40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 47 of 344  Not logged in ELOG logo
Entry  Sun Jun 20 16:07:23 2010, Koji, Summary, COC, Calibration of the metrology lab interferometer ring1_inner_centering.pdfring1_outer_centering.pdfSRMU01_pic.png
Kiwamu and Koji
Summary
We have visited GariLynn's lab to make a calibration of the metrology interferometer. 
Entry  Wed Jun 23 12:28:34 2010, Razib, Summary, Phase Camera, Weeekly Summary trigger-box_circuit.pngtest1.png
This past week I have completed the following tasks:
 
1. Built a trigger and power box for the camera GC 750M (06058) and took some test images to see whether the trigger box really works. Result:
Entry  Wed Jun 23 15:15:53 2010, josephb, Summary, Computers, 40m computer security issue from last night and this morning 
The following is not 100% accurate, but represents my understanding of the events currently.  I'm trying to get a full description from Christian
and will hopefully be able to update this information later today.
 
Entry  Sat Jun 26 21:13:19 2010, rana, Summary, Computer Scripts / Programs, COMSOL 4.0 Installation 
I've installed COMSOL 4.0 for 32/64 bit Linux in /cvs/cds/caltech/apps/linux64/COMSOL40/
It
seems to work, sort of.

Notes:
Entry  Mon Jun 28 12:48:04 2010, josephb, Summary, CDS, CDS adapter board notes 
The following is according to the drawing by Ben Abbott found at http://www.ligo.caltech.edu/~babbott/40m_sus_wiring.pdf
This
applies to SUS:
Two ICS 110Bs.  Each has 2 (4 total) 44 shielded conductors going to DAQ Interface Chassis  (D990147-A).  See pages 2 and 4.
    Reply  Mon Jun 28 21:26:05 2010, rana, Summary, CDS, CDS adapter board notes 
Those drawings are an OK start, but its obvious that things have changed at the 40m since 2002. We cannot rely on these drawings to determine all of
the channel counts, etc.
I thought we had already been through all this...If not, we'll have to spend one afternoon going around and marking it all up.  
Entry  Wed Jul 7 00:15:29 2010, tara,Rana, Summary, PSL, power spectral density from RefCav transmitted beam  RIN_rftrans.pngtara.png
I measured the RC transmitted light signals here at the 40m. I made all connections through the PSL patch panel. 
Other than two steering mirrors in front of the periscope, and the steering
    Reply  Wed Jul 7 10:42:29 2010, Koji, Summary, PSL, power spectral density from RefCav transmitted beam  
How do you calibrate this to Hz/rtHz?


    
        
            Quote:
        
        
            
Entry  Fri Jul 9 11:41:58 2010, Gopal, Summary, Optic Stacks, Top Optic Layer Complete; Mechanical Tests Giving Problems 7x







                                                      
Entry  Fri Jul 9 20:16:19 2010, rana, Summary, PSL, Things I did to the PSL today: Refcav, PMC, cameras, etc. 
I re-aligned the beam into the PMC. I got basically no improvement. So I instead changed the .LOW setting so that PMCTRANS would no longer go yellow
and make the donkey sound.
I did the same for the MOPA's AMPMON because its decayed state is now nominal.
    Reply  Sun Jul 11 20:11:48 2010, rana, Summary, PSL, RC trend after the insulation removal rc.png

 
    Reply  Mon Jul 12 14:22:36 2010, Jenne, Summary, PSL, Things I did to the PSL today: Refcav, PMC, cameras, etc. 


    
        
            Quote:
        
        
            
            I re-aligned the beam into the PMC. I got basically no improvement. So I instead changed the .LOW setting so that
Entry  Tue Jul 13 21:04:49 2010, tara,rana, Summary, PSL, Transfer function of FSS servo TF_FSS_ser.png
 I measured FSS's open loop transfer function.

 For FSS servo schematic, see 
Entry  Wed Jul 14 01:05:27 2010, Sharmila,Katharine, Summary, elog, Maglev P7120284.JPGP7120278.JPGP7120281.JPGP7140292.JPG
Yesterday we hooked up the Quadrant Maglev control to the power supply to test the components in the Input/Output part of the circuit.
The output from the buffer was an unexpected high noise signal which was caused by some circuit components.
Entry  Wed Jul 14 12:12:03 2010, Razib, Summary, Phase Camera, Weekly update 
This week I was mainly interested in investigating the noise source at the phase camera. So having this issue in mind, my activities are the following:
1. I worked on producing multiple beat signal (1Hz and 5Hz). Elog entry.
2. I altered the setup so that instead of triggering the camera from the signal generator, we are now triggering it from the beat signal from the
Entry  Wed Jul 14 19:15:26 2010, Gopal, Summary, Optic Stacks, REVISION: Eigenfrequency Analysis of Single Stack Complete Eigenfrequency_1_Stack4.pngEigenfrequency_2_Stack4.pngEigenfrequency_2_Stack4.pngEigenfrequency_3_Stack4.pngEigenfrequency_4_Stack4.png
My previous eigenfrequency analysis was incorrect by two orders of magnitude due to the misuse of Young's Modulus information for Viton. After
editing this parameter (as documented on 7/14 19:00), the eigenmodes became much more reasonable. I also discovered the Deformation option under the
Surface Plotting Options, which makes the eigenmodes of the single stack much more apparant.
    Reply  Thu Jul 15 19:27:04 2010, rana, Summary, PSL, RC trend after the insulation removal Untitled.pnga.pngb.png

As you can see, there was not much (if any) worsening of the laser frequency fluctuation from removing the RefCav insulation. The plots below are
Entry  Mon Jul 19 21:47:36 2010, rana, Summary, DAQ, DAQ timing test 
Since we now have a good measurement of the phase noise of the Rb clock Marconi locked to the Rb clock, I wanted to use that to check
out the old DAQ system:
I used Megan's phase noise setup - Marconi #2 is putting out 11000013 Hz at 13 dBm into the ZP-3MH mixer. Marconi #1 is putting out 3 dBm at 11000000
Entry  Wed Jul 21 15:43:38 2010, Megan, Summary, PSL, Copper Layer Thickness on the Reference Cavity 
Using the equation for thermal resistance
Rthermal = L/(k*A)
where k is the thermal conductivity of a material, L is the length, and A is the surface area through which the heat passes, I could find the thermal
    Reply  Tue Jul 27 16:03:36 2010, rana, Summary, DAQ, DAQ timing test Untitled.png


    
        
            Quote:
        
        
            
            Since we now have a good measurement of the phase noise of the Rb clock
Entry  Tue Jul 27 16:33:50 2010, Koji, Summary, General, High school students tour IMG_2657.jpg
Jenne made the 40m tour for the annual visit of 30-40 students.
c.f.
Tour 2009 http://nodus.ligo.caltech.edu:8080/40m/1717
Entry  Thu Jul 29 12:13:28 2010, kiwamu, Summary, CDS, near term plan current_setup_v2.png
 [Joe and Kiwamu]
Entry  Thu Jul 29 12:31:09 2010, Koji, Summary, General, Lab Schedule PSL_work_schedule.pdf
July 
29 Thu BS chamber work: Move cable towers / green steering mirrors / (2 TTs with TT charactrization) / Put the heavy door by 5PM.
30 Fri Pumping down
Entry  Thu Jul 29 20:43:32 2010, Gopal, Summary, Optic Stacks, Modeling Tips and Tilts XTrans_XDisp.pngXTrans_XDisp.pngYTrans_XDisp.pngZTrans_XDisp.png
I have discovered a method of completely characterizing
the 6x6 response of all six types (x-,y-, and z- translational/rotational) of oscillatory disturbances at the base of the stack. 
 
Entry  Sat Jul 31 04:03:11 2010, Gopal, Summary, Optic Stacks, Complete Displacement Translational Transfer Function Matrix Progress_Report_2.png
Over the past 36 hours, I've run full-fledged FDAs on KALLO.
The transfer functions for translational drives and responses are neatly described by the attached transfer
function "matrix."
Entry  Sun Aug 1 21:04:45 2010, rana, Summary, Computer Scripts / Programs, MC Autolocker fixed 
Someone had left a typo in the MC autolocker script recently while trying to set the lock threshold to 0.09. As a result, the autlocker wouldn't run.
I repaired it, made a few readability improvements, and checked in the new version to the SVN. If you make script changes, check them in. If
you think its too minor of a change for a SVN checkin, don't do it at all.
Entry  Sun Aug 1 21:40:27 2010, rana, Summary, PSL, FSS: SLOWDC response Untitled.png
I bet you thought that the NPRO slow actuator response could be well represented by a pole at ~0.1 Hz? Well, that's just what they want you to believe.
I attach the response measured in FSS-FAST (with no feedback to the SLOW actuator) when the SLOW is given a step. As you may remember from
kindergarten, the response of a single pole low pass should just be an exponential. Clearly, there's more here than 1 pole.
    Reply  Fri Aug 6 17:47:36 2010, steve, Summary, General, cranes load tested at 1998 lbs 0.9ton.PDFP1060523.JPGP1060532.JPGP1060541.JPG


    
        
            Quote:
        
        
            
            
            
  
Entry  Sat Aug 7 10:47:38 2010, Koji, Summary, elog, elog restarted / source of the trouble eliminated 
Nancy notified me that the elog crashed. It was fixed.

I restarted elog, but it kept crashing. Some of the entries on Aug 6th caused the trouble.
I tried to refresh the pictures in entries 3376, 3377, 3378. Still it kept crashing.
Entry  Sat Aug 7 21:57:56 2010, rana, Summary, DMF, seisBLRMS restarted Untitled.png
The green xterm on op540m which is running the seisBLRMS DMF got stuck somehow ~3 days ago and lost its NDS connection. I closed the matlab session and
restarted it. Seismic trends are now back online.
    Reply  Tue Aug 10 22:40:55 2010, Koji, Summary, PEM, Accelerometer located on and below the PSL table PEM_100809.pdf
Result of the accelerometer measurement
Introduction

We wanted to characterize the PSL table before the work before its lifting up.
We put a set of three-axis Wilcoxon accelerometers on the ground and another set on the PSL table through the weekend.
Entry  Wed Aug 11 16:56:00 2010, Koji, Summary, Environment, Covering of the IFO IMG_2732.jpg
Katharine, Sharmila, Gopal, Kiwamu, Jenne, Aidan, Steve, and Koji
A guy from the carpenter shop has done the drilling work in the morning.
In the afternoon we wrapped the central part of the interferometer with plastic sheets in order to avoid the dusts from the tile ripping that will
Entry  Fri Aug 13 20:58:20 2010, Jenna, Summary, Electronics, Rubidium clock phase noise measurement 6x
 Here's an overview of the rubidium measurement:
Entry  Wed Aug 25 16:13:32 2010, steve, Summary, PEM, PSL optical table is back into operation at 32.75" level P1060764.JPGP1060768.JPGP1060777.JPGP1060776.JPGP1060780.JPG
The tile work was done yesterday after noon.
This morning Mike Gerfen and me lowered the enclosure frame to normal height.
Keven- janitor and I removed plastic covers from chambers, racks, SP, MC2 and clean tool boxes.
Entry  Mon Aug 30 13:57:25 2010, Koji, Summary, PSL, PSL table vibrational performance after the upgrade PEM_100830_SPE.pdfPEM_100830.pdf
Jenne and Koji
Last week Jenne has put the accelerometers on and under the PSL table immediately after the plastic sheets were removed.
So I took the same measurement as I did on 9th Aug.
    Reply  Mon Aug 30 18:22:00 2010, rana, Summary, PSL, PSL Enclosure is UNSTABLE 
The lifting and resetting of the BLUE PSL enclosure has made it unstable somehow. When I push on it a little it rocks back and forth a
lot.
Steve, please look into what's happening and stiffen it if you can. Its too unstable right now.
Entry  Thu Sep 2 14:11:17 2010, steve, Summary, PEM, south end crane balancing is completed P1060798.JPGP1060800.JPGP1060804.JPG
The crane I -beam now leveled at all degrees of rotation.  The lower hinge was moved southward  about 1/4 of an inch.  Performance was
tested at 2000 lbs
 
Entry  Wed Sep 8 11:56:24 2010, kiwamu, Summary, CDS, September CDS test plan 
 Joe and Kiwamu
We discussed about our CDS plan for this September. The summary of the plan and "to do list" are now on the wiki page;
http://lhocds.ligo-wa.caltech.edu:8000/40m/Upgrade_09/CDS/September_CDS_plan
Entry  Mon Sep 13 12:09:42 2010, kiwamu, Summary, General, elog restarted 
 Elog didn't respond, so I restarted it with the script.
Before killing the process somehow two elog daemons were running at the same time. I killed
those two manually. 
Entry  Wed Sep 15 14:34:57 2010, josephb, Summary, CDS, Plan for RFM switch over 
Steps for RFM switch over:
1) Ensure the new frame builder code is working properly:
   A) Get Alex to finish compiling the frame builder and test on Megatron.
Entry  Wed Sep 15 19:29:13 2010, valera, Summary, , PSL power budget 

    
        
             Location
           
 Power (mW)
        
        
             NPRO - after HWP
             252

       
        
             Rejected by input FI polarizer
             38
        
Entry  Thu Sep 23 02:23:04 2010, koji,tara, Summary, Electronics, Testing new TTFSS  
I tested the new table top frequency stabilization system(TTFSS), 
I haven’t finished it yet, and accidentally fried one amplifier in the circuit.
We received three sets of a new TTFSS system
Entry  Thu Sep 23 02:45:30 2010, Koji, Summary, Computers, nodus gracefully rebooted 
Zach> Nodus seemed to be working fine again, and I was browsing the elog with no 
Zach> problem. I tried making an entry, but when I started uploading a file it 
Zach> became unresponsive. Tried SSHing, but I get no prompt after the welcome 
Entry  Thu Sep 23 23:24:43 2010, rana, johnny, tara, Summary, PSL, AM modulate AOM to measure RefCav Thermo-Optic coefficient 
Big Johnny and I hacked a function generator output into the cross-connect of the 80 MHz VCO driver so that we could modulate the
amplitude of the light going into the RefCav. The goal of this is to measure the coefficient between cavity power fluctuations and the
apparent length fluctuations. This is to see if the thermo-optic noise in coatings behaves like we expect.
Entry  Wed Sep 29 12:08:28 2010, josephb, alex, Summary, CDS, Last burt save of old controls 
This is being recorded for posterity so we know where to look for the old controls settings.
The last good burt restore that was saved before turning off scipe25 aka c1dcuepics was on September 29, 11:07.
Entry  Tue Oct 5 11:42:20 2010, kiwamu, Summary, Green Locking, developing green locking plant green_sm3.png
 With a help from Joe, I made a diagram of the simulated plant for green locking in order to get better understanding and consensus.
Eventually these simulated plants will help us developing (sometimes debugging) the digital control systems.
Here is the diagram which tells us how we will setup and link the control/plant models and on which machine they will be running.
Entry  Tue Oct 5 18:27:18 2010, Joonho Lee, Summary, Electronics, CCD cable's impedence 
Today I checked the CCD cables which is connected to the VIDEOMUX.
17 cables are type of RG59, 8 cables are type of RG58. I have not figured out the type of other cables(23
cables) yet.
Entry  Wed Oct 6 00:32:01 2010, rana, Summary, DAQ, NDS2 
This is the link to the NDS2 webpage:
https://www.lsc-group.phys.uwm.edu/daswg/wiki/NetworkDataServer2
We should install this so that we can use this modern interface to get 40m data from outside and inside of the 40m.
Entry  Wed Oct 6 14:49:54 2010, rana, Summary, lore, Steve on the sea jacques.jpg
 
Entry  Sun Oct 10 18:09:02 2010, Koji, Summary, COC, Phase map interferometer calibration for the data on Oct 8th, 2010  calibration.pdf
Summary:
Calibration of the phase map interferometer was calculated for the data on Oct 8th, 2010.
The calibration value is 0.1905 mm/pixel.
This is slightly smaller than the assumed value in the machine that is 0.192mm/pixel.
ELOG V3.1.3-