  15038   Wed Nov 20 12:14:17 2019 gautamUpdateLSCLocking - progressI took a look at the TRX/TRY RIN reported
in the single arm POX/POY lock, and compared
the performance of the two available PDs
 TRX_TRY_comparison.pdf 
  15037   Wed Nov 20 01:07:18 2019 gautamUpdateLSCLocking - progressSummary:


CARM offset was reduced
to 0 with the PRMI locked.
TRY
 PRFPMI.png 
  15036   Tue Nov 19 21:53:57 2019 gautamUpdatePEMFollow-up on seismometer discussionThe shaking started earlier today than
yesterday, at ~9pm local time.

While the IFO is shaking, I thought
 seisxSpec.pdf 
  15035   Tue Nov 19 15:08:48 2019 gautamUpdateCDSVertex models rebootedJon and I were surveying the CDS situation
so that he can prepare a report for discussion
with Rolf/Rich about our upcoming BHD upgrade.
 armSat.png 
  15034   Mon Nov 18 21:04:38 2019 gautamUpdateLSCLocking - some ideasSome ideas Koji suggested:


Try approaching the CARM
offset zero point "from the other side"
  
  15033   Mon Nov 18 16:32:15 2019 gautamUpdateComputersZITA: started upgrade from Ubuntu 14 LTS to 18 LTSthe upgrade seems to have been successfully
executed - the machine was restarted at ~430pm
local time. Projector remains off and diagnostic
  
  15032   Mon Nov 18 14:32:53 2019 gautamUpdatePEMFollow-up on seismometer discussionThe nightly seismic activity enhancement
continued during the weekend. It always shows
up around 10pm local time, persists for ~1
  
  15031   Fri Nov 15 18:59:08 2019 ranaUpdateComputersZITA: started upgrade from Ubuntu 14 LTS to 18 LTSand so it begins...until this is finished
I have turned off the projector and moved
the striptools to the big TV (time to look
  
  15030   Fri Nov 15 12:16:48 2019 gautamUpdatePEMFollow-up on seismometer discussionAttachment
#1 is a spectrogram
 BS_ZspecGram.pdf.zip 
  15029   Fri Nov 15 12:08:04 2019 gautamUpdateLSCPOPDC whitening boardThe DC port of the Bias-Tee is routed to
(a modified
version of) the iLIGO whitening board.
  
  15028   Fri Nov 15 11:58:12 2019 gautamUpdateLSCoff the bad Violin filtersThe clue was that the loop X arm POX loop looked
to have low (<3dB)) gain margin around
600 Hz (and again at 700 Hz). 
 violinFix.pdfnewViolinConfig.png 
  15027   Fri Nov 15 00:18:41 2019 ranaUpdatePEMFollow-up on seismometer discussionThe large ground motion at 1 Hz started
up again tonight at around 23:30. I walked
around the lab and nearby buildings with
 MCshake.pdf 
  15026   Thu Nov 14 23:56:18 2019 ranaUpdateLSCoff the bad Violin filtersWe turned off many excessive violin mode
bandstop filters in the LSC.

Due to some feedforward work by
 out.pdf 
  15025   Thu Nov 14 12:11:04 2019 ranaUpdatePEMFollow-up on seismometer discussionat 1 Hz' this effect is not large so
that's real translation. at lower frequencies
a ground tilt couples to the horizontal sensors
  
  15024   Wed Nov 13 23:40:15 2019 gautamUpdatePEMFollow-up on seismometer discussionHere is some disturbance
in the spacetime curvature, where the local
 seisAll_20191111_1Hz.pdf 
  15023   Wed Nov 13 20:15:56 2019 ranaUpdatePEMFollow-up on seismometer discussionthis
is due to the Equivalence Principle: local
  
  15022   Wed Nov 13 19:34:45 2019 gautamUpdatePEMFollow-up on seismometer discussionAttachment
#1 shows the spectra
 seisAll_20191111.pdfffPotential.pdf 
  15021   Thu Nov 7 17:55:37 2019 shrutiUpdateComputer Scripts / ProgramsPython packages on donatellaToday I realized that pip and other python2,3
packages were installed in the conda base
environment, so after running
  
  15020   Thu Nov 7 17:46:10 2019 shrutiUpdateALSAM measurement at X endSome details:

- There
was a SR560+SR785 (not connected for measurement)
placed near the X end which I moved; it is
 AMTF20191107.png 
  15019   Wed Nov 6 20:34:28 2019 KojiUpdateIOOPower combiner loss (EOM resonant box installed)Gautam and I were talking about some modulation
and demodulation and wondered what is the
power combining situation for the triple
 power_combiner.pdf 
  Draft   Wed Nov 6 20:34:08 2019 KojiUpdateIOOEOM resonant box installed 




  
  15017   Wed Nov 6 19:26:57 2019 gautamUpdatePSLSome PSL cable adminKoji and I taked about cleaning up some
of the flaky cable situation on the PSL table
a while ago. The changes were implemented
 PSLcableAdmin.jpg 
  15016   Wed Nov 6 17:45:34 2019 gautamUpdateLSC~Here is a comparison of the response of
various DoFs in our various RFPD sensors
for two different CARM offsets. Even in the
  
  15015   Wed Nov 6 17:05:45 2019 gautamUpdateLSCCARM calibrationSummary:

A coarse calibration of the CARM
error point (when on ALS control) is 
 CARMscan.pdfCARMcalib.pdfscan.hdf5.zip 
  15014   Wed Nov 6 02:08:48 2019 gautamUpdateLSCLocking updatesSummary:

There seems to be stronger-than-expected
coupling between CARM and the 3f sensors. 
  
  15013   Tue Nov 5 12:37:50 2019 gautamUpdatePEMT240 interface unit pulled outI removed the Trillium T240 DAQ interface
unit from 1X4 for investigation.

It
 T240_recenter.pdfffPotential.pdf 
  15012   Tue Nov 5 11:52:27 2019 gautamUpdateLSCLocking notesSummary:

I am still unable to achieve arm
powers greater than TRX/TRY ~10 while keeping
 PRMI3f_ALS_Nov4sensMat.pdf 
  15011   Mon Nov 4 19:02:25 2019 YehonathanUpdatePSLMapping the PSL electronicsI created a spreadsheet (Attached) by taking Koji's
c1psl sheet from slow_channel_list and filtering
out the channels that do not need an Acromag.
 PSL_Wirings_-_Sheet1_(1).pdf 
  15010   Mon Nov 4 16:06:58 2019 gautamUpdateLSCPOP optical pathI did some re-alignment of the POP beam
on the IX in air table. Here are the details:


 IMG_8027.JPGlensRealignment.jpgPOPrealigned.pngPOPdither.pngPRMfixed.png 
  15009   Mon Nov 4 15:29:47 2019 gautamUpdateLSCPOP signal pathThere are many versions of the POP22 signal
path I found on the elog, e.g. this
thread. But what I saw at the LSC rack
 POPchain.pdf 
  15008   Mon Nov 4 13:26:04 2019 YehonathanUpdatePSLUp to date sketch of the 1x1 and 1x2 EurocratesDone.




  
  15007   Mon Nov 4 11:41:28 2019 shrutiUpdateComputer Scripts / ProgramsEpics installed on donatellaI've installed pyepics on Donatella
running

sudo yum install pyepics
  
  15006   Sat Nov 2 17:08:34 2019 YehonathanUpdatePSLUp to date sketch of the 1x1 and 1x2 EurocratesThanks. Please update this wiki page too.

https://wiki-40m.ligo.caltech.edu/Electronics/ElectronicsRacks#A1X1
  
  15005   Sat Nov 2 16:36:55 2019 YehonathanUpdatePSLUp to date sketch of the 1x1 and 1x2 EurocratesI reproduced Gautam's sketch of the
1x1 and 1x2 Eurocrates into a pdf image
that contains links to the appropriate DCCs
 1x1_1X2_Eurocrates_with_links.pdf 
  15004   Thu Oct 31 10:44:40 2019 gautamUpdatePSLPMC re-lockedPMC got unlocked at ~4am. I re-locked it.
Also tweaked the input pointing into the
cavity. The misalignment was mostly in pitch.
  
  15003   Wed Oct 30 23:12:27 2019 KojiUpdateSUSPRM suspension issuesSigh... hard loch   
  15002   Wed Oct 30 19:20:27 2019 gautamUpdateSUSPRM suspension issuesWhile I was trying to lock the PRMI this
evening, I noticed that I couldn't move
the REFL beamspot on the CCD field of view
 PRMUL.pdfPRMnormal.pdfPRM-Sensors_noise.pdfPRMsuspensionWonky.png 
  15001   Wed Oct 30 17:08:40 2019 gautamUpdateLSCPOP22 investigationThe POP beam coming out of the vacuum chamber
is split by a 50/50 BS and half is diverted
to the POP22/POP110/POPDC photodiode (Thorlabs
 POP22anomaly.pdf 
  15000   Wed Oct 30 11:53:41 2019 gautamUpdateLSCMICH loop shape tuningI changed the shape of the low pass filter
to reduce high frequency sensor noise injection
into the MICH control signal. The loop stability
 MICH_ELP.pdfMICH_ELP_TFs.pdf 
  14999   Wed Oct 30 01:27:00 2019 gautamUpdateLSCMore locking updatesTried a bunch of things tonight.


Modified the "ELP300"
filter module in the MICH filter bank - this
 POP_ASS.png 
  14998   Tue Oct 29 17:40:48 2019 gautamUpdateLSCMore locking updatesI set up a photodiode (PDA10CF) in the
IFO REFL beampath and the Agilent NA is sitting
on the east side of the PSL enclosure. This
 broadSweep.pdfzoomSweep.pdf 
  14997   Tue Oct 29 15:13:19 2019 gautamUpdateLSCMore locking updatesI looked at some signals for a 10 second
period when the PRMI was locked with at some
CARM offset, just before the PRMI lost lock,
 PRMI_lockloss.png 
  14996   Tue Oct 29 01:24:45 2019 gautamUpdateLSCMore locking updatesSummary:


The two arm lengths can
be controlled reliably in the CARM/DARM basis
 POP22_feature.pngPRMI3f_ALS_Oct21sensMat.pdf 
  14995   Mon Oct 28 23:20:11 2019 gautamUpdateALSALS power budget 


IR
  
  14994   Mon Oct 28 18:55:06 2019 ranaUpdateComputersrossa revivalback
on new Rossa from Xi computing


switched to using Display
  
  14993   Fri Oct 25 01:04:49 2019 gautamUpdateALSALS electronics chain was saturating[Koji, gautam]

Summary:

We think we got to the bottom of
  
  14992   Thu Oct 24 18:37:15 2019 gautamUpdatePEMT240 checkoutSummary:

The Trillium T240 seismometer
needs 
  
  14991   Thu Oct 24 11:58:16 2019 gautamUpdateASCPRC angular feedforwardSummary:

I'd like to revive the PRC
angular feedforward system. However,
 ffPotential.pdf 
  14990   Wed Oct 23 18:40:58 2019 gautamUpdateCDSanother round of vertex FE rebootsI wanted to restart the c1oaf model. As
usual, the first time the model was restarted,
it came back online with a 0x2bad error.
  
  14989   Wed Oct 23 11:49:21 2019 gautamUpdatePEMPEM BLRMS anomalyI looked into the seismometer situation
a bit more today. Here is the story so far
- I think more investigation is required:
 seisAll_20191021.pdfspecGrams.zip 