40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 39 of 357  Not logged in ELOG logo
    Reply  Mon Jul 26 10:02:42 2010, josephb, Update, CDS, Rerouted RFM around c1lsc, took RFM card out of c1lsc 
Entry  Mon Jul 26 12:31:36 2010, kiwamu, Update, CDS, front end machine for the X end 
Entry  Mon Jul 26 14:24:46 2010, josephb, kiwamu, Update, CDS, RFM test take 1 
Entry  Thu Jul 29 11:33:38 2010, kiwamu, Update, CDS, PCI5565 driver for RFM 
Entry  Thu Jul 29 12:13:28 2010, kiwamu, Summary, CDS, near term plan current_setup_v2.png
Entry  Thu Jul 29 12:31:24 2010, josephb, Update, CDS, Working DAC, working IOP - next up SUS Simple_Green_Control.png
Entry  Thu Jul 29 15:35:21 2010, josephb, kiwamu, Update, CDS, Working out ADC/DAC/BO wiring 
    Reply  Thu Jul 29 17:12:48 2010, josephb, kiwamu, Update, CDS, Re:Working out ADC/DAC/BO wiring DSC_2302.png
Entry  Sat Jul 31 17:37:36 2010, josephb, Update, CDS, Cables needed for CDS test 
    Reply  Tue Aug 3 11:17:10 2010, kiwamu, Update, CDS, Diagrams for Cables needed for CDS test sus_wiring.pngsus_new_wiring.pngsus_missing_stuff.png
Entry  Wed Aug 11 13:28:44 2010, josephb, Update, CDS, New cdsIPCx parts, old part breaks models 
Entry  Thu Aug 12 11:19:04 2010, kiwamu, Update, CDS, current status 
Entry  Thu Aug 12 11:59:31 2010, kiwamu, HowTo, CDS, set up ntp daemom 
    Reply  Thu Aug 12 14:01:53 2010, josephb, Update, CDS, current status 
    Reply  Thu Aug 12 18:30:08 2010, kiwamu, Update, CDS, Re: current status 
    Reply  Tue Aug 17 02:07:11 2010, Yoichi, Update, CDS, DACs have correct number of channels 
Entry  Wed Aug 18 11:40:59 2010, josephb,kiwamu,yoichi, Update, CDS, End station working with latest RCG code 
Entry  Wed Aug 18 12:24:58 2010, josephb,kiwamu, Update, CDS, shmem issue 
    Reply  Mon Aug 23 19:55:31 2010, kiwamu, Update, CDS, some progress 
Entry  Thu Aug 26 13:08:03 2010, josephb, Update, CDS, Watch dogs for Vertex optics turned off 
    Reply  Thu Aug 26 17:10:26 2010, kiwamu, Update, CDS, new CDS test 
    Reply  Fri Aug 27 14:03:43 2010, kiwamu, Update, CDS, Watch dogs for Vertex optics turned off 
    Reply  Fri Aug 27 17:27:41 2010, kiwamu, Update, CDS, new CDS test 
    Reply  Fri Aug 27 19:30:31 2010, rana, Update, CDS, SLOW controls 
    Reply  Mon Aug 30 22:45:49 2010, kiwamu, Update, CDS, binary outputs for the new CDS 
Entry  Tue Aug 31 02:50:45 2010, kiwamu, Update, CDS, vertex suspensions controlled by the new CDS 
Entry  Tue Aug 31 11:50:14 2010, kiwamu, Update, CDS, maximum number of BIOs 
Entry  Tue Aug 31 16:42:26 2010, josephb, Update, CDS, Temporarily reverting to CDS revision 2005 
Entry  Wed Sep 1 12:24:47 2010, josephb, Update, CDS, Trying to get up to date CDS code runnning 
Entry  Thu Sep 2 16:45:48 2010, josephb, Update, CDS, Numbering scheme of the PCI bus 
Entry  Thu Sep 2 17:43:30 2010, josephb, Update, CDS, One working BO output module, others not so much 
Entry  Mon Sep 6 20:38:58 2010, Koji, Update, CDS, Susension model reviewed suspension_model.pdf
    Reply  Mon Sep 6 21:08:44 2010, rana, Update, CDS, Susension model reviewed 
Entry  Tue Sep 7 15:31:28 2010, josephb, alex, Update, CDS, Binary Output working/ IO chassis fixed 
Entry  Wed Sep 8 11:56:24 2010, kiwamu, Summary, CDS, September CDS test plan 
Entry  Wed Sep 8 14:44:37 2010, josephb, Update, CDS, Updated parse_mdl_to_ipc.py and feCodeGen.pl 
Entry  Thu Sep 9 14:42:40 2010, josephb, Update, CDS, Updating suspensions model SingleSUS.png
Entry  Mon Sep 13 10:22:48 2010, josephb, Update, CDS, RCG bugs/feature request wiki page 
Entry  Wed Sep 15 14:34:57 2010, josephb, Summary, CDS, Plan for RFM switch over 
Entry  Fri Sep 17 12:11:42 2010, josephb, Update, CDS, Downs update 
Entry  Fri Sep 17 14:55:01 2010, josephb, Update, CDS, Took 5565 RFM card from IOVME to place in the new IOO chassis 
Entry  Mon Sep 20 11:39:45 2010, josephb, Update, CDS, Switch over 
Entry  Mon Sep 20 16:59:26 2010, josephb, Update, CDS, Megatron in 1X2 rack, to be come c1ioo 
Entry  Tue Sep 21 16:05:21 2010, josephb, Update, CDS, First pass at rack diagram 1X1_1X2_racks.png
Entry  Wed Sep 22 16:35:45 2010, josephb, Update, CDS, Fibers pulled, new FB install tomorrow 
Entry  Thu Sep 23 12:05:20 2010, josephb, alex, Update, CDS, fb40m down, new fb in progress 
    Reply  Thu Sep 23 21:01:11 2010, josephb, alex, Update, CDS, fb40m still down, new fb still in progress 
Entry  Fri Sep 24 22:58:40 2010, josephb, Update, CDS, Modified front end medm screens 
    Reply  Sun Sep 26 18:29:23 2010, rana, John, Update, CDS, Modified front end medm screens megamind-poster3.jpg
Entry  Mon Sep 27 17:35:13 2010, josephb, Update, CDS, Updated Suspension screens/Megatron now c1ioo/Further work on fb MC1_Example_Screen.png
ELOG V3.1.3-