to the outer holes, and noticed that the frequency increased slightly, and the Q significantly decreased.  We then followed this outer-hole philosophy when installing screws in TT #3.

To Do List: We need to suspend the ECDs and the Optics for the remaining two Tip Tilts, and to characterize them.  We also (probably farther-future) need to take transfer functions using a shaker / shake table with our spare Tip Tilt.  After all the TTs are suspended and have their modes measured, we will be ready for installation into the chamber during the next vent.

 

  3436   Wed Aug 18 19:14:59 2010 JenneUpdateelogelog dead again

The elog was so dead this time that the restart script didn't work.  I followed the restart-by-hand instructions instead, with success.

  3437   Wed Aug 18 19:19:38 2010 JenneUpdateSUSFinal 2 TTs suspended!

[Jenne, Yoichi]

The final 2 Tip Tilts (#1 and #5) have been suspended.  We have designated #5 the spare.  It looks like there might be a teensy bit of dust on the AR surface of the optic in #5, right near the edge of the coating.  Not a critical issue if this one is the spare, although we should see if we can blow it off with the Nitrogen.  Both #1 and #5's optics were suspended using the thicker wire, 0.0036" diameter.  This leaves 4/5 TTs with this thick wire, and 1 of the 5 has the thin wire.

To do still: Balance both #1 and #5, and then measure the modes of each.  Then we'll be ready to install them into the chambers, and we'll reserve #5 for shake table TFs for some later date.

 

  3439   Thu Aug 19 01:49:14 2010 JenneUpdateelogelog dead again

Quote:

The elog was so dead this time that the restart script didn't work.  I followed the restart-by-hand instructions instead, with success.

 Just for added interest, I tried a different method when the restart script broke.  The "start-elog-nodus" script has a line "kill elogd".  This seems not to be actually killing anything anymore, which means the elog can't restart.  So this time I went for "kill <pid number>", and then ran the startup script.  This worked.  So it's the "kill elogd" which isn't working reliably.

  3447   Fri Aug 20 15:22:09 2010 JenneUpdateSUSTTs done!!!

[Yoichi, Jenne]

Hooray!!! The Tip Tilts are completely done!  The only things remaining are (1) Install 4 TTs in chambers sometime in September and (2) do shake tests / take TFs of the spare.

Today we balanced and characterized #'s 1 and 5.  All 5 TTs are waiting happily on the flow bench in the cleanroom for installation.

  3454   Mon Aug 23 00:08:24 2010 JenneUpdateelogJoe, I think this's your cue...
  3459   Mon Aug 23 21:04:14 2010 JenneUpdateTreasureSeriously?

Bad CDS team. Bad.

BadKiwamu_CDSsetup.jpg

 

 

 

  3470   Wed Aug 25 15:42:01 2010 JenneUpdatePSLPSL Upgrade: Mode Matching from PMC to IMC

Thoughts on where to take the pickoff for the SHG for the PSL-green?  We discussed today at the meeting the possibility of putting a 90/10 beam splitter right after the PMC, so that the green team would get somewhere between 100-200mW. 

Quote:

40mPSL.png

 

 

  3476   Fri Aug 27 11:24:13 2010 JenneOmnistructureComputersop540m dead

I think op540m has finally bitten the dust.  I noticed that both of its screens were black, so I assumed that it had crashed due to known graphics card issues or something.  But upon closer inspection, it is way more dead than that.  I checked that it does have power (at least the power cable is securely plugged in at both ends, and the power strip its on is successfully powering several other computers), but I can't make any lights or anything come on by pressing the power button on the front of the computer tower.

Immediate consequences of op540 not being operational are the lack of DMT, and the lack of Alarms. 

Joe is doing an autopsy right now to see if its really dead, or only 'mostly dead'.

EDIT: Joe says maybe it's the power supply for the computer.  But he can't turn it on either.

  3482   Fri Aug 27 22:09:37 2010 JenneUpdatePSLThe beginnings of the new PSL

[Rana, Jenne]

Like a new phoenix, the 40m PSL is in the process of being reborn...

phoenix.jpg

We cleared many old optics and components (including Alberto's favorite periscope) off of the north end of the PSL table.  Some optics are stored on the SP table, others on the shelf inside the PSL enclosure.

The new Innolight 2W NPRO is on the table, the PMC has been moved, and the main path of the laser has been sketched out using steering mirrors. Since we still don't have a beam, we're roughly placing all of our optics, and we'll finalize the alignment after turning on the laser.

Using a leveled HeNe, I checked the height of optics we should use to match the height of optics in the chambers by shining the light at the first steering mirror in the chamber, and ensuring that the beam hit the center of that optic .  Since the new PSL table height is identical to the AP table, it's not a surprise that from now on we will be using a 4" beam height on the PSL table, rather than the old PSL 3" beam height.

On the to-do list is to make a plate with 4 through holes to raise the PMC up by 1 inch, and to make an adapter plate (or come up with another plan) for mounting the AOM that goes directly after the NPRO/Faraday, among many other things.  We also still need to make some space for the RefCav to be put in its new place on the table, and then install it with Steve's help.   

  3489   Mon Aug 30 18:35:22 2010 JenneUpdateWienerFilteringSecret Hiding Place for Raw Data

As it turns out, data seems to fall off the 16Tb drives after ~20 days.  Which makes it a good thing that I saved all of my raw data from my good Mode Cleaner / seismic weekend for offline Wiener Filtering in the following secret place:

/cvs/cds/caltech/users/jenne/AdaptiveFiltering/mat/MCseis_raw_data_7Aug2010

It's not linked to the svn, since it's a boatload of data.

  3511   Thu Sep 2 01:44:13 2010 JenneUpdatePSLPSL beam hitting the PMC!

[Rana, Jenne]

More PSL progress. 

The new laser was raised to a 4 inch beam height using basically the most randomly thrown together method possible.  (It'll work just fine for aligning things, but we seriously need to get a nice block made.)  The PMC and the nice Osamu-mirror mount to go into the PMC also have temporary risers, so we'll need to replace them with the real deal as soon as we get things back from the shop.

So far we've got (1) the lens after the laser, (2) a Half Wave Plate (no quarter wave plate yet), (3) steering mirror that will go after the EOM, (4) 2 steering mirrors to get into the PMC, in addition to all of the stuff that we did the other day.  With all of this stuff we've got the beam hitting the 1st PMC mirror. We still don't have the EOM and AOM in the beam path however.

To get the rough alignment that we did, we turned on the new 2W NPRO, operating at the minimum power we could see on a card.  We turned it off after use, so it is still off.  Steve, we left the cable for the interlock sitting on the PSL table on the NW corner....can you please hook it up tomorrow?  Also, after the interlock is installed we should go back to regular running laser hazard mode. 

 

 

  3512   Thu Sep 2 01:48:23 2010 JenneFrogsTreasureNot cool....

This totally creeped me out when I found it wandering around on the floor not so far from my desk:

CreepyBug.jpg

  3523   Fri Sep 3 23:42:34 2010 JenneUpdatePSLPSL update of the day

Rana and I were poking around on the PSL table today, getting a few more items raised to the correct height.

I checked the polarization state of the new NPRO by using a HWP to minimize the transmission through a PBS cube, and then compared the power transmitted through the cube vs. reflected.  When the NPRO current was 0.772 \pm 0.001 (as read on the LCD), the transmission through the cube was 1.44mW, while the reflected was 10.53mW.  The reading of the Ophir power meter with no incident light was 0.03mW.  This factor of 10 means that the NPRO beam is ~10% circularly polarized and ~90% linearly polarized.  In order to improve the beam, we need a Quarter Wave Plate, which it turns out we don't have.  We need a QWP!

After that, using the linearly polarized part of my beam (maximizing the transmission through the PBS by rotating my HWP by 45deg), I tried to tune the angle of the polarizers that Rana pulled out of the MOPA.  I think I'm confused / too tired, because I can only get the polarizer to reflect a bunch of light, and I can't get it to pass any significant amount of light through, no matter where in its actuation range I put it (It's on a rotation stage with a few degrees of range).  It should just be a Brewster's Angle thing, and since I already have P-pol coming through the BS cube, this shouldn't be so hard.....

In any case, it may not be useful to do the final fine tuning of these polarizers until they are in their final places.  The hacky stack of mounts that I have has some slop in the position / alignment of the base of the polarizer, so no matter what we'll have to redo the tuning after the mounts are finalized.

  3734   Mon Oct 18 11:22:13 2010 JenneUpdateComputersShame on people not elogging! FrameFiles backups not working.

On the one hand, SHAME ON ALL PEOPLE WHO DON'T ELOG THINGS, such as the moving of scripts directories (it was a pain to figure out that that's part of why the backup scripts are broken).  On the other hand, the moving of the scripts directories brought to light a critical problem in the backup scheme. None of the frame files have been backed up since Joe replaced fb40m with fb, on ~23 Sept (I think).

What went down:

The frame builder was replaced, and no backup script was started up on the new machine.  Sadface.  Crontab doesn't work yet on the new machine, and also the 'ssh-add' commands give an error:

controls@fb /cvs/cds/rtcds/caltech/c1/scripts/backup $ ssh-add ~/.ssh/id_rsa
No such file or directory
controls@fb /cvs/cds/rtcds/caltech/c1/scripts/backup $ ssh-add ~/.ssh/backup2PB 
No such file or directory

Thus, I know that the backup was never running on the new fb.  However, the check-er script runs on nodus, and looks at the logfile, and since there was no script running, it wasn't adding to the log file, so the last log was an "Okay, everything worked" entry.  So, the check-er script kept sending me daily emails saying that everything was okie-dokey. 

Since all of the scripts were moved (Joe said this happened on Friday, although there's no elog about it), the check-er script, and all of the rest of the backup scripts point to the wrong places (the old scripts/backup directory), so I didn't receive any emails about the backup either way (usually it at least sends a "Hey, I'm broken" email).  This clued me in that we need to check things out, and I discovered that it's all gone to hell.

Since I can't add the ssh clients to the new fb, I can't actually log in to the backup computers over in Powell-Booth to check when the last legitimately successful backup was. But I suspect it was just before the fb was replaced.

So, we need to get Crontab up and running on the new Frame Builder machine so that we can run cron jobs, and we also need to figure out this backup hullabaloo.  I think I'll email / call Dan Kozak over in downs, who was talking about upgrading our backup scheme anyway.

 

  3736   Mon Oct 18 17:16:30 2010 JenneUpdateSUSOld PRM, SRM stored, new PRM drag wiped

[Jenne, Suresh]

We've put the old PRM and SRM (which were living in a foil house on the cleanroom optical table) into Steve's nifty storage containers.  Also, we removed the SRM which was suspended, and stored it in a nifty container.  All 3 of these optics are currently sitting on one of the cleanroom optical tables.  This is fine for temporary storage, but we will need to find another place for them to live permanently.  The etched names of the 3 optics are facing out, so that you can read them without picking them up.  I forgot to note the serial numbers of the optics we've got stored, but the old optics are labeled XRM ###, whereas the new optics are labeled XRMU ###. 

Koji chose for us PRMU 002, out of the set which we recently received from ATF, to be the new PRM.  Suresh and I drag wiped both sides with Acetone and Iso, and it is currently sitting on one of the rings, in the foil house on the cleanroom optical table.

We are now ready to begin the guiderod gluing process (later tonight or tomorrow).

  3741   Tue Oct 19 15:14:51 2010 JenneUpdateSUSPRM (little) update

[Jenne, Suresh]

We've aligned the guiderod and wire standoff to the PRM, each partly.  They have both been aligned to the correct distance above the scribe lines, but they have not yet been centered forward/backward along the thickness of the optic.  So, we're working on it...

  3761   Fri Oct 22 15:06:43 2010 JenneUpdateSUSArts and Crafts!

This afternoon I epoxied the guiderod and wire standoff to the new PRM.  I also epoxied the magnets that Suresh picked out to the dumbbell standoffs.  We'll let them all cure over the weekend, and then I'll glue the magnets to the optic on ~Monday.

Notes about the epoxy: 

Previously, we had been using the "AN-1" epoxy, which is gray, with a clear hardener.  Bob recommended we switch to "30-2", which is clear with clear, and has been chosen for use in aLIGO.  Both were vacuum approved, but the 30-2 has gone through ~2 months of testing at the OTF (Optics Test Facility?) over in Downs under vacuum, to check the level of outgassing (or really, non-outgassing).

The 30-2 is less viscous than the AN-1, and it takes less glue to do the same job, so we should keep that in mind when applying the epoxy.  When I put the glue next to the guiderod and standoff, it got wicked along the length of each rod, which is good.  I can't reach the whole length of the rod with my glue applicator because the fixture holding them in place blocks access, so the wicking is pretty handy.

 

I've also added the updated version of my Status Table for the suspensions.