40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 3 of 354
Not logged in
List
|
Find
|
Login
|
Help
New entries since:
Wed Dec 31 16:00:00 1969
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
17696 Entries
Goto page
Previous
1
,
2
, 3,
4
...
352
,
353
,
354
Next
ID
Date
Author
Type
Category
Subject
Text
14294
Wed Nov 14 14:35:38 2018
Steve
Update
ALARM
emergency calling list for 40m Lab
It is posted at the 40m
wiki with Gautam' help. Printed copies
posted around doors also.
3591
Mon Sep 20 17:10:10 2010
steve
Configuration
PSL
enclosure beam guides to IFO are installed
The PSL out 2" OD beam guide
tube was cut 1.5" shorter to 13.5"
The 10" OD 0.25"
12930
Thu Apr 6 15:35:44 2017
Steve
Update
PEM
envioirmental noise
Building:
Central Engineering Services
7999
Tue Feb 5 09:08:11 2013
Steve
Update
PEM
exterier doors to be painted
9623
Tue Feb 11 16:49:36 2014
Steve
Update
PEM
floor cleaning
Keven, Steve
The floor was cleaned under the east
9643
Tue Feb 18 10:10:07 2014
Steve
Update
PEM
floor cleaning under racks
9689
Tue Mar 4 17:07:27 2014
Steve
Update
PEM
floor cleaning under racks
12227
Wed Jun 29 14:32:22 2016
Steve
Update
SUS
how to remove epoxy from optics
Hi Steve -
12231
Thu Jun 30 10:03:16 2016
Steve
Update
SUS
how to remove epoxy from optics
Proposed Acetone soak dish for SOS epoxy
softening.
It has good acces through 5"
12241
Tue Jul 5 09:25:31 2016
Steve
Update
SUS
how to remove epoxy from optics
Glass soaking dish with teflon guides.
3745
Wed Oct 20 16:41:41 2010
steve
Omnistructure
General
laser chiller leaving for MIT
3288
Mon Jul 26 08:51:31 2010
steve
Update
PEM
lowering AC setpoint by 2F makes PSL happy
3505
Wed Sep 1 10:54:15 2010
steve
Update
PEM
more crane balancing
Crane balancing at the south end is continuing
today.
8822
Wed Jul 10 14:49:00 2013
Steve
Update
Green Locking
more fiber protective tubing layed
3422
Fri Aug 13 18:32:48 2010
steve
Update
PEM
new legs attached to optical table
Koji, Rana and Steve
The floor preparation continued today.
974
Fri Sep 19 11:48:14 2008
steve
Update
Computers
old hubs can make one happy
Joseph finds a XIX century bottle neck hub:
CentreCOM 3624TR 10Base-T
and happily replaces it with Netgear GS724T
6309
Thu Feb 23 10:53:54 2012
steve
Update
SUS
oplev PIT transfer functions
Oplev transfer functions PIT UGF
were optimized to be at 2-3 Hz with 60 degree
minimum phase margin by adjuting oplev gains.
6323
Mon Feb 27 14:35:22 2012
steve
Update
SUS
oplev YAW transfer functions
The BS and the PRM have 3.3 Hz resonant
gain filters that kill the phase margins.
9952
Wed May 14 10:04:06 2014
Steve
Summary
SUS
oplev laser and temperature
ETMX oplev qpd gain has to be increased.
9254
Fri Oct 18 15:18:49 2013
Steve
Update
PEM
particle count peak or ...
Sunday evening fireworks. Manasa heard
it.
9374
Wed Nov 13 11:30:07 2013
Steve
Update
PEM
particle counter MOVED
Particle counter moved from the top of IOOC
to the east wall
7595
Tue Oct 23 09:37:33 2012
Steve
Update
SUS
passive TT adjustment correction
11915
Wed Jan 6 10:58:03 2016
Steve
Update
General
projector light bulb is out
Projector light bulb ordered
12596
Thu Nov 3 12:40:10 2016
gautam
Update
General
projector light bulb is out
The projector failed just now with a pretty
loud 'pop' sound - I've never
been present when the lamp goes out, so I
12626
Fri Nov 18 15:10:06 2016
Steve
Update
General
projector shipped out for repair
Vivitek D952HD sn2160130 was send out for
warranty repair. It's hard to believe
that it has a 5 year warranty...... RMA -
9980
Wed May 21 09:35:33 2014
Steve
Update
SUS
razor beam dumps ETMX_ISCT
7434
Mon Sep 24 17:47:05 2012
Steve
Update
VAC
ready to pump
The IFO will be at atmosphere
overnight. The annuloses are pumped
down. The access connector jam nuts are tightened
14199
Tue Sep 18 14:02:37 2018
Steve
Update
safety
safety training
Yuki Miyazaki received 40m specific basic
safety training.
4350
Thu Feb 24 16:47:26 2011
steve
Configuration
PSL
shutter is back on the PSL output
Uniblitz mechanical shutter was placed
into the beam path of the PSL output with
razor beam trap. The output power was 1.39W
14299
Fri Nov 16 10:26:12 2018
Steve
Update
VAC
single viton O-rings
The 40m vacuum envelope has one large single
O-ring on the OOC west side. All other doors
have double O-ring with annuloses.
2701
Tue Mar 23 10:11:13 2010
steve
Update
PEM
small air cond unit failed yesterday
Old control room air condition failed yesterday
around noon. It was blowing 80-85F hot air
for about 2-3 hours at racks 1Y4-7 and the
9257
Tue Oct 22 10:12:33 2013
Steve
Update
PEM
south arm AC intake duct checked
The 4th week of no wet mopping
of the floor and no wet wiping
the vacuum envelope.
8356
Tue Mar 26 16:36:24 2013
Steve
Update
40m Upgrading
table leveling mounts go here
8372
Fri Mar 29 16:30:27 2013
Steve
Update
40m Upgrading
table leveling mounts go here
9582
Tue Jan 28 16:26:40 2014
Steve
Update
VAC
vacuum computers are back without safety
9599
Wed Feb 5 08:14:59 2014
Steve
Update
VAC
vacuum computers are back without safety
12209
Tue Jun 21 14:12:10 2016
Steve
Update
PEM
vacuum envelope wiped
I wiped down the cranes with wet towel
and Mario our janitor did the chamber tops
with the tubes.
9514
Thu Jan 2 10:50:24 2014
Steve
Update
VAC
vacuum monitor is still blank
The date is correct on this monitor.
Last stored RGA scan data Dec 20,
2013
9515
Thu Jan 2 13:35:06 2014
Koji
Update
VAC
vacuum monitor is still blank
We probably need to restart the machine,
but I didn't want to touch c1vac1 and c1vac2.
9581
Tue Jan 28 11:13:50 2014
Koji
Update
VAC
vacuum monitor is still blank
[Steve Koji]
We
pushed the reset button of c1vac1 and c1vac2
11695
Fri Oct 16 18:27:52 2015
Steve
Update
VAC
vacuum normal condition
Vacuum normal configuration with VM1-closed,
VM2-open valve positions. Power load normal
24V 0.2A
14028
Thu Jun 28 08:09:51 2018
Steve
Update
CDS
vacuum pneumatic N2 pressure
The fardest I can go back on channel C1:
Vac_N2pres is 320 days
C1:Vac-CC1_Hornet Presuure gauge
14029
Thu Jun 28 10:28:27 2018
rana
Update
CDS
vacuum pneumatic N2 pressure
we disabled logging the N2 Pressure to
a text file, since it was filling up disk
space. Now it just sends an email to our
1459
Wed Apr 8 09:36:20 2009
steve
Configuration
VAC
valve condition changed to BG to calibrate the RGA
Vacuum
normal valve condition was changed to accommodate
SRS-RGA calibration.
9443
Thu Dec 5 11:06:43 2013
Steve
Update
Cameras
viewport video ccd cameras are all covered
10076
Thu Jun 19 17:28:19 2014
Steve
Update
PSL
window device is ready for test
The window is at the north west corner
of the PSL enclosure.
The 1 mm thick BK7 window is AR coated
12346
Thu Jul 28 08:42:36 2016
Steve
Update
SUS
wire clamp
The clamp is in the machine for milling
off the grooves. It's condition is normal.
The edges needs some 800 sand paper so it
12144
Wed Jun 1 15:01:56 2016
Steve
Update
SUS
wire standoffs update
There are some issues with 5 mm sapphire
prism Atm5. It will cause interference
between one of the prisms and the Side OSEM.
12146
Thu Jun 2 16:35:44 2016
Koji
Update
SUS
wire standoffs update
Gap of the prism from the mirror
Sag: s = R(1-Cos[ArcSin[d/2/R]])
- Mirror curvature sag for 2mm
12454
Tue Aug 30 15:44:28 2016
Steve
Update
SUS
wire standoffs update
100
Sapphire prisms ordered. Delivery date
9-30-2016