  14294   Wed Nov 14 14:35:38 2018 SteveUpdateALARM emergency calling list for 40m Lab

It is posted at the 40m wiki with Gautam' help. Printed copies posted around doors also.

  3591   Mon Sep 20 17:10:10 2010 steveConfigurationPSL enclosure beam guides to IFO are installed

The PSL out  2" OD beam guide tube was cut  1.5" shorter to 13.5"

The 10" OD  0.25" wall Al tube was replaced by a  lighter, not anodized and thinner  wall 0.094" tube of 15.5" lenght, that is 0.75" shorter.

The new position of the PSL table made these cuts necessary.

  12930   Thu Apr 6 15:35:44 2017 SteveUpdatePEM envioirmental noise

Building:         Central Engineering Services

     

Date:             Monday, 04/10/17          

          

Time:             7:00 AM TO 9:00 AM           

 

Notification:     Crane Activity

    

Contact:          Ben Smith, X-4190 Brad Nielsen, X-8751

 

Contractors will be removing the large vaporizer located on the South

side of CES. Vehicle access will be restricted due to crane placement

and operation, but there will be a single traffic lane available. This

work may create minor noise and vibrations.  

  7999   Tue Feb 5 09:08:11 2013 SteveUpdatePEM exterier doors to be painted

Quote:

The wood exteier walls, gutters and doors were painted at CES-Annex building #69

 The east and south end of the 40m emergency exit doors are sealed- tapped off temporarily.  They will be painted on the out side only.  This job will be done by tomorrow noon

 Do not open chamber if you smell the paint !

Attachment 1: IMG_0055.JPG
IMG_0055.JPG
  9623   Tue Feb 11 16:49:36 2014 SteveUpdatePEM floor cleaning

 Keven, Steve

 

The floor was cleaned under the east arm tube with hand held wet towel. We moved staff around and mopped. I did at the bottom of rack  1Y1, 2  and 3. 

Last week we did the south arm tube floor.

Next week we 'd like to clean under rack 1X1,2,3, 4, 5, 6 and 7 

  9643   Tue Feb 18 10:10:07 2014 SteveUpdatePEM floor cleaning under racks

Quote:

 Keven, Steve

 

The floor was cleaned under the east arm tube with hand held wet towel. We moved staff around and mopped. I did at the bottom of rack  1Y1, 2  and 3. 

Last week we did the south arm tube floor.

Next week we 'd like to clean under rack 1X1,2,3, 4, 5, 6 and 7 

 Keven, Steve

1Y4, 1X1,2,3,4 & 5 instrument racks floor space were cleaned.

  9689   Tue Mar 4 17:07:27 2014 SteveUpdatePEM floor cleaning under racks

Quote:

Quote:

 Keven, Steve

 

The floor was cleaned under the east arm tube with hand held wet towel. We moved staff around and mopped. I did at the bottom of rack  1Y1, 2  and 3. 

Last week we did the south arm tube floor.

Next week we 'd like to clean under rack 1X1,2,3, 4, 5, 6 and 7 

 Keven, Steve

1Y4, 1X1,2,3,4 & 5 instrument racks floor space were cleaned.

 Keven, Steve

 

1X6, 1X7 and 1X9 instrument racks floor space were cleaned today

  12227   Wed Jun 29 14:32:22 2016 SteveUpdateSUS how to remove epoxy from optics

 

Hi Steve -

I found the doc I was looking for:

https://dcc.ligo.org/LIGO-E1200821

Specifically, you might find guidance in Section 5 and the pictures at the end of the doc.  This should work for Vacseal as well.

Good luck - it will take some time (hours to day or 2)...
I'll be interested to know how it goes.

GariLynn helped us develop this procedure so you could also ask her to cast an eye over the setup if you are worried.

-Betsy

ps: there is no existing fixture to hold SOS optic while soaking it
 

  12231   Thu Jun 30 10:03:16 2016 SteveUpdateSUS how to remove epoxy from optics

Proposed Acetone soak dish for SOS epoxy softening.

It has good acces through 5" top ID. The set up is stable and teflon lined.

Materials: glass jar with SS cover, teflon bricks, 0.008" teflon wrapped "high density Drever bricks" and aluminum

Drever brick: I beleive it is a Tungsten alloy. We used it as vac-bat savor at the coffe can. It has high density, heavy and hard, it was never identified.

I will soak one brick  to see if it has any reaction ability with acetone.

 

NO means that only Glass and Teflon can be used for this fixture in  Acetone. We can not take a chance on the coating!

I guess the small surface area Aluminum dumbbell, guide rod and-or wire standoff, magnet and epoxy does not degrade the acetone such way that it effects our coating.

Not ot mention, that only the very edge of the coating would in this solution.

              

 

Attachment 1: SOSsoakDish.jpg
SOSsoakDish.jpg
Attachment 2: SOSsoakDish_tv.jpg
SOSsoakDish_tv.jpg
  12241   Tue Jul 5 09:25:31 2016 SteveUpdateSUS how to remove epoxy from optics

Glass soaking dish with teflon guides.

Quote:

Proposed Acetone soak dish for SOS epoxy softening.

It has good acces through 5" top ID. The set up is stable and teflon lined.

Materials: glass jar with SS cover, teflon bricks, 0.008" teflon wrapped "high density Drever bricks" and aluminum

Drever brick: I beleive it is a Tungsten alloy. We used it as vac-bat savor at the coffe can. It has high density, heavy and hard, it was never identified.

I will soak one brick  to see if it has any reaction ability with acetone.

 

NO means that only Glass and Teflon can be used for this fixture in  Acetone. We can not take a chance on the coating!

I guess the small surface area Aluminum dumbbell, guide rod and-or wire standoff, magnet and epoxy does not degrade the acetone such way that it effects our coating.

Not ot mention, that only the very edge of the coating would in this solution.

              

 

 

Attachment 1: SOSsoakingDish.jpg
SOSsoakingDish.jpg
Attachment 2: SOSsoakingD.jpg
SOSsoakingD.jpg
  3745   Wed Oct 20 16:41:41 2010 steveOmnistructureGeneral laser chiller leaving for MIT
Attachment 1: P1060929.JPG
P1060929.JPG
  3288   Mon Jul 26 08:51:31 2010 steveUpdatePEM lowering AC setpoint by 2F makes PSL happy

Quote:

The control room temp is warmer than usual. The heat exchanger Office Pro 18 set point was lowered from 70 to 68F yesterday.

The MOPA headtemp is higher also. The Neslab chiller bath temp peaks around 21.6 C daily. This should be rock solid 20.00 C

It did not have any effect.

Now, I have just lowered the thermostat setting of room 101 from 73 to71F  I  hope Koji can take this.

 Little change in the AC set temp can make wonders. Neslab chiller bath temp 19.99C is back to normal and daily variation of PSL are much better.

Attachment 1: htempRTemp.jpg
htempRTemp.jpg
  3505   Wed Sep 1 10:54:15 2010 steveUpdatePEM more crane balancing

Crane balancing at the south end is continuing today.

  8822   Wed Jul 10 14:49:00 2013 SteveUpdateGreen Locking more fiber protective tubing layed

Quote:

Craig, Gautam and Steve,

Single mode fiber 50m long is layed out into cable tray that is attached to the beam tube of the Y arm.

It goes from ETMY to PSL enclosure. It is protected at both ends with " clear- nylon slit corrugated loom tubing " 1.5" ID

The fiber is not protected between 1Y1 and 1Y4

 Installed 0.5" ID 10 ft long protective tubing at the PSL end of the  ETMY fiber this morning. Here I had to cable tie a bunch of cables at the east side of the PSL enclosure.

They were hanging off the table blocking space were the sliding doors move.

 At the ETMX end of the X-arm fiber received the same protective tubing.

Attachment 1: fibreETMXprotectedendOnly.jpg
fibreETMXprotectedendOnly.jpg
  3422   Fri Aug 13 18:32:48 2010 steveUpdatePEM new legs attached to optical table

Koji, Rana and Steve

 

The floor preparation continued today. The really messy part of drilling and jack-hammering the concrete were done in controlled manner.

Particle counts peaked at 106K of 0.3 micron and 13 K of 1.0 micron particles/ cfmin at the top of SP table.

Legs were installed with the help of Koji and strongman Rana. Professor Rana was very useful lifting the 85 lbs legs. 

 

Atm1, Drilling holes for ribbed bar reinforcement of concrete

Atm2, Koji and Rana are playing hide and seek while installing legs

Atm3-4, 6 Rigid tripod legs attached by 6x3 of 1/4-20x 7/8 screws. The top plates of the legs were torqued to 108 ft/lbs by Rana

Attachment 1: P1060612.JPG
P1060612.JPG
Attachment 2: P1060626.JPG
P1060626.JPG
Attachment 3: P1060631.JPG
P1060631.JPG
Attachment 4: P1060636.JPG
P1060636.JPG
  974   Fri Sep 19 11:48:14 2008 steveUpdateComputers old hubs can make one happy
Joseph finds a XIX century bottle neck hub: CentreCOM 3624TR 10Base-T
and happily replaces it with Netgear GS724T 1000Base-T
Attachment 1: P1020934.jpg
P1020934.jpg
  6309   Thu Feb 23 10:53:54 2012 steveUpdateSUS oplev PIT transfer functions

 Oplev transfer functions PIT UGF were optimized to be at 2-3 Hz with 60 degree minimum phase margin by adjuting oplev gains.

Additional Notes by KI:

  • The PRM oplev has a tailored 3.3 Hz resonant gain in order to calm down a wobble during the lock acquisitions.
  • Also in the PRM oplev a 35 Hz elliptic cut-off filter wasn't  activated at the time when Steve measured it.
  • In both ITMs, elliptic cut-off filters seem to have higher corner frequencies compered with the others.
    • I guess these settings are from the old days.
  • ETMs and ITMs have whitening filters while the rest of the suspensions don't.
    • Without the whitening filters, normally the signals above 30 Hz are covered by some electrical noises or perhaps He-Ne laser intensity noise (#5630).
      • This is why we usually use the 35 Hz elliptic filters to roll off the control noises.
    • Since the ETMs and ITMs have whitening filters they potentially can have slightly higher corner frequencies in the elliptic filters.
      • Of course the corner frequencies need to be re-designed in terms of the amount of noise injection to the longitudinal motion.

 

Attachment 1: oplPITtrans.pdf
oplPITtrans.pdf
  6323   Mon Feb 27 14:35:22 2012 steveUpdateSUS oplev YAW transfer functions

 The BS and the PRM have 3.3 Hz resonant gain filters that kill the phase margins.

 

Attachment 1: oplYAWtransf.pdf
oplYAWtransf.pdf
  9952   Wed May 14 10:04:06 2014 SteveSummarySUS oplev laser and temperature

 ETMX oplev qpd gain has to be increased.

 

Attachment 1: TempRules.png
TempRules.png
  9254   Fri Oct 18 15:18:49 2013 SteveUpdatePEM particle count peak or ...

Sunday evening fireworks. Manasa heard it.

Attachment 1: PEMcount?.png
PEMcount?.png
Attachment 2: PemCountPeak?No.png
PemCountPeak?No.png
  9374   Wed Nov 13 11:30:07 2013 SteveUpdatePEM particle counter MOVED
Particle counter moved from the top of IOOC to the east wall
Attachment 1: Met1Moved.JPG
Met1Moved.JPG
  7595   Tue Oct 23 09:37:33 2012 SteveUpdateSUS passive TT adjustment correction

Quote:

Tip Tilt pitch adjustment on existing-in vacuum suspension. This can be added by a simple installation of a 1.25" long 2-56 threaded rod with nuts.

 We should check that  their sus wire diameter are 0.0017"  All 2-56 hardware are in and  Bob is cleaning them.

Attachment 1: IMG_1745.JPG
IMG_1745.JPG
  11915   Wed Jan 6 10:58:03 2016 SteveUpdateGeneral projector light bulb is out

Projector light bulb ordered

Quote:

 

[ Manasa, Ericq and Steve ]

 Vivitek D952HD with 186 hours installed.

 

  12596   Thu Nov 3 12:40:10 2016 gautamUpdateGeneral projector light bulb is out

The projector failed just now with a pretty loud 'pop' sound - I've never been present when the lamp goes out, so I don't know if this is usual. I have left the power cable unplugged for now...

Replacement is ordered Nov 4

  12626   Fri Nov 18 15:10:06 2016 SteveUpdateGeneral projector shipped out for repair

Vivitek D952HD sn2160130 was send out for warranty repair. It's hard to believe that it has a 5 year warranty...... RMA - WR16004483.....expected to be back by Friday, Dec 2

Quote:

The projector failed just now with a pretty loud 'pop' sound - I've never been present when the lamp goes out, so I don't know if this is usual. I have left the power cable unplugged for now...

Replacement is ordered Nov 4

 

  9980   Wed May 21 09:35:33 2014 SteveUpdateSUS razor beam dumps ETMX_ISCT

Quote:

Anodized aluminum dumps replaced by 6 razor beam dumps.

Two more razor beam dumps added this afternoon.   The picture will updated tomorrow.

 There are 9 razor beam dumps at ETMY-ISCT

Attachment 1: 9rbdETMY.jpg
9rbdETMY.jpg
  7434   Mon Sep 24 17:47:05 2012 SteveUpdateVAC ready to pump

  The IFO will be at atmosphere  overnight. The annuloses are pumped down. The access connector jam nuts are tightened to 45 ft/lbs

Actual pumpdown will start tomorrow morning.

  14199   Tue Sep 18 14:02:37 2018 SteveUpdatesafety safety training

Yuki Miyazaki received 40m specific basic safety training.

 

  4350   Thu Feb 24 16:47:26 2011 steveConfigurationPSL shutter is back on the PSL output

Uniblitz mechanical shutter was placed into the beam path of the PSL output with razor beam trap. The output power was 1.39W at 2.08A

It is working from the MEDM screen "old map" C1IOO_Mech_Shutter.adl

Attachment 1: P1070441.JPG
P1070441.JPG
  14299   Fri Nov 16 10:26:12 2018 SteveUpdateVAC single viton O-rings

The 40m vacuum envelope has one large single O-ring on the OOC west side. All other doors have double O-ring with annuloses.

There are 3  spacers to protect o-ring. They should not be removed!

 

The Cryo-pump static seal to VC1 also viton. All gate valves and right angle valve plates have single viton o-ring seal.

Small single viton o-rings on all optical quality viewports.

Helium will permiate through these fast. Leak checking time is limited to 5-10 minutes.

All other seals are copper gaskits. We have 2 manual right angle with METAL-dynamic seal [ VATRING ] as  VV1 & RV1

 

Attachment 1: Single-O-ring.png
Single-O-ring.png
  2701   Tue Mar 23 10:11:13 2010 steveUpdatePEM small air cond unit failed yesterday

Old control room air condition failed yesterday around noon. It was blowing 80-85F hot air for about 2-3 hours at racks 1Y4-7 and the entry room 103

Attachment 1: 20datm.jpg
20datm.jpg
  9257   Tue Oct 22 10:12:33 2013 SteveUpdatePEM south arm AC intake duct checked

  The 4th week of no wet mopping of the floor  and no wet wiping  the vacuum envelope.

 

We cleaned the intakes of the south arm IFO air condition. The bottom duct have quite a bit accumulation Atm1

See wet wiped contrast on Atm2

We found 3 holes around pipes ( coming from CES ) on the east wall that has to be sealed.

After closer examination of these holes, they are sealed off well.

Attachment 1: PEM0.5micron60d.png
PEM0.5micron60d.png
Attachment 2: southArmIntakeNorth.jpg
southArmIntakeNorth.jpg
Attachment 3: SouthArmMidIntakeWipe.jpg
SouthArmMidIntakeWipe.jpg
  8356   Tue Mar 26 16:36:24 2013 SteveUpdate40m Upgrading table leveling mounts go here

Quote:

Steve's suggestion for how to level the end table using "swivel leveling mounts":

end-tabel-leveling.png

 

1, level table with 4 swivels, lock nuts  3/16 -vertical alignment    2, lock this position with 4 x 1/4-20 (these are in place already) to hold table in horizontal direction

   Adjustable mount is here to compensate for bad tilting  floor <http://www.mcmaster.com/#6111K52>  

      See grouting plans of the past   http://nodus.ligo.caltech.edu:8080/40m/7248

Attachment 1: optabSTAND.PDF
optabSTAND.PDF
Attachment 2: swivvelMountEE.jpg
swivvelMountEE.jpg
  8372   Fri Mar 29 16:30:27 2013 SteveUpdate40m Upgrading table leveling mounts go here

Quote:

Quote:

Steve's suggestion for how to level the end table using "swivel leveling mounts":

end-tabel-leveling.png

 

1, level table with 4 swivels, lock nuts  3/16 -vertical alignment    2, lock this position with 4 x 1/4-20 (these are in place already) to hold table in horizontal direction

   Adjustable mount is here to compensate for bad tilting  floor <http://www.mcmaster.com/#6111K52>  

      See grouting plans of the past   http://nodus.ligo.caltech.edu:8080/40m/7248

 

  9582   Tue Jan 28 16:26:40 2014 SteveUpdateVAC vacuum computers are back without safety

Quote:

[Steve Koji]

We pushed the reset button of c1vac1 and c1vac2 and the vacuum screen is back.

First, we pushed the reset button of c1vac1 and pushed the one on c1vac2.
This did not bring c1vac2 up. We pushed the reset of c1vac2 again and now everything of the vacuum screen is back.

 1, Reset works

 2, Default values are lost. They actually reversed into open and turn on everything when power recycle c1vac1, c1vac2 or 24V dc power supply. This can vent the IFO in an event of power failure!

      It's may be the time to go back to an isolated, vacuum controller only computer.

 

The present valve configuration at Atm1

a, all annuloses are vented

b, valve cables disconnected at: VC1 and 4 IP gate valves

c, the RGA is off and it is pumped by the Maglev through VM2

d, cryo pump is being roughed with TP3  It's outgassing rate was 25 mTorr / min

e, Roughing hose is disconnected

Attachment 1: c1vac1_vac2areback.png
c1vac1_vac2areback.png
  9599   Wed Feb 5 08:14:59 2014 SteveUpdateVAC vacuum computers are back without safety

Quote:

 

 1, Reset works

 2, Default values are lost. They actually reversed into open and turn on everything when power recycle c1vac1, c1vac2 or 24V dc power supply. This can vent the IFO in an event of power failure!

      It's may be the time to go back to an isolated, vacuum controller only computer.

 

The present valve configuration at Atm1

a, all annuloses are vented

b, valve cables disconnected at: VC1 and 4 IP gate valves

c, the RGA is off and it is pumped by the Maglev through VM2

d, cryo pump is being roughed with TP3  It's outgassing rate was 25 mTorr / min

e, Roughing hose is disconnected

 Vacuum checks before pump down:

1, check intermittent contact issue in black relay box

2, reconnect cable to ion pumps and vent them to atm before pump down

3, repeat power shutdown-reboot at atmosphere

  12209   Tue Jun 21 14:12:10 2016 SteveUpdatePEM vacuum envelope wiped

I wiped down the cranes with wet towel and Mario our janitor did the chamber tops with the tubes.

The optical tabels were not touched.

The outside temp peaked at 44 C yesterday

 

Attachment 1: 60dPEM.png
60dPEM.png
  9514   Thu Jan 2 10:50:24 2014 SteveUpdateVAC vacuum monitor is still blank

 The date is correct on this monitor.

Last stored RGA scan data Dec 20, 2013

IFO pressure at CC1 5.8e-6 Torr

Valve configuration: Vacuum Normal, confirmable only by manual checking of position indicators and pressure gauge controllers  readouts

 

Attachment 1: Help.png
Help.png
Attachment 2: vacation.png
vacation.png
Attachment 3: 20131220lastRGAscan.png
20131220lastRGAscan.png
  9515   Thu Jan 2 13:35:06 2014 KojiUpdateVAC vacuum monitor is still blank

We probably need to restart the machine, but I didn't want to touch c1vac1 and c1vac2. 

  9581   Tue Jan 28 11:13:50 2014 KojiUpdateVAC vacuum monitor is still blank

[Steve Koji]

We pushed the reset button of c1vac1 and c1vac2 and the vacuum screen is back.

First, we pushed the reset button of c1vac1 and pushed the one on c1vac2.
This did not bring c1vac2 up. We pushed the reset of c1vac2 again and now everything of the vacuum screen is back.

  11695   Fri Oct 16 18:27:52 2015 SteveUpdateVAC vacuum normal condition

Vacuum normal configuration with VM1-closed, VM2-open valve positions. Power load normal 24V 0.2A

Maglev rotation 560 Hz at room temp body temp.

"NO COMM" error message on medm screen. Gauge controller pressures are read able.

All vac comp LEDs are green. We have to reboot on Monday to enable communication.

 

Attachment 1: oct16Fpm2015.png
oct16Fpm2015.png
  14028   Thu Jun 28 08:09:51 2018 SteveUpdateCDS vacuum pneumatic N2 pressure

The fardest I can go back on channel C1: Vac_N2pres is  320 days

C1:Vac-CC1_Hornet Presuure gauge started logging Feb. 23, 2018

Did you update the " low N2 message"  email addresses?

 

Quote:

I moved the N2 check script and the disk usage checking script from the (sudo) crontab of nodus no to the controls user crontab on megatron yes.

 

Attachment 1: 320d_N2.png
320d_N2.png
  14029   Thu Jun 28 10:28:27 2018 ranaUpdateCDS vacuum pneumatic N2 pressure

we disabled logging the N2 Pressure to a text file, since it was filling up disk space. Now it just sends an email to our 40m mailing list, so we'll all get a warning.

The crontab uses the 'bash' version of output redirection '2>&1', which redirects stdout and stderr, but probably we just want stderr, since stdout contains messages without issues and will just fill up again.

  1459   Wed Apr 8 09:36:20 2009 steveConfigurationVAC valve condition changed to BG to calibrate the RGA

Vacuum normal valve condition was changed to accommodate SRS-RGA calibration.

 

The annulus valves were closed to free TP3 to pump on the RGA
VM1 was closed to isolate the RGA from the IFO.
 
 
VM3 opened to TP3.
 
This condition is called back ground (BG) mode. It is where we can calibrate and see the RGA background without the IFO.
  9443   Thu Dec 5 11:06:43 2013 SteveUpdateCameras viewport video ccd cameras are all covered

Quote:

Quote:

Can't we somehow hook up this camera to the MUX with the movie mode?
I think both the MUX and the sensoray are compatible with the color video signal.
Only the old CRT is B/W.

 Watek 902H ccd with Tamron M118FM50 lens is hooked up to MUX  Please be careful! In this set up the lens is close to the view port glass window! 

 PRM-BS & Faraday video ccd  cameras  covered as shown. These thin wall metalized ducts are perfect for blocking light in both direction.

They are very light and give you easy access to adjustment.

Attachment 1: PRMcamera.jpg
PRMcamera.jpg
Attachment 2: PRMcameraCover.jpg
PRMcameraCover.jpg
Attachment 3: FaradayCameraCover.jpg
FaradayCameraCover.jpg
  10076   Thu Jun 19 17:28:19 2014 SteveUpdatePSL window device is ready for test

The window is at the north west corner of the  PSL enclosure.

The 1 mm thick BK7 window is AR coated both side R <0.08%,  W2-PW1-1004-1064-0

The PZT stack is 0.75" OD, 0.25" thick with  ~ 6 mm ID,  motion range 2.5 micron at 200V

Soft silicon rubber isolation.

 

RXA: This is the opto-mechanical phase shifter that Steve has built for diagnosing scattered light problems. We put it into the reflected light path of any of the cavities and see if it can move the scattering noise from DC up to a higher frequency. e.g.:

The paper on this from GEO

Attachment 1: softW2.jpg
softW2.jpg
Attachment 2: softW2b.jpg
softW2b.jpg
  12346   Thu Jul 28 08:42:36 2016 SteveUpdateSUS wire clamp

The clamp is in the machine for milling off the grooves. It's condition is normal. The edges needs some 800 sand paper so it is not sharp anywhere.

How did those nicks get on the edge? Fortunatelly they did not aligned with the wire.

 

Attachment 1: e12342.jpg
e12342.jpg
  12144   Wed Jun 1 15:01:56 2016 SteveUpdateSUS wire standoffs update

There are some issues with 5 mm sapphire prism Atm5. It will cause  interference between one of the prisms and the Side OSEM.

Here are some drawings to see the issues with larger wire standoff.

The 2 mm prism will work.with a 1 mm longer dumbell.

Quotes requested from http://photomachining.com/laser-micromachining-photomachining-contact.html and http://www.optocity.com/ 

 

 

Attachment 1: 06011603.PDF
06011603.PDF
Attachment 2: 06011602.PDF
06011602.PDF
Attachment 3: sapphire_stand_off_v2.pdf
sapphire_stand_off_v2.pdf
Attachment 4: side_OSEM_ETMY.jpg
side_OSEM_ETMY.jpg
Attachment 5: 5p2wsf.png
5p2wsf.png
  12146   Thu Jun 2 16:35:44 2016 KojiUpdateSUS wire standoffs update

Gap of the prism from the mirror

Sag: s = R(1-Cos[ArcSin[d/2/R]])

- Mirror curvature sag for 2mm prism (R=37.75mm): s=13um

- Minimum gap: 20um => s=33um => R=15mm

- Nominal gap: 35um => s=48um => R=10mm

- Maximum gap: 50um => s=63um => R=8mm


The second figure shows somewhat realistic arrangement of the pieces

Attachment 1: sapphire_stand_off_v3.pdf
sapphire_stand_off_v3.pdf
Attachment 2: arrangement-v3.pdf
arrangement-v3.pdf
  12454   Tue Aug 30 15:44:28 2016 SteveUpdateSUS wire standoffs update

100 Sapphire prisms ordered. Delivery date 9-30-2016

~60 deg. prisms,

Size A=B=C=2 mm, length 5 mm

Material: sapphire

Surface quality: 5 micron RMS

Tolerances: +- 0.1 mm

This prism will be used as a mechanical component

No crystal orientation required

 

Quote:

There are some issues with 5 mm sapphire prism Atm5. It will cause  interference between one of the prisms and the Side OSEM.

Here are some drawings to see the issues with larger wire standoff.

The 2 mm prism will work.with a 1 mm longer dumbell.

Quotes requested from http://photomachining.com/laser-micromachining-photomachining-contact.html and http://www.optocity.com/ 

 

 

 

ELOG V3.1.3-