  15225   Wed Feb 26 17:17:17 2020 YehonathanUpdate Arms DC loss measurements{Yehonathan, Gautam}

In order to measure the loss in
the arm cavities in reflection, we use the
 6x 
  15224   Tue Feb 25 19:58:06 2020 HangUpdateIOOMC2 coil balancing[Yehonathan, Hang]

We did some quick DC balancing
of the MC2 coil drivers to reduce the l2a
  
  15223   Tue Feb 25 16:17:57 2020 Gautam, HangUpdateCDS Seems that the GPS is out of sync on donatella.
We could not get any data from diaggui...
  
  15222   Mon Feb 24 08:36:32 2020 ChubUpdateGeneralHVAC repairThe HVAC people replaced a valve and repaired
the pneumatic plumbing on the roof air handler. 
Temperature has been stable during the day
  
  15221   Sun Feb 23 18:15:22 2020 ranaUpdateALSALS OOL noise and PDHto
make the comparisons meaningfully
  
  15220   Fri Feb 21 20:44:18 2020 shrutiUpdateALSALS OOL noise and PDH[Meenakshi, Shruti]

In order to adjust the relative
phase for PDH locking, we used the Siglent
 ALSNoise.pdfIMG_0086.jpg 
  15219   Fri Feb 21 13:02:53 2020 KojiUpdateALSPDH error signals?Check out this elog:
ELOG
4354
  
  15218   Fri Feb 21 10:59:08 2020 shrutiUpdateALSPDH error signals?   IMG_0082.jpgIMG_0083.jpgIMG_0084.jpgIMG_0085.jpg 
  15217   Wed Feb 19 22:20:22 2020 ranaUpdateALSALS OOL noise with arms lockedCould you please put physical units on
the Y-axis and also put labels in the legend
which give a physical description of what
  
  15216   Tue Feb 18 18:14:59 2020 shrutiUpdateALSALS OOL noise with arms lockedWe proceeded with the trying to measure
the ALS out-of-loop noise of the X arm when
the X arm cavity is green-locked using different
 ALSNoise.pdf 
  15215   Sat Feb 15 12:56:24 2020 YehonathanUpdateIOOIMC Transfer function measurement{Yehonathan, Meenakshi}

We measure the IMC transfer function
using SR785.
 IMCFrequencyResponse.pdfIMCRingdownNormalizedRawdata.pdfIMCREFLPDFits.pdf 
  15214   Fri Feb 14 14:52:41 2020 gautamUpdateALSALS OOL noise with arms lockedUnlikely, the alignment was probably just
not good. I restored the alignment and now
the arms can be locked to IR frequency.
  
  15213   Fri Feb 14 14:02:13 2020 shrutiUpdateALSALS OOL noise with arms locked[Meenakshi, Shruti]

Even though we were not able to
lock the the IR beat (by enabling LSC) during
 819472_10.pdf225642_10.pdf693500_10.pdf 
  15212   Fri Feb 14 00:53:50 2020 gautamUpdateALSFast ALS - more setupIn the process of setting up some cabling
at 1Y2, I must've bumped a cable to the
c1lsc expansion chassis. Anyways, the c1lsc
 CMSlow_ALSnoise.pdfOLTFmeas.pdf 
  15211   Thu Feb 13 21:30:55 2020 shrutiUpdateALSALS OOL noise with arms locked[Meenakshi, Gautam, Shruti]

Summary:

- We initially aligned the arm
 20200213_ALS.pdf 
  15210   Thu Feb 13 02:07:26 2020 gautamUpdateLSCAO path transfer function measurementSummary:

I measured the transfer function
of the AO path, and think that there are
 AOpathTF.pdfIMCinLoop.pdf 
  15209   Thu Feb 13 01:47:39 2020 gautamUpdateALSFast ALS - delay line prepA few years ago, Koji and I setup a delay
line phase shifter, which can be used to
impart a (switchable) delay to a signal path.
 delaySlider.pngdelayLineLosses.pdfdelayLineCal.pdf 
  15208   Wed Feb 12 12:13:37 2020 gautamUpdateLSCAO path attemptsSummary:


​The
PRFPMI can be controlled by a mix of ALS
 CARM_OLTF.pdfPRFPMI_errSigs.pdf 
  15207   Tue Feb 11 19:11:35 2020 shrutiUpdateComputer Scripts / ProgramsMATLAB on donatellaTried to open MATLAB on Donatella and found
the error:


MATLAB is selecting
  
  15206   Tue Feb 11 16:39:00 2020 shrutiUpdateALSAM/PMThe results of the AM/PM measurements:


Attachment 1: Traces
of 9 AM TFs overlaid on top of each other,
 AM.pdfPM.pdfRatio_all.pdfRatios_FM_PM.pdfRatio_all_new.pdf 
  15205   Mon Feb 10 15:55:46 2020 JordanUpdatePSLPMCTRANSPD[Gautam, Jordan]

Gautam showed me how the PMCTRANSPD
signal was reading zero, and he suspected
 ADC1.jpg 
  15204   Mon Feb 10 15:54:47 2020 JordanUpdatePSLCompleted Acromag WiringAll spare channels on the PSL acromag chassis
are connected with ~12in of spare wiring
for future use.
  
  15203   Mon Feb 10 15:04:42 2020 JordanUpdateGeneralHDMI Routing for new tv Ran HDMI to the new tv mounted on the north
wall of control room.
  
  15202   Mon Feb 10 10:07:20 2020 gautamUpdatePSLPMC re-lockedI found the PMC unlocked this morning.
It was re-locked using the usual procedure.
I feel like this has been happening more
 PMCunlock.png 
  15201   Mon Feb 10 09:40:54 2020 Larry WallaceSummaryGeneralSolidWorks Computer Upgrade and Printer repairOn February 5, 2020, the Dell engineering
workstation located in the 40M lab, was
replaced with a newer Engineering workstation,
  
  15200   Fri Feb 7 19:39:10 2020 KojiUpdateLSCMore high BW POY experimentsThis measurement tells you how the gain
balance between the SLOW_CM and AO paths
should be. Basically, what you need is to
  
  15199   Fri Feb 7 15:00:16 2020 gautamUpdateLSCMore high BW POY experimentsTo study the evilution of the AO path TFs
a bit more, I've hooked up POY11_Q Mon
to IN1 of the CM board. I will revert the
 AO_TFs.pdf 
  15198   Fri Feb 7 12:58:25 2020 YehonathanUpdateGeneralMetal PMC partsI took the metal PMC box and examined its
content and find the following items:

 18x 
  15197   Fri Feb 7 09:45:03 2020 shrutiUpdateGeneralAM at X endI took a few AM TF measurements at the
X end for which I:


Misaligned the ITMX (then
  
  15196   Fri Feb 7 02:41:28 2020 KojiUpdateGeneraloffice area temperatureNot sure what's wrong, but the workstation
desk is freezing cold again and the room
temp is 18degC (64degF).
  
  15195   Fri Feb 7 02:24:24 2020 gautamUpdateLSCSome short notes[koji, gautam] 

Plots + interpretation tomorrow.


CM_Slow path can be used
  
  15194   Thu Feb 6 21:54:13 2020 JonUpdatePSLc1psl bench testing completeToday I engineered the last piece
of the new c1psl system: the multi-bit
binary output (mbbo) channels that control
  
  15193   Thu Feb 6 16:14:44 2020 ranaUpdateGeneraloffice area temperatureI changed the office area thermostate
near Steve's desk from 68F to 73F
today. Please
  
  15192   Thu Feb 6 01:25:50 2020 gautamUpdateLSCLocking updatesSummary:

I managed to partially stabilize
the arm citculating powers - they stay in
 semiStableArms.pngarmAngStability.png 
  15191   Thu Feb 6 01:16:58 2020 gautamUpdateLSCDiagnosis resultsSummary:

I did some more detailed tests
to see if I could isolate where the excess
 IMCspec_ALS.pdfIMCspec_ALS_smallSpan.pdf 
  15190   Wed Feb 5 21:13:17 2020 YehonathanUpdateIOOIMC Ringdowns extended data analysisI translate the results obtained in the
previous elog to the IMC 3 mirror cavity.
I assume the loss in each mirror in the IMC
  
  15189   Wed Feb 5 21:04:10 2020 YehonathanUpdatePSLBench testing of PSL ai channels{Yehonathan, Jon}

We retested the failed ai channels.
Most of them got fixed by applying the inverse
  
  15188   Wed Feb 5 16:35:12 2020 gautamUpdateLSCDiagnosis planThe goal is to try and identify the source
of the excess ALS noise as the CARM offset
is reduced. The idea is to look at the MC_F
 ALSnoise.pdf 
  15187   Wed Feb 5 08:57:11 2020 YehonathanUpdatePSLBench testing of PSL ai channelsI checked the failed channels against
the EPICS database definitions and the yaml
file inputted to IFOTest. The channels where
  
  15186   Tue Feb 4 18:13:01 2020 YehonathanUpdatePSLBench testing of PSL ai channels{Yehonathan, Jon, Jordan}

I tested the ai channels of the
new PSL Acromag by looping an already-tested
 c1psl_wire_testing_-_By_Connector.pdf 
  15185   Tue Feb 4 02:13:02 2020 gautamUpdateLSCLocking updatesSummary:

The CARM-->RF transition remains
out of reach. No systematic diagnosis scheme
 modifiedOutMat.pngOLTFs.pdf 
  15184   Mon Feb 3 15:22:39 2020 JonUpdatePSLc1psl progress/Acromag ADC groundingI tested the c1psl AO channels on the electronics
bench on Friday. While I found all the wiring
to be correct, some of the channels exhibited
  
  15183   Mon Feb 3 13:54:10 2020 YehonathanUpdateIOOIMC Ringdowns extended data analysisI extended the ringdown data analysis to
the reflected beam following Isogai
et al.
 IMCTransReflAnalysis_anotated.pdf 
  15182   Fri Jan 31 16:57:09 2020 gautamUpdateGeneralMetal PMC partsJon brought over a box of parts for constructing
the metal PMCs. I have stored it along the
Y-arm, on top of the green optics cabinet.
  
  15181   Fri Jan 31 16:04:30 2020 gautamUpdateIOOInput pointing driftOne factor which hampers locking efforts
is the apparent drift of the input beam into
the IFO. Over timescales of ~1 hour, I have
 IPdrift.pdfIPdrift_PRMI.pdf 
  15180   Thu Jan 30 22:02:42 2020 shrutiUpdateGeneraldelay line frequency discriminator for PMI could not find any level 3 mixers, but
by adjusting the beat frequency the power
in each of the delay line channels rose to
 Figure_2.png 
  15179   Thu Jan 30 17:41:10 2020 gautamUpdatePSLErrant FSS_INOFFSET changeYou can trend the data for the past few
hours and see what the appropriate value.
I think
  
  15178   Thu Jan 30 17:31:28 2020 JonUpdatePSLErrant FSS_INOFFSET changeA script I was testing errantly set C1:PSL-FSS_INOFFSET
=> 10 V at about 5:30 pm. I manually reverted
the channel value to 0, but I don't know
  
  15177   Thu Jan 30 15:24:10 2020 ?UpdateGeneraldelay line frequency discriminator for PMyes, its fine to use this
with a level 3 or level 7 mixer; let's
  
  15176   Thu Jan 30 12:52:10 2020 JonUpdateBHDMetal OMCs procuredLast night Yehonathan and I located the
two steel PMCs in the QIL, with help from
Anchal. They are currently sitting on my
  