40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 46 of 344  Not logged in ELOG logo
ID Datedown Author Type Category Subject Text Attachments
  15050   Tue Nov 26 18:16:08 2019 ranaUpdateLSCPOX / POY calibration...maybe the opto-mechanical
CARM plant
  
  15049   Tue Nov 26 17:07:41 2019 gautamUpdateLSCPOX / POY calibrationSummary:

Since we are using the POX and
POY photodiodes as out-of-loop sensors for
 POX_POY_sensorNoise.pdfALSnoise_20191125.pdf 
  15048   Tue Nov 26 13:33:33 2019 YehonathanUpdateCamerasMC2 Camera rotated by 90 degreesMC2 analog camera was rotated by 90 degrees.
Orientation correctness was verified by exciting
the MC2 Yaw degree of freedom.
 MC2AnalogCameraAfter.jpgMC2AnalogCameraBefore.jpg 
  15047   Mon Nov 25 22:10:26 2019 shrutiUpdateNoiseBudgetDiagnostics This is to help troubleshoot the excess
noise measured earlier.

The following channels were measured
 LSC.pdfITMY.pdfITMX_L.pdf 
  15046   Mon Nov 25 19:11:22 2019 gautamUpdateLSCALS noise re-lookI re-checked the ALS noise in the following
configurations:


PRM is misaligned.
Michelson
 ALSnoise.pdf 
  15045   Fri Nov 22 00:54:14 2019 gautamUpdateLSClocking notes[KA, GV]

There was no shaking (that disturbed
the locking) tonight!
 ALSnoiseIncrease.pdf 
  15044   Thu Nov 21 19:08:58 2019 gautamUpdateLSCHigh BW lock of Y arm length to PSL frequencySummary:

The Y arm cavity length was locked
to the PSL frequency with ~26kHz
 highBW_POY.pdfCM_UGF.pdfIN2_ACcoupling.pdf 
  15043   Thu Nov 21 13:14:33 2019 KojiUpdateLSCCM board studyOne of the differences between the direct
POY and the CM_SLOW POY is the presence of
the CM Servo gain stages. So this might mean
  
  15042   Thu Nov 21 12:46:22 2019 gautamUpdateLSCCM board studyIn preparation for trying out some high-bandwidth
Y arm cavity locking using the CM board,
I hooked up the POY11_Q_Mon channel of the
 YARM_CMslow.pdf 
  15041   Wed Nov 20 21:29:28 2019 gautamUpdateLSCPRG ~13After the QPD fix, both arms report consistent
buildup - see Attachment #1. The peak values
touch ~250, corresponding to a PRG of ~13.
 PRG13.pdf 
  15040   Wed Nov 20 17:52:00 2019 gautamUpdateLSCQPD MEDM screen updateKoji and I had noticed that there was some
discrepancy between the switchable gain stages
of the EX and EY QPDs. Sadly, there was no
 newLookQPD.pngTRX_TRY_comparison.pdfIMG_8186.JPG 
  15039   Wed Nov 20 17:20:24 2019 YehonathanUpdateLSCQPD Investigation{Gautam, Yehonathan}

In search of the source of discrepancy
between the QPD readings in the X and Y arms,
  
  15038   Wed Nov 20 12:14:17 2019 gautamUpdateLSCLocking - progressI took a look at the TRX/TRY RIN reported
in the single arm POX/POY lock, and compared
the performance of the two available PDs
 TRX_TRY_comparison.pdf 
  15037   Wed Nov 20 01:07:18 2019 gautamUpdateLSCLocking - progressSummary:


CARM offset was reduced
to 0 with the PRMI locked.
TRY
 PRFPMI.png 
  15036   Tue Nov 19 21:53:57 2019 gautamUpdatePEMFollow-up on seismometer discussionThe shaking started earlier today than
yesterday, at ~9pm local time.

While the IFO is shaking, I thought
 seisxSpec.pdf 
  15035   Tue Nov 19 15:08:48 2019 gautamUpdateCDSVertex models rebootedJon and I were surveying the CDS situation
so that he can prepare a report for discussion
with Rolf/Rich about our upcoming BHD upgrade.
 armSat.png 
  15034   Mon Nov 18 21:04:38 2019 gautamUpdateLSCLocking - some ideasSome ideas Koji suggested:


Try approaching the CARM
offset zero point "from the other side"
  
  15033   Mon Nov 18 16:32:15 2019 gautamUpdateComputersZITA: started upgrade from Ubuntu 14 LTS to 18 LTSthe upgrade seems to have been successfully
executed - the machine was restarted at ~430pm
local time. Projector remains off and diagnostic
  
  15032   Mon Nov 18 14:32:53 2019 gautamUpdatePEMFollow-up on seismometer discussionThe nightly seismic activity enhancement
continued during the weekend. It always shows
up around 10pm local time, persists for ~1
  
  15031   Fri Nov 15 18:59:08 2019 ranaUpdateComputersZITA: started upgrade from Ubuntu 14 LTS to 18 LTSand so it begins...until this is finished
I have turned off the projector and moved
the striptools to the big TV (time to look
  
  15030   Fri Nov 15 12:16:48 2019 gautamUpdatePEMFollow-up on seismometer discussionAttachment
#1 is a spectrogram
 BS_ZspecGram.pdf.zip 
  15029   Fri Nov 15 12:08:04 2019 gautamUpdateLSCPOPDC whitening boardThe DC port of the Bias-Tee is routed to
(a modified
version of) the iLIGO whitening board.
  
  15028   Fri Nov 15 11:58:12 2019 gautamUpdateLSCoff the bad Violin filtersThe clue was that the loop X arm POX loop looked
to have low (<3dB)) gain margin around
600 Hz (and again at 700 Hz). 
 violinFix.pdfnewViolinConfig.png 
  15027   Fri Nov 15 00:18:41 2019 ranaUpdatePEMFollow-up on seismometer discussionThe large ground motion at 1 Hz started
up again tonight at around 23:30. I walked
around the lab and nearby buildings with
 MCshake.pdf 
  15026   Thu Nov 14 23:56:18 2019 ranaUpdateLSCoff the bad Violin filtersWe turned off many excessive violin mode
bandstop filters in the LSC.

Due to some feedforward work by
 out.pdf 
  15025   Thu Nov 14 12:11:04 2019 ranaUpdatePEMFollow-up on seismometer discussionat 1 Hz' this effect is not large so
that's real translation. at lower frequencies
a ground tilt couples to the horizontal sensors
  
  15024   Wed Nov 13 23:40:15 2019 gautamUpdatePEMFollow-up on seismometer discussionHere is some disturbance
in the spacetime curvature, where the local
 seisAll_20191111_1Hz.pdf 
  15023   Wed Nov 13 20:15:56 2019 ranaUpdatePEMFollow-up on seismometer discussionthis
is due to the Equivalence Principle: local
  
  15022   Wed Nov 13 19:34:45 2019 gautamUpdatePEMFollow-up on seismometer discussionAttachment
#1 shows the spectra
 seisAll_20191111.pdfffPotential.pdf 
  15021   Thu Nov 7 17:55:37 2019 shrutiUpdateComputer Scripts / ProgramsPython packages on donatellaToday I realized that pip and other python2,3
packages were installed in the conda base
environment, so after running
  
  15020   Thu Nov 7 17:46:10 2019 shrutiUpdateALSAM measurement at X endSome details:

- There
was a SR560+SR785 (not connected for measurement)
placed near the X end which I moved; it is
 AMTF20191107.png 
  15019   Wed Nov 6 20:34:28 2019 KojiUpdateIOOPower combiner loss (EOM resonant box installed)Gautam and I were talking about some modulation
and demodulation and wondered what is the
power combining situation for the triple
 power_combiner.pdf 
  Draft   Wed Nov 6 20:34:08 2019 KojiUpdateIOOEOM resonant box installed 




  
  15017   Wed Nov 6 19:26:57 2019 gautamUpdatePSLSome PSL cable adminKoji and I taked about cleaning up some
of the flaky cable situation on the PSL table
a while ago. The changes were implemented
 PSLcableAdmin.jpg 
  15016   Wed Nov 6 17:45:34 2019 gautamUpdateLSC~Here is a comparison of the response of
various DoFs in our various RFPD sensors
for two different CARM offsets. Even in the
  
  15015   Wed Nov 6 17:05:45 2019 gautamUpdateLSCCARM calibrationSummary:

A coarse calibration of the CARM
error point (when on ALS control) is 
 CARMscan.pdfCARMcalib.pdfscan.hdf5.zip 
  15014   Wed Nov 6 02:08:48 2019 gautamUpdateLSCLocking updatesSummary:

There seems to be stronger-than-expected
coupling between CARM and the 3f sensors. 
  
  15013   Tue Nov 5 12:37:50 2019 gautamUpdatePEMT240 interface unit pulled outI removed the Trillium T240 DAQ interface
unit from 1X4 for investigation.

It
 T240_recenter.pdfffPotential.pdf 
  15012   Tue Nov 5 11:52:27 2019 gautamUpdateLSCLocking notesSummary:

I am still unable to achieve arm
powers greater than TRX/TRY ~10 while keeping
 PRMI3f_ALS_Nov4sensMat.pdf 
  15011   Mon Nov 4 19:02:25 2019 YehonathanUpdatePSLMapping the PSL electronicsI created a spreadsheet (Attached) by taking Koji's
c1psl sheet from slow_channel_list and filtering
out the channels that do not need an Acromag.
 PSL_Wirings_-_Sheet1_(1).pdf 
  15010   Mon Nov 4 16:06:58 2019 gautamUpdateLSCPOP optical pathI did some re-alignment of the POP beam
on the IX in air table. Here are the details:


 IMG_8027.JPGlensRealignment.jpgPOPrealigned.pngPOPdither.pngPRMfixed.png 
  15009   Mon Nov 4 15:29:47 2019 gautamUpdateLSCPOP signal pathThere are many versions of the POP22 signal
path I found on the elog, e.g. this
thread. But what I saw at the LSC rack
 POPchain.pdf 
  15008   Mon Nov 4 13:26:04 2019 YehonathanUpdatePSLUp to date sketch of the 1x1 and 1x2 EurocratesDone.




  
  15007   Mon Nov 4 11:41:28 2019 shrutiUpdateComputer Scripts / ProgramsEpics installed on donatellaI've installed pyepics on Donatella
running

sudo yum install pyepics
  
  15006   Sat Nov 2 17:08:34 2019 YehonathanUpdatePSLUp to date sketch of the 1x1 and 1x2 EurocratesThanks. Please update this wiki page too.

https://wiki-40m.ligo.caltech.edu/Electronics/ElectronicsRacks#A1X1
  
  15005   Sat Nov 2 16:36:55 2019 YehonathanUpdatePSLUp to date sketch of the 1x1 and 1x2 EurocratesI reproduced Gautam's sketch of the
1x1 and 1x2 Eurocrates into a pdf image
that contains links to the appropriate DCCs
 1x1_1X2_Eurocrates_with_links.pdf 
  15004   Thu Oct 31 10:44:40 2019 gautamUpdatePSLPMC re-lockedPMC got unlocked at ~4am. I re-locked it.
Also tweaked the input pointing into the
cavity. The misalignment was mostly in pitch.
  
  15003   Wed Oct 30 23:12:27 2019 KojiUpdateSUSPRM suspension issuesSigh... hard loch   
  15002   Wed Oct 30 19:20:27 2019 gautamUpdateSUSPRM suspension issuesWhile I was trying to lock the PRMI this
evening, I noticed that I couldn't move
the REFL beamspot on the CCD field of view
 PRMUL.pdfPRMnormal.pdfPRM-Sensors_noise.pdfPRMsuspensionWonky.png 
  15001   Wed Oct 30 17:08:40 2019 gautamUpdateLSCPOP22 investigationThe POP beam coming out of the vacuum chamber
is split by a 50/50 BS and half is diverted
to the POP22/POP110/POPDC photodiode (Thorlabs
 POP22anomaly.pdf 
ELOG V3.1.3-