Wed Jul 26 11:31:10 2023, JC, Update, Electronics, Acromag work 
|
Wed Jul 26 16:53:02 2023, Yehonathan, Update, Electronics, XEND Acromag work
|
Wed Jul 26 17:07:32 2023, Yehonathan, Update, Electronics, XEND Acromag work 
|
Thu Jul 20 16:29:38 2023, yehonathan, Update, SUS, Preparing for ETMX free swing test
|
Thu Jul 20 18:42:51 2023, yehonathan, Update, SUS, ETMX free swing test
|
Fri Jul 21 11:44:44 2023, yehonathan, Update, SUS, ETMX free swing test
|
Tue Jul 25 16:33:17 2023, yehonathan, Update, SUS, ETMX free swing test  
|
Mon Jul 24 19:56:41 2023, Yehonathan, Update, CDS, rossa can't boot
|
Mon Jul 24 23:01:10 2023, Koji, Summary, CDS, FIXED: rossa can't boot
|
Mon Jul 17 17:52:04 2023, Reuben, Update, ALS, Tabletop setup   
|
Wed Jul 19 22:51:47 2023, rana, Update, ALS, Tabletop ALS-Moku controller setup
|
Thu Jul 20 22:24:59 2023, Reuben, Update, ALS, Tabletop ALS-Moku controller setup 
|
Thu Jul 20 17:28:03 2023, Koji, Update, BHD, BHD Platform OMC cables
|
Thu Jul 20 14:48:51 2023, Beam Profiler Laptop, Update, Daily Progress, New Beam Profiler Laptop
|
Wed Jul 19 21:28:27 2023, Reuben, Update, ALS, Locked XEND green laser with high transmission 
|
Wed Jul 19 16:07:50 2023, Hiroki, Update, General, Borrowed visual fault locator from QIL
|
Wed Jul 19 15:52:43 2023, Hiroki, Update, PSL, Restored PMC alignment
|
Fri Jul 7 21:54:44 2023, andrei, Update, PEM, Foam setup
|
Sat Jul 15 13:27:39 2023, andrei, Update, PEM, Foam setup
|
Tue Jul 18 16:01:01 2023, andrei, Update, PEM, Foam setup 
|
Tue Jul 18 15:57:55 2023, Reuben, Update, ALS, I was able to lock the XEND green laser using Moku:Go digital filter.
|
Mon Jul 17 15:56:22 2023, JC, Update, General, Cleanroom Assembly  
|
Fri Jul 14 17:36:17 2023, Hiroki, Update, General, Borrowed beam profilers
|
Thu Jul 13 14:47:38 2023, yuta, Bureaucracy, General, Things we need to fix
|
Thu Jul 13 12:15:12 2023, JC, Update, General, Lab walkthrough
|
Thu Jul 13 06:18:37 2023, Hiroki, Summary, Calibration, Calibrations of actuators and optical gain 7x
|
Wed Jun 28 10:23:23 2023, Hiroki, Update, VAC, Pumping down 
|
Thu Jun 29 20:10:17 2023, Koji, Update, VAC, Pumping down
|
Tue Jul 11 17:21:58 2023, Koji, Update, VAC, Pumping down
|
Mon Jul 10 17:12:02 2023, Mayank, Update, Electronics, ETMX Coil Driver Mode
|
Fri Jul 7 13:33:48 2023, JC, Configuration, Daily Progress, Alignment and restoring the IFO
|
Fri Jul 7 15:24:38 2023, Koji, Configuration, Daily Progress, Alignment and restoring the IFO
|
Fri Jul 7 17:29:16 2023, yuta, Summary, ASC, IFO alignment is in a strange state
|
Fri Jul 7 20:09:53 2023, Koji, Summary, ASC, IFO alignment is in a strange state
|
Mon Jul 10 15:22:25 2023, yuta, Summary, ASC, IFO alignment is in a strange state
|
Fri Jul 7 20:34:43 2023, Hiroki, Summary, BHD, BHD alignment has been restored  
|
Thu Jul 6 11:25:32 2023, yehonathan, Update, Computers, SUS2 is down
|
Wed Jul 5 11:43:23 2023, JC, Update, VAC, Pumpdown begun this morning
|
Thu Jun 29 01:52:26 2023, Koji, Summary, General, IFO back in operation
|
Wed Jun 28 11:54:23 2023, Koji, Update, General, 40m LASER HAZARD
|
Mon Jun 26 13:11:18 2023, Koji, Update, VAC, N2 Vent   
|
Tue Jun 27 19:49:37 2023, Koji, Update, VAC, Pumping down attemp
|
Tue Jun 27 19:19:17 2023, Koji, Summary, General, 5ft x 12 ft x 2ft optical table removal 8x
|
Mon Jun 26 18:37:35 2023, Koji, Update, safety, 40m Lab Laser Safe
|
Mon Jun 26 10:21:44 2023, Koji, Update, CDS, Deleted harmful script link on the IFO ALIGN screen
|
Sat Jun 24 21:31:02 2023, Mayank, Update, Electronics, Transfer function of the new coil driver board   
|
Fri Jun 16 14:03:08 2023, Andrei, Update, PEM, Lab temperature psd  
|
Thu Jun 22 14:21:17 2023, Andrei, Update, PEM, Lab temperature psd
|
Fri Jun 23 10:55:08 2023, Andrei, Update, PEM, Lab temperature psd  
|
Fri Jun 23 01:32:46 2023, Reuben, Update, ALS, Taking frequency response of the Y arm green laser PDH controller
|
Fri Jun 23 00:29:16 2023, Reuben, Update, ALS, Efforts to align the cavity mirrors
|
Thu Jun 22 23:09:32 2023, Koji, Update, ALS, X end green beam alignment
|
Fri Jun 16 23:09:31 2023, Mayank, Update, , IFO working after ETMX electronics upgrade
|
Fri Jun 16 23:23:56 2023, Koji, Update, , IFO working after ETMX electronics upgrade
|
Mon Jun 19 01:05:49 2023, Koji, Update, , IFO working after ETMX electronics upgrade
|
Wed Jun 21 08:21:03 2023, JC, Update, , IFO working after ETMX electronics upgrade
|
Thu Jun 22 00:27:27 2023, Koji, Update, , IFO working after ETMX electronics upgrade  
|
Thu Jun 22 00:47:00 2023, Koji, Update, , IFO working after ETMX electronics upgrade
|
Thu Jun 22 01:04:42 2023, Koji, Update, , IFO recovery
|
Thu Jun 22 22:34:43 2023, Koji, Update, , IFO recovery
|
Mon Apr 13 16:51:49 2020, rana, Summary, DAQ, NODUS: rsyncd daemon / service set up
|
Wed Jun 21 21:01:59 2023, Koji, Summary, DAQ, NODUS: rsyncd daemon / service set up
|
Thu Jun 22 16:01:54 2023, rana, Summary, DAQ, NODUS: rsyncd daemon / service set up
|
Wed Jun 21 11:16:19 2023, Andrei, Update, PEM, Ambient Temperature sensor noise measurements   
|
Tue Jun 6 21:23:37 2023, advait, Update, PEM, Early heater prototype 
|
Tue Jun 20 17:52:39 2023, advait, Update, PEM, Early heater prototype
|
Tue Jun 20 11:50:55 2023, Mayank, Update, LSC, Weiner Filtering
|
Tue Feb 22 18:47:51 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement 
|
Fri Feb 25 14:00:08 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement 
|
Fri Feb 25 14:48:53 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement 
|
Sat Feb 26 23:48:14 2022, Koji, Update, SUS, ETMY SUS Electronics Replacement
|
Mon Feb 28 15:51:07 2022, Ian MacMillan, Update, SUS, ETMY 1Y4 Electronics Replacement   
|
Thu Mar 3 04:11:36 2022, Koji, Update, SUS, ETMY 1Y4 Electronics Replacement  
|
Thu Mar 3 04:24:23 2022, Koji, Update, SUS, ETMY 1Y4 Electronics Replacement 
|
Thu Mar 3 17:21:11 2022, Ian MacMillan, Update, SUS, ETMY 1Y4 Electronics Replacement
|
Sat Mar 5 02:03:46 2022, Koji, Update, SUS, ETMY 1Y4 Electronics Replacement 6x
|
Mon Mar 21 14:22:52 2022, Anchal, Update, SUS, ETMY Alignmnet offsets needed to be changed
|
Fri Jun 16 20:38:21 2023, Koji, Update, SUS, QPD whitening euro card (ETMX Electronics Replacement)
|
Tue Mar 1 19:26:24 2022, Koji, Update, SUS, ETMY SUS Electronics Replacement 
|
Mon Mar 7 16:44:15 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement 6x
|
Fri Mar 11 16:43:03 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement
|
Fri Mar 25 11:39:14 2022, Anchal, Update, SUS, ETMY SUS Electronics Replacement - Questions
|
Mon Mar 28 16:25:34 2022, Ian MacMillan, Update, SUS, ETMY SUS Electronics Replacement - Questions
|
Thu Mar 17 11:40:41 2022, Paco, Update, SUS, ETMY green PZT HV supply
|
Wed May 31 16:26:28 2023, Yehonathan, Update, SUS, ETMX Coil driver upgrade
|
Thu Jun 1 10:03:47 2023, Yehonathan, Update, SUS, ETMX Coil driver upgrade
|
Mon Jun 5 10:01:41 2023, Yehonathan, Update, SUS, ETMX fast-channel-watchdog was implemented
|
Mon Jun 12 13:08:09 2023, Yehonathan, Update, SUS, ETMX fast-channel-watchdog was implemented 
|
Wed Jun 14 23:21:03 2023, Koji, Update, SUS, ETMX fast-channel-watchdog was implemented
|
Fri Jun 16 18:55:21 2023, Yehonathan, Update, SUS, Mounting new boards on 1X9 rack and cleanup 6x
|
Thu Jun 15 21:30:35 2023, Mayank, Update, SUS, ETMX Electronics upgrade
|
Tue Jun 13 14:12:34 2023, Mayank, Configuration, , Restarted the NDS2 script on Megatron
|
Fri Jun 9 17:39:48 2023, yuta, Update, LSC, High bandwidth YARM test 
|
Mon Dec 5 12:05:29 2022, Anchal, Update, CDS, c1sus2 all FE models crashed spontaneously 
|
Thu Feb 9 10:05:37 2023, yuta, Update, CDS, c1sus2 all FE models crashed spontaneously again
|
Mon May 29 11:04:13 2023, Paco, Update, CDS, c1sus2 all FE models crashed spontaneously again
|
Thu Jun 1 08:34:06 2023, Paco, Update, CDS, ITMX UL coil and BS oplev rms   
|
Fri Jun 2 19:03:57 2023, Paco, Update, CDS, C1SUS DAC failure (Re: ITMX UL coil and BS oplev rms)   
|
Mon Jun 5 15:34:27 2023, Paco, Update, CDS, C1SUS DAC-0 replacement 6x
|
Thu Jun 8 10:31:46 2023, yuta, Update, CDS, c1sus2 all FE models crashed spontaneously again and IMC/vertex optics damping stopped  
|
Wed Jun 7 17:05:36 2023, yuta, Summary, LSC, RF FPMI recovered after c1sus DAC card replacement  
|
Sat Jun 3 19:56:59 2023, Paco, Update, Calibration, ITMY calibration with ALS and swept line 
|
Mon Jun 5 18:42:13 2023, Paco, Update, Calibration, ITMY calibration with ALS and swept line
|
Wed Jun 7 15:51:47 2023, Koji, Update, Calibration, ITMY calibration with ALS and swept line
|
Fri Jun 2 17:01:20 2023, Reuben, Update, ALS, Getting comfortable with the ALS 
|
Fri Jun 2 10:59:20 2023, advait, Update, PEM, Mass for temperature control
|
Fri Jun 2 11:47:33 2023, Koji, Update, PEM, Mass for temperature control
|
Fri Jun 2 16:45:46 2023, advait, Update, PEM, Mass for temperature control
|
Wed May 24 13:19:28 2023, Paco, Update, BHD, BH44 and BH55 dc transimpedance modified   
|
Wed May 24 17:36:25 2023, Paco, Update, BHD, BH44_I content and PRC alignment   
|
Wed May 31 10:23:40 2023, Yehonathan, Update, BHD, Sensing matrix model
|
Wed May 31 12:08:07 2023, rana, Update, BHD, Sensing matrix model
|
Fri May 19 15:25:00 2023, Mayank, Update, PSL, PSL tripped - removed internal fans 
|
Fri May 26 15:04:12 2023, JC, Update, PSL, PSL Fans Replaced  
|
|