40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 55 of 339  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  14335   Fri Dec 7 17:04:18 2018 gautamUpdateIOOIMC transmission
Power just before PSL shutter on
PSL table = 97
  
  14334   Fri Dec 7 12:51:06 2018 gautamUpdateIMCIMC ringdown fittingI started putting together some code to
implement some ideas we discussed at the
Tuesday meeting here. Pipeline isn't
 time_reflAndTrans.pdfcorner_transOnly.pdfcorner_reflAndTrans.pdf 
  14333   Thu Dec 6 17:33:33 2018 JonOmnistructureGeneralN2 line disconnectedI believe I finally have the N2 gauge working
correctly. The wiring is unchanged from its
original state and the controller has been
  
  14332   Thu Dec 6 11:16:28 2018 aaronUpdateOMCOMC channelsI need to hookup +/- 24 V supplies to the
OMC whitening/dewhitening boxes that have
been added to 1X2.
  
  14331   Tue Dec 4 18:24:05 2018 gautamOmnistructureGeneralN2 line disconnected[jon, gautam]

In the latest installment in this
puzzler: turns out that maybe the trend of
 IMG_7195.JPG 
  14330   Tue Dec 4 10:38:12 2018 JonOmnistructureUpgradeUpdated Feedthrough List for Vacuum Acromag ChassisBased on new input from Chub, attached
is the revised list of signal cable
feedthroughs needed on the vacuum system
 acromag_chassis_feedthroughs.pdf 
  14329   Sun Dec 2 19:32:35 2018 ranaUpdateIOOfit timesneed to vary start/stop times in fit to
test for systematics
  
  14328   Sun Dec 2 17:26:58 2018 gautamUpdateIMCIMC ringdown fittingRecently we wondered at the meeting what
the IMC round trip loss was. I had done several
ringdowns in the winter of 2017, but because
 tauTheoretical.pdfringdownFit.pdfringdownScatter.pdfcavPole.pdf 
  14327   Sun Dec 2 16:08:44 2018 JonOmnistructureUpgradeFeedthroughs for Vacuum Acromag ChassisBelow is an inventory of the signal
feedthroughs that need to be installed on
the vacuum Acromag crate this week.
  
  14326   Fri Nov 30 19:37:47 2018 gautamUpdateLSCLSC feedforward block diagramI wanted to set up an RTCDS model to understand
this problem better. Attachment #1 is the
simulink diagram of the signal flow. The
 LSC_FF_tester.pngScreenshot_from_2018-11-30_19-41-07.pngScreenshot_from_2018-12-10_15-31-23.pngSimLSC.png 
  14325   Fri Nov 30 15:53:52 2018 JonOmnistructureGeneralN2 pressure gauge fixI've made a repair to the N2 pressure
monitor. I don't believe the polarity
of the analog signal into the controller
 N2_transducer_datasheet.pdf 
  14324   Thu Nov 29 17:46:43 2018 gautamUpdateGeneralSome to-dos[koji,
gautam, jon, steve]


We suspect analog voltage
  
  14323   Thu Nov 29 08:13:33 2018 SteveUpdatePEMEQ 3.9m So CAEQ did not trip anything. atm1

Just
a REMINDER:
our vacuum system is at atm to help the vacuum
 3.9mSoCA.pngVac_as_today.pngas_is.png 
  14322   Tue Nov 27 17:06:51 2018 SteveConfigurationVACAgilent 84FS turbo installed as TP2Chub & Steve,   
  14321   Tue Nov 27 10:50:20 2018 SteveUpdatePEMearth quake MexicoNothing tripped.

 
 5.5M.Mexico.png 
  14320   Mon Nov 26 21:58:08 2018 JonOmnistructure Serial Vacuum SignalsAll the serial vacuum signals are now interfaced
to the new digital controls system. A set
of persistent Python scripts will query each
 GP307_relays.jpeg 
  14319   Mon Nov 26 17:16:27 2018 gautamUpdateSUSEY chamber work[steve,
rana, gautam]


PSL and EY 1064nm laser
 IMG_5251.JPG 
  14318   Mon Nov 26 15:58:48 2018 SteveUpdateVACVent 81Gautam, Aaron, Chub & Steve,

ETMY heavy door replaced by light
one.
  
  14317   Mon Nov 26 15:43:16 2018 aaronUpdateOMCOMC scanning/aligning scriptI've started testing the OMC channels
I'll use.

I needed to update the model, because
 c1omc.png 
  14316   Mon Nov 26 10:22:16 2018 aaronUpdateGeneralprojector light bulb replacedI replaced the projector bulb. Previous
bulb was shattered.
  
  14315   Sun Nov 25 17:41:43 2018 JonOmnistructure Vacuum Controls Upgrade - Status and PlansNew hardware has been installed in the
vacuum controls rack. It is shown in the
below post-install photo.
 rack_photo.jpg 
  14314   Wed Nov 21 16:48:11 2018 gautamUpdateCOCEY mini cleanroom setupWith Chub's help, I've setup a
mini cleanroom at EY - Attachment
#1. The HEPA unit is running on
 IMG_7174.JPG 
  14313   Wed Nov 21 09:59:26 2018 gautamUpdateLSCLSC feedforward block diagramAttachment
#1 is a block diagram depicting
the pathway by which the vertex DOF control
 IMG_7173.JPG 
  14312   Tue Nov 20 20:33:11 2018 aaronUpdateOMCOMC scanning/aligning scriptI finished running the cabling for the
OMC, which involved running 7x 50ft DB9 cables
from the OMC_NORTH rack to the 1X2 rack,
 pathwaysketch.pdfIMG_0094.JPGIMG_0097.JPG 
  14311   Tue Nov 20 17:38:13 2018 ranaUpdateUpgradeNew Coffee MachineRana, Aaron, Gautam

The
  
  14310   Tue Nov 20 13:13:01 2018 gautamUpdateVACIMC alignment is okayI checked the IMC alignment following the
vent, for which the manual beam block placed
on the PSL table was removed. The alignment
  
  14309   Mon Nov 19 23:38:41 2018 JonOmnistructure Vacuum Acromag Channel AssignmentsI've completed bench testing of all
seven vacuum Acromags installed in a custom
rackmount chassis. The system contains
 Binary_IO_Channel_Assignments.pdf 
  14308   Mon Nov 19 22:45:23 2018 JonOmnistructure Vacuum System SubnetworkI've set up a closed subnetwork for
interfacing the vacuum hardware (Acromags
and serial devices) with the new controls
  
  14307   Mon Nov 19 22:01:50 2018 gautamUpdateVACLoose nut on valveAs I was turning off the lights in the
VEA, I heard a rattling sound from near the
PSL enclosure. I followed it to a valve -
 IMG_7171.JPG 
  14306   Mon Nov 19 17:09:00 2018 SteveUpdateVACVent 81Gautam, Aaron, Chub and Steve,




 beforeVent82.pngvent81completed.png 
  14305   Mon Nov 19 14:59:48 2018 ChubUpdateVACVent 81Vent 80 is nearly complete; the instrument
is almost to atmosphere.  All four ion
pump gate valves have been disconnected,
  
  14304   Sun Nov 18 17:09:02 2018 gautamUpdateGeneralVent prepVent prep

Following the checklist,
I did these:
 VentPrepNov2018.pngMCautolocker_lowPower.pngIMG_7163.JPG 
  14303   Sun Nov 18 00:59:33 2018 gautamUpdateGeneralVent prepI've begun prepping the IFO for the
vent, and completed most of the IFO related
items on the checklist.
  
  14302   Sat Nov 17 18:59:01 2018 aaronUpdateIOOIMC problematicI made additional measurements on the x
and y arms, at 5 offset positions for each
arm (along with 6 measurements at the "zeroed"
  
  14301   Fri Nov 16 15:09:31 2018 SteveConfigurationVACnot venting cryo and ion pumpsNotes on the ion pumps and cryo pump:



Our
4 ion pumps were closed off for a lomg time.
I estmated their pressure to be around ~1
  
  14300   Fri Nov 16 10:53:07 2018 aaronUpdateIOOIMC problematicBack to loss measurements.

I replaced the PD I've been
using for the AS beam.
 Screenshot_from_2018-11-16_19-22-34.png 
  14299   Fri Nov 16 10:26:12 2018 SteveUpdateVAC single viton O-ringsThe 40m vacuum envelope has one large single
O-ring on the OOC west side. All other doors
have double O-ring with annuloses.
 Single-O-ring.png 
  14298   Fri Nov 16 00:47:43 2018 gautamUpdateLSCMore DRMI characterizationSummary:


More DRMI characterization
was done.
I was working on trying
 PRCff.pdfDRMI_withPRCff.png 
  14297   Thu Nov 15 10:21:07 2018 aaronUpdateIOOIMC problematicI ran a BNC from the PD on the AS table
along the cable rack to a free ADC channel
on the LSC whitening board. I lay the BNC
 181115_chansDown.pngPD_noise.png 
  14296   Wed Nov 14 21:34:44 2018 JonOmnistructure Vacuum Acromags installed and testedAll 7 Acromag units are now installed in
the vacuum chassis. They are connected to
24V DC power and Ethernet.
 IMG_3003.jpg 
  14295   Wed Nov 14 18:58:35 2018 aaronUpdateDAQNew DAC for the OMCI began moving the AA and AI chassis over
to 1X1/1X2 as outlined in
the elog.
 6D079592-1350-4099-864B-1F61539A623F.jpeg5868D030-0B97-43A1-BF70-B6A7F4569DFA.jpeg 
  14294   Wed Nov 14 14:35:38 2018 SteveUpdateALARM emergency calling list for 40m Lab It is posted at the 40m
wiki with Gautam' help. Printed copies
posted around doors also.
  
  14293   Tue Nov 13 21:53:19 2018 gautamUpdateCDSRFM errorsThis
problem resurfaced, which I noticed when
I couldn't get the single arm locks going.
 RFMerrors.png 
  14292   Tue Nov 13 18:09:24 2018 gautamUpdateLSCInvestigation of SRCL-->MICH couplingSummary:

I've been looking into the
cross-coupling from the SRCL loop control
 TF_sweptSineMeas.pdfdigitalDemod.pdfdigitalDemod_hist.pdfDRMI_LSCspectrogram.pdf 
  14291   Tue Nov 13 16:15:01 2018 SteveUpdateVACrga scan pd81 at day 119 

 
 pd81-d119.pngpd81-560Hz-d119.png 
  14290   Mon Nov 12 13:53:20 2018 ranaUpdateIOOloss measurement: oscope vs CDS DAQsstop using the ssscope, and just put the
ssssignal into the DAQ with sssssome whitening.
You'll get 16 bitsśšß.
  
  14289   Sat Nov 10 17:40:00 2018 aaronUpdateIOOIMC problematicGautam was doing some DRMI locking, so
I replaced the photodiode at the AS port
to begin loss measurements again.
  
  14288   Sat Nov 10 17:32:33 2018 gautamUpdateLSCNulling MICH->PRCL and MICH->SRCLWith the DRMI locked, I drove a line in
MICH using the sensing matrix infrastructure.
Then I looked at the error points of MICH,
 sensMat_2018-11-10.pdf 
  14287   Fri Nov 9 22:24:22 2018 JonOmnistructure Wiring of Vacuum Acromag Chassis CompleteWiring of the power, Ethernet, and indicator
lights for the vacuum Acromag chassis is
complete. Even though this crate will only
 IMG_2987.jpgIMG_2985.jpgIMG_2986.jpg 
  14286   Fri Nov 9 15:00:56 2018 gautamUpdateIOONo IFO beam as TT1 UL hijacked for REFL55 checkThis
problem resurfaced. I'm doing the
debugging.
 REFL55_wht_chk.png 
ELOG V3.1.3-