40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 3 of 357  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Fri Nov 20 16:18:56 2009, rob, Configuration, SUS, watchdog rampdown 
Entry  Mon Aug 10 15:25:05 2015, Steve, Update, PEM, wasp nest waspN.jpg
Entry  Wed Sep 9 20:52:45 2020, rana, Summary, IOO, wandering line in IMC 
Entry  Wed Apr 21 10:09:23 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals focal_positin_edit.png
    Reply  Tue Apr 27 14:18:53 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals mode_in_PPKTP.png
    Reply  Thu Jul 29 21:13:39 2010, Dmass, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals 
    Reply  Thu Jul 29 22:58:25 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals 
    Reply  Fri Jul 30 00:02:15 2010, Dmass, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals 
Entry  Wed Feb 22 16:55:16 2012, Jamie, Update, SUS, wacky state of SUS input matrices 
    Reply  Thu Feb 23 02:20:07 2012, Zach, Update, SUS, wacky state of SUS input matrices 
    Reply  Tue Jan 31 22:15:02 2017, Johannes, Update, CDS, vme crate backplane adapter boards vme_backplane_conn_sketch.jpg
    Reply  Tue Feb 7 19:14:59 2017, Johannes, Update, CDS, vme crate backplane adapter board layout vme_backplane.pdf
Entry  Fri Sep 16 16:07:28 2011, steve, Update, SAFETY, visitors safety training P1080241.JPG
Entry  Fri Oct 8 17:36:16 2010, steve, Frogs, Photos, visiting undergrads P1060916.JPGP1060921.JPGP1060922.JPGP1060915.JPG
Entry  Mon Mar 28 16:19:23 2011, steve, Frogs, Photos, visithing 5th graders P1070475.JPG
Entry  Sat Nov 6 01:54:15 2010, Frank, Summary, Computers, virus definition file update on laptop for dinocam 
Entry  Wed May 20 01:53:48 2009, rob, pete, Update, Locking, violin mode filters in drstep_bang 
Entry  Wed May 22 00:42:13 2013, Koji, Summary, SUS, violin Q 
Entry  Fri Feb 8 12:43:26 2013, yuta, Update, Computers, videocapture.py now supports movie capturing 
Entry  Mon Oct 19 18:14:28 2009, rob, Update, Cameras, video switch broken 
Entry  Wed Jul 23 10:39:18 2014, Steve, Update, Cameras, video quad processors replaced 
Entry  Mon Aug 20 18:10:44 2012, Jenne, Update, Cameras, video capture script copied over to real scripts directory 
    Reply  Fri Aug 17 08:33:46 2012, Steve, Update, Cameras, video cameras in the dark dark.jpg
    Reply  Fri Aug 17 09:34:27 2012, Koji, Update, Cameras, video cameras in the dark 
    Reply  Fri Aug 17 10:38:15 2012, Steve, Update, Cameras, video cameras in the dark 
    Reply  Fri Aug 17 14:45:51 2012, rana, Update, Cameras, video cameras in the dark 
    Reply  Mon Aug 20 09:49:01 2012, Steve, Update, Cameras, video cameras in the DARK onlyOSEMs.jpgOSEMsand_IR.jpgOSEMsandOplev633.jpg
    Reply  Mon Aug 2 10:26:15 2010, steve, Configuration, VAC, very slow pumpdown completed veryslowpd.jpg
Entry  Tue Oct 12 17:42:57 2010, yuta, Update, SUS, very first measurement of Q-values for MC1 MC1ringdown.png
Entry  Tue Aug 31 02:50:45 2010, kiwamu, Update, CDS, vertex suspensions controlled by the new CDS 
Entry  Tue Jan 18 10:25:23 2011, steve, Update, PEM, vertex crane work this week 
    Reply  Thu Sep 30 09:34:58 2010, steve, Update, General, vertex crane trolly drive fixed P1060891.JPGP1060887.JPGP1060889.JPGP1060893.JPG
    Reply  Mon Sep 30 08:53:22 2013, Steve, Update, VAC, vertex crane repair schedule has changed 
    Reply  Mon Sep 9 15:33:06 2013, Steve, Update, VAC, vertex crane repair is scheduled 
    Reply  Wed Nov 13 08:46:03 2013, Steve, Update, VAC, vertex crane repair completed 
    Reply  Wed Oct 2 14:25:39 2013, Steve, Update, VAC, vertex crane is still out of order grindingIbeam.jpgcableMoved.jpg500lbs@end.jpg
    Reply  Thu Sep 5 10:47:58 2013, Steve, Update, VAC, vertex crane folding issue 5mmLess.jpg
    Reply  Wed Sep 18 14:57:12 2013, Steve, Update, VAC, vertex crane folding arm removed manPower.jpgrotatingHinge.jpgsupportingHinge.jpggullingPin.jpg
    Reply  Fri Sep 20 16:37:30 2013, Steve, Update, VAC, vertex crane folding arm is back on bushingBottom.jpgfoldingI.jpgnoLoadGap.jpgtrollyway.jpgtrollySee.jpg
Entry  Tue Sep 28 14:12:14 2010, steve, Update, General, vertex crane drive is out of order 
Entry  Tue Feb 23 13:37:04 2010, kiwamu and steve, Configuration, VAC, venting the 40m vac envelope 
Entry  Tue Nov 6 09:45:22 2007, steve, Summary, SUS, vent sus trend  ventsustrend.jpg
    Reply  Tue Oct 16 17:13:23 2012, Czarina, Summary, General, vent stuff - 4 paths 
Entry  Tue Oct 16 16:46:20 2012, Vent Czar and Czarina, Summary, General, vent stuff 
Entry  Wed Aug 22 15:47:34 2012, jamie, Summary, General, vent prepartion for fast-track vent 
    Reply  Thu Aug 23 10:38:12 2012, Steve, Update, General, vent prepartion for fast-track vent 
Entry  Wed Oct 19 14:03:41 2011, kiwamu, Update, General, vent prep : dichroic mirrors 
    Reply  Tue Feb 23 19:07:43 2010, kiwamu and steve, Configuration, VAC, vent is completed vent2010feb23.jpg
Entry  Wed Sep 24 13:28:48 2014, Steve, Update, VAC, vent is completed ventiscompleted.pngatAtm.png
    Reply  Wed Sep 24 16:02:58 2014, Jenne, Update, VAC, vent is completed 
ELOG V3.1.3-