40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 3 of 348  Not logged in ELOG logo
Entry  Thu Nov 11 04:32:53 2010, yuta, Summary, CDS, found poor contact of DAC cable, previous A2L results were wrong 
Entry  Thu Nov 11 05:56:04 2010, yuta, Summary, IOO, setting up temporary oplev for coil balancing of MCs MC2coils.png
    Reply  Fri Nov 12 06:10:24 2010, yuta, Update, IOO, MC aligned (without coil balancing) MCalignCALIB.png
Entry  Sat Nov 13 15:53:05 2010, yuta, Update, CDS, diagonalization of MC input matrix MCspectraNov09.pngMCspectraNov13.pngMC1spetra_wrongmatrix.png
Entry  Tue Nov 16 03:33:22 2010, yuta, Update, IOO, aligned Faraday, beam reached SM just before PRM MCalignNov16.png
Entry  Wed Nov 17 02:53:41 2010, yuta, Update, IOO, placed new PRM to BS table 
Entry  Wed Nov 17 20:44:59 2010, yuta, Summary, CDS, no QPD channels on c1sus machine today 
Entry  Thu Nov 18 00:40:31 2010, yuta, Update, IOO, PRM reflected beam reached AP table 
Entry  Thu Nov 18 16:32:21 2010, yuta, Summary, CDS, current damping status for all optics c1sus handles c1susdampings.png
Entry  Fri Nov 19 17:12:22 2010, yuta, Update, CDS, ETMX damped, but with weird TO_COIL matrix ETMXdamping.png
Entry  Sat Nov 20 01:58:56 2010, yuta, HowTo, CDS, editting RT models and MEDM screens 
Entry  Sat Nov 20 02:25:30 2010, yuta, Update, CDS, 2 LOCKINs for suspension models LockinRoll.png
    Reply  Sat Nov 20 03:37:11 2010, yuta, Summary, CDS, CDS time delay measurement - the ripple c1tst16Kdelay.png
Entry  Mon May 21 21:27:39 2012, yuta, Update, CDS, MEDM suspension screens using macro 
    Reply  Tue May 22 20:46:38 2012, yuta, Update, CDS, MEDM suspension screens using macro 
Entry  Thu May 24 16:13:05 2012, yuta, Update, Computers, ASS scripts on new ubuntu machines 
    Reply  Tue May 29 21:05:30 2012, yuta, Update, IOO, PMC, MC alignment are shit 
Entry  Wed May 30 01:35:15 2012, yuta, Update, Green Locking, aligned Y arm green beam 
Entry  Wed May 30 15:51:22 2012, yuta, Update, IOO, MC beam spot oscillation specMC3_onoff_localdamping.pdf
    Reply  Wed May 30 19:27:38 2012, yuta, Update, IOO, MC beam spot oscillation 
Entry  Thu May 31 01:27:16 2012, yuta, Update, Green Locking, PSL and Y arm green beams aligned 
Entry  Thu May 31 01:36:17 2012, yuta, Update, Green Locking, GREEN_TRX/GREEN_TRY PDs 
Entry  Thu May 31 02:27:24 2012, yuta, Update, IOO, script for reliefing MC WFS 
Entry  Thu May 31 04:03:17 2012, yuta, Update, IOO, script for MC beam spot measurement 
Entry  Thu May 31 16:19:07 2012, yuta, Update, Green Locking, temperature setting for PSL doubling crystal 
Entry  Sat Jun 2 03:19:37 2012, yuta, Update, Green Locking, Y green beat note found? - too small CIMG1437.JPG
Entry  Tue Jun 5 21:09:40 2012, yuta, Update, Computer Scripts / Programs, hacked ezca tools 
Entry  Wed Jun 6 02:28:02 2012, yuta, Update, Green Locking, tried to see Yarm length change with weak beat note beatycoarseringdown20120605.pngbeatysetup20120605.png
Entry  Wed Jun 6 15:16:00 2012, yuta, Update, IOO, MC WFS offsets adjusted 
Entry  Wed Jun 6 21:11:45 2012, yuta, Update, Green Locking, improved Y arm green alignment beatygreenpower20120606.png
Entry  Thu Jun 7 01:46:05 2012, yuta, Summary, Green Locking, Y green beat - found it!! CIMG1504.JPG
    Reply  Thu Jun 7 02:25:27 2012, yuta, Update, Green Locking, improved Y arm green alignment - even more beatygreenpower20120607.png
    Reply  Thu Jun 7 02:59:31 2012, yuta, Update, Green Locking, Y green beat - found it!! 
Entry  Thu Jun 7 03:37:26 2012, yuta, Update, CDS, mx_stream restarted on c1lsc, c1ioo  
Entry  Thu Jun 7 05:39:41 2012, yuta, Update, Green Locking, coarsely stabilized Y arm length with ALS MyFirstALS20120607.png
    Reply  Thu Jun 7 18:46:13 2012, yuta, Update, SUS, PRM oplev centered 
Entry  Fri Jun 8 15:08:27 2012, yuta, Update, Green Locking, aligned/mode-matched Y green beat setup 
Entry  Mon Jun 11 21:50:08 2012, yuta, Update, Green Locking, beatbox looks OK CIMG1522.JPG
Entry  Tue Jun 12 01:58:33 2012, yuta, Update, Green Locking, aligned Y arm to Y end green 
    Reply  Tue Jun 12 20:35:46 2012, yuta, Update, Green Locking, c1gcv recompiled c1gcv20120612-2.png
Entry  Tue Jun 12 23:18:18 2012, yuta, Update, Green Locking, I-Q signals for the beat FINEIQplot20120612.pngCOARSEIQplot20120612.pngbeatysetup20120612.png
Entry  Wed Jun 13 02:11:59 2012, yuta, Update, Green Locking, my first modescan (sort of) modescan20120612_1.png
    Reply  Wed Jun 13 03:03:38 2012, yuta, Update, Green Locking, my first modescan (sort of) 
Entry  Wed Jun 13 17:39:13 2012, yuta, Update, Green Locking, calibrating the beatbox ALS-BEATY_COARSE_I_IN1_DQ.pngALS-BEATY_COARSE_Q_IN1_DQ.pngALS-BEATY_FINE_I_IN1_DQ.pngALS-BEATY_FINE_Q_IN1_DQ.png
Entry  Thu Jun 14 01:36:34 2012, yuta, Update, Green Locking, can't scan Y arm for 1FSR BEATY_COARSE_LoopOnOff.png
Entry  Thu Jun 14 04:53:39 2012, yuta, Summary, Green Locking, designing ALS loop for mode scan ALSloop.pngALSopenloop.pngyarmlength.png
Entry  Thu Jun 14 21:37:37 2012, yuta, Update, Green Locking, succeeded in 1FSR mode scan YarmScan20120614.png
    Reply  Fri Jun 15 00:50:54 2012, yuta, Update, Green Locking, scanned Y arm for 5FSR YarmScan20120614_2.png
Entry  Fri Jun 15 13:33:39 2012, yuta, Update, Green Locking, ADC noise contribution to ALS YarmALSnoise20120615.png
Entry  Sat Jun 16 01:03:21 2012, yuta, Update, Green Locking, used longer delay line for mode scan YarmScan20120615.png
ELOG V3.1.3-