40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 38 of 173  Not logged in ELOG logo
Entry  Wed Dec 23 15:43:02 2015, rana, Summary, PSL, PMC FSS IMC RF summing box PMCFSSsummingBox.png
Entry  Wed Dec 23 03:27:04 2015, rana, Update, Computer Scripts / Programs, LHO EPICS slow down 
Entry  Tue Nov 10 19:25:42 2015, gautam, Update, General, FS725 Rubidium reference 
    Reply  Tue Dec 22 16:44:03 2015, gautam, Update, General, FS725 Rubidium reference - REPAIRED FS725_repaired.jpg
Entry  Tue Nov 13 11:30:54 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser ETMX_sch.png
    Reply  Tue Nov 13 16:18:51 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile 
       Reply  Tue Nov 13 20:13:07 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile 
       Reply  Mon Nov 19 20:03:53 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table ETMX_endtable_New_Model.pdf
          Reply  Mon Nov 19 20:17:53 2012, Jenne, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table 
          Reply  Mon Nov 19 22:42:14 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table 
             Reply  Tue Nov 20 11:40:19 2012, rana, Configuration, Green Locking, End table upgrade for auxiliary green laser : ETMX layout on new table 
          Reply  Wed Dec 12 11:04:45 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table ETMX_endtable_New_Model.png
             Reply  Thu Jan 10 12:41:06 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : wiki page 
                Reply  Tue Mar 5 00:24:52 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : customized mount 
                   Reply  Tue Mar 19 14:21:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade : INVENTORY Endtable_inventory.pdf
                      Reply  Tue Mar 19 19:19:50 2013, Jenne, Update, 40m Upgrading, Endtable upgrade : INVENTORY 
                         Reply  Wed Mar 20 14:00:21 2013, Steve, Update, 40m Upgrading, Endtable upgrade  
                            Reply  Wed Mar 20 15:51:54 2013, Manasa, Update, 40m Upgrading, Endtable upgrade  Endtable_inventory.pdf
                               Reply  Thu Mar 21 08:11:53 2013, Steve, Update, 40m Upgrading, ETMY table swap 
                                  Reply  Thu Mar 21 08:46:46 2013, Manasa, Update, 40m Upgrading, ETMY table swap 
                                     Reply  Thu Mar 21 17:06:34 2013, Steve, Update, 40m Upgrading, ETMY table is out ETMYtableSupport.jpg
                                        Reply  Mon Mar 25 18:07:31 2013, Steve, Update, 40m Upgrading, ETMY table is out shimmingEE.jpg
                                           Reply  Tue Mar 26 16:10:31 2013, Jamie, Update, 40m Upgrading, ETMY table leveling end-tabel-leveling.png
                                              Reply  Tue Mar 26 16:36:24 2013, Steve, Update, 40m Upgrading, table leveling mounts go here  optabSTAND.PDFswivvelMountEE.jpg
                                                 Reply  Fri Mar 29 16:30:27 2013, Steve, Update, 40m Upgrading, table leveling mounts go here  
                                                    Reply  Fri Mar 29 16:35:54 2013, Steve, Update, 40m Upgrading, Endtable upgrade 
                                                       Reply  Tue Apr 2 17:23:23 2013, Steve, Update, 40m Upgrading, new ETMY optical table & enclosure in place EEopt1d.jpg
                                                          Reply  Thu Apr 4 17:23:05 2013, Steve, Update, 40m Upgrading, ETMY optical table & enclosure is ready for optics 
                                                             Reply  Fri Apr 5 01:18:34 2013, Manasa, Update, 40m Upgrading, Not a fan of the new plastic box yet 
                                                                Reply  Sat Apr 6 09:21:36 2013, rana, Update, 40m Upgrading, Not a fan of the new plastic box yet 
                                                                   Reply  Mon Apr 8 16:37:26 2013, Steve, Update, 40m Upgrading, ETMY enclosure wall transmission 
                                                             Reply  Mon Apr 22 17:43:09 2013, Steve, Update, 40m Upgrading, ETMY optical table & enclosure is ready for optics more2.jpg
                                                                Reply  Mon Apr 22 19:48:56 2013, Jenne, Update, 40m Upgrading, 4 pins enough? 
                                                                   Reply  Tue Apr 23 15:00:20 2013, Jenne, Update, 40m Upgrading, 4 pins enough? 
                Reply  Mon Mar 25 18:42:38 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : Timeline Endtable_progress.pdf
                   Reply  Fri Mar 29 00:27:06 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : Assembly IMG_0433.JPGIMG_0434.JPG
                      Reply  Fri Apr 5 01:28:56 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : populating the table 
                         Reply  Tue Apr 9 00:15:18 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : populating the table 
                            Reply  Wed Apr 10 14:25:04 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : LWE Alberto laser beam profile LWE_Alberto_BP.pngbeam_waist.zip
                            Reply  Wed Apr 17 02:20:13 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress TRY_OPL.jpgGRY.jpg
                               Reply  Wed Apr 24 15:27:59 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress: New layout ETMY_endtable_New.png
                                  Reply  Tue May 7 19:06:45 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress ETMY_endtable_New.png
                                     Reply  Thu May 9 01:36:32 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 0509.png
                                        Reply  Thu May 9 22:29:23 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 
                                           Reply  Fri May 10 20:05:21 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 
                                              Reply  Mon May 13 21:35:55 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 
                                                 Reply  Tue May 14 14:24:56 2013, Steve, Update, 40m Upgrading, enclosure removal  
                                                    Reply  Thu May 16 08:32:05 2013, Steve, Update, 40m upgrading, ETMY op table disabled linguaa.jpg
                                                       Reply  Fri May 17 00:32:32 2013, Annalisa, Update, 40m upgrading, ETMY - progress IMG_0536.JPG
                                                          Reply  Fri May 17 15:38:51 2013, Steve, Update, 40m upgrading, ETMY enclosure is on the way back 
                                                          Reply  Fri May 17 16:06:14 2013, rana, Update, 40m upgrading, ETMY op table disabled 
                                                             Reply  Fri May 17 18:24:04 2013, Annalisa, Update, 40m upgrading, ETMY - progress 
                                                                Reply  Thu May 23 00:16:32 2013, Annalisa, Update, 40m upgrading, ETMY - progress TransMonAndOplev.jpg
                                                                   Reply  Thu May 23 12:02:48 2013, Steve, Update, endtable upgrade, ETMY - oplev ETMYopl.jpg
                                                                      Reply  Thu May 30 11:10:00 2013, Steve, Update, endtable upgrade, ETMY - oplev ETMYoplev.jpg
                                                                         Reply  Thu May 30 20:45:53 2013, Annalisa, Update, endtable upgrade, ETMY - oplev 
                                                                            Reply  Fri May 31 11:15:01 2013, Annalisa, Update, endtable upgrade, ETMY - Mode Matching for green - new calculation 
                                                                         Reply  Fri Sep 11 10:56:47 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough ETMY-Nfeedt.jpg
                                                                            Reply  Tue Sep 15 16:49:08 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough ETMYsFeedt.jpg
                                                                               Reply  Thu Sep 17 02:22:53 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough 
                                                                   Reply  Fri May 24 02:12:50 2013, Annalisa, Update, 40m upgrading, ETMY - Mode Matching for green ModeMatchingGreen.jpgModeMatchingGreenZoom.jpgXYpath.jpg
                                                                      Reply  Fri May 24 11:38:00 2013, Koji, Update, 40m upgrading, ETMY - Mode Matching for green 
                                                                         Reply  Fri May 24 12:50:25 2013, Annalisa, Update, 40m upgrading, ETMY - Mode Matching for green 
                                                                            Reply  Sat May 25 02:03:48 2013, Annalisa, Update, 40m upgrading, ETMY - Mode Matching for green - new calculation ModeMatchingGreenNEW.jpgModeMatchingGreenZoomNEW.jpgXYpathNEW.jpgphoto1.JPGphoto2.JPG
                                                                               Reply  Mon May 27 21:38:53 2013, Annalisa, Update, 40m upgrading, ETMY - Beam Dumps 
                                                                                  Reply  Tue May 28 22:11:23 2013, Annalisa, Update, 40m upgrading, ETMY - Yarm shutter cable 
                                                    Reply  Tue May 21 17:03:45 2013, Steve, Update, endtable upgrade, enclosure tops are sealed  ETMYoptable.jpgsurgtubclamps.jpgquickrelease.jpgreinforcbridge.jpg
                                                       Reply  Thu Jun 6 09:58:13 2013, Steve, Update, endtable upgrade, enclosure to chamber connection thinwallconnector.jpg06061301.PDF
                                                          Reply  Tue Dec 22 16:39:42 2015, Steve, Update, endtable upgrade, ETMY optical table enclosure IMG_0028.JPGIMG_0027.JPGETMY-ISCT_EISOL.jpg
                                                 Reply  Tue May 14 21:03:15 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 
                                                    Reply  Wed May 15 21:27:39 2013, Annalisa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress 
                               Reply  Thu May 2 01:19:41 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress ETMY_0502.png
                         Reply  Tue Apr 9 00:32:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : TRY temporarily in place 
                            Reply  Tue Apr 9 08:37:54 2013, Steve, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : TRY temporarily in place 
                            Reply  Tue Apr 9 21:27:48 2013, Jenne, Update, 40m Upgrading, TRY temporarily in place 
Entry  Tue Dec 22 16:23:33 2015, gautam, Update, IOO, Input alignment to PMC tweaked 
Entry  Thu Dec 17 14:02:05 2015, gautam, Update, CDS, IPC channels for beat frequency control set up 
    Reply  Thu Dec 17 16:44:03 2015, gautam, Update, CDS, ALS Slow control MEDM screen updated ALS_SLOW_17DEC2015.png
Entry  Wed Dec 16 18:34:40 2015, gautam, Update, Green Locking, Green beat channels temporarily set up as IR beat channels 
    Reply  Wed Dec 16 23:15:28 2015, ericq, Update, Green Locking, Green beat channels temporarily set up as IR beat channels 2015-12-16_AUXfreerunning.pdf
Entry  Wed Dec 16 10:56:22 2015, gautam, Update, CDS, hard reboot of FB 
Entry  Wed Dec 16 10:22:14 2015, Steve, Update, IOO, this morning PMClocked.png
Entry  Tue Dec 15 18:08:22 2015, Max Isi, Update, General, Summary archive cleaning cron job 
Entry  Tue Dec 15 11:22:53 2015, gautam, Update, CDS, c1scx and c1asx crashed CDS_FE_STATUS_OVERVIEW_15DEC2015.png
Entry  Wed Nov 18 22:26:33 2015, yutaro, Update, Optical Levers, Calibration of oplevs for ITMY/ETMY calib_etmypit2.pdfcalib_etmyyaw2.pdfcalib_itmypit2.pdfcalib_itmyyaw2.pdfcalib_oplev.zip
    Reply  Wed Nov 18 23:40:01 2015, rana, Update, Optical Levers, Calibration of oplevs for ITMY/ETMY 
       Reply  Thu Nov 19 16:06:54 2015, yutaro, Update, Optical Levers, Calibration of oplevs for ITMY/ETMY 
    Reply  Tue Dec 1 11:26:23 2015, yutaro, Update, Optical Levers, Calibration of oplevs for ITMX/ETMX ep_l.pdfey_l.pdfip_l.pdfiy_l.pdf
       Reply  Thu Dec 3 06:15:38 2015, rana, Update, Optical Levers, Calibration of oplevs for ITMX/ETMX 
          Reply  Thu Dec 3 10:05:07 2015, yutaro, Update, Optical Levers, Calibration of oplevs for ITMX/ETMX 
       Reply  Fri Dec 11 16:16:36 2015, yutaro, Update, Optical Levers, Calibration of oplevs for ITMX/ETMX 
          Reply  Mon Dec 14 23:49:03 2015, ericq, Update, Optical Levers, Calibration of oplevs for ITMX/ETMX 
Entry  Fri Dec 11 23:12:09 2015, Koji, Summary, COC, Loss map measurement document 
Entry  Tue Dec 8 15:57:16 2015, yutaro, Summary, LSC, Power recycling gain estimation from arm loss measurement 
    Reply  Fri Dec 11 09:35:44 2015, yutaro, Update, LSC, Power recycling gain estimation from arm loss measurement LaserOptikAR.png
       Reply  Fri Dec 11 13:28:36 2015, Koji, Update, LSC, Power recycling gain estimation from arm loss measurement 
          Reply  Fri Dec 11 15:37:50 2015, yutaro, Update, LSC, Power recycling gain estimation from arm loss measurement PRG_plot.png
Entry  Wed Nov 25 23:17:34 2015, yutaro, Update, LSC, strange behavior of ASDC 14.png
    Reply  Mon Nov 30 16:33:06 2015, ericq, Update, LSC, strange behavior of ASDC AScentering.png
       Reply  Mon Nov 30 18:27:30 2015, Koji, Update, LSC, strange behavior of ASDC 
    Reply  Thu Dec 10 12:33:04 2015, yutaro, Update, LSC, strange behavior of ASDC 07.png28.pngASDC.png
       Reply  Thu Dec 10 19:53:22 2015, yutaro, Update, LSC, strange behavior of ASDC 30.png11.png49.png
Entry  Tue Dec 8 15:18:29 2015, ericq, Update, Computer Scripts / Programs, Nodus security 
    Reply  Wed Dec 9 23:16:13 2015, rana, Update, Computer Scripts / Programs, Nodus security 
Entry  Wed Dec 9 19:01:45 2015, jamie, Update, CDS, back to fb1 
Entry  Tue Dec 8 11:24:45 2015, yutaro, Summary, Computer Scripts / Programs, Scripts for loss map measurement 
Entry  Thu Dec 3 19:10:28 2015, yutaro, Update, LSC, XARM lock with ITMX actuated and related change on ASS 40.png
    Reply  Mon Dec 7 15:56:35 2015, yutaro, Update, LSC, XARM lock with ITMX actuated and related change on ASS 
Entry  Wed Nov 25 16:40:32 2015, yutaro, Update, LSC, round trip loss of Y arm 
    Reply  Wed Nov 25 23:34:52 2015, yutaro, Update, LSC, round trip loss of Y arm 14.png
       Reply  Fri Nov 27 03:38:23 2015, yutaro, Summary, LSC, round trip loss of Y arm image1.png
          Reply  Fri Nov 27 22:20:24 2015, yutaro, Update, LSC, round trip loss of Y arm log.txt.zip17.png
          Reply  Sat Nov 28 11:46:40 2015, yutaro, Update, LSC, possible error source of loss map measurement 
          Reply  Mon Nov 30 10:41:45 2015, yutaro, Update, LSC, Does a baffle in front of ETMY have effect on loss map measurement? 
             Reply  Mon Nov 30 17:17:30 2015, yutaro, Update, LSC, Does a baffle in front of ETMY have effect on loss map measurement? element2-2.pngelement0-0.pngelement4-4.png
          Reply  Mon Dec 7 11:11:25 2015, yutaro, Summary, LSC, round trip loss of X arm image1-2.JPGsymmetry.png
Entry  Mon Dec 7 10:40:09 2015, yutaro, Update, Computer Scripts / Programs, Added 1 line to UNFREEZE_DITHER.py 
Entry  Mon Nov 30 12:19:38 2015, yutaro, Update, Computer Scripts / Programs, image capture 
    Reply  Sat Dec 5 12:02:25 2015, yutaro, HowTo, Cameras, When image capture does not work... 
       Reply  Sat Dec 5 21:28:33 2015, Koji, HowTo, Cameras, When image capture does not work... 
          Reply  Sat Dec 5 21:57:32 2015, yutaro, HowTo, Cameras, When image capture does not work... 
Entry  Wed Dec 2 17:14:33 2015, yutaro, Update, LSC, Beam on POX11 is possibly not centered well 47.png41.png
    Reply  Fri Dec 4 12:33:52 2015, yutaro, Update, LSC, Beam on POX11 is possibly not centered well image1-3.JPG07.png47.png
       Reply  Fri Dec 4 23:02:13 2015, yutaro, Update, LSC, Beam on POX11 is possibly not centered well image1.JPG56.png04.png
Entry  Fri Dec 4 13:12:41 2015, ericq, Update, CDS, c1ioo Timing Overruns Solved c1ioo_timing.png
Entry  Tue Nov 17 20:40:08 2015, yutaro, Summary, ASC, Loss maps of arm cavities 
    Reply  Wed Nov 18 11:22:13 2015, yutaro, Update, ASC, Loss maps of arm cavities ETM_PIT_up.pngETM_PIT_up.pngETM_YAW_up.png
       Reply  Fri Dec 4 10:18:33 2015, yutaro, Update, ASS, Offset in the dither loop of XARM vs beam spot shift on ETMX offset-angleETMXPIT.pngoffset-angleETMXYAW.png
Entry  Thu Dec 3 03:01:07 2015, gautam, Update, LSC, Calibration of C1CAL  2015-12-C1CAL_Calibration.pdf
Entry  Wed Dec 2 15:52:28 2015, yutaro, Update, LSC, restoration of POXDC 
Entry  Wed Dec 2 15:08:41 2015, ericq, Update, Computer Scripts / Programs, Donatella sudo problem resolved 
Entry  Wed Dec 2 03:34:30 2015, ericq, Update, LSC, SRCL OLG weirdness weirdSRCLG.pdf
Entry  Sat May 16 21:05:24 2015, rana, Update, General, some status 48.png39.png
    Reply  Mon May 18 09:50:00 2015, ericq, Update, General, some status 
       Reply  Mon May 18 11:59:07 2015, rana, Update, General, some status 
          Reply  Tue May 19 16:18:57 2015, ericq, Update, General, crons fixed 
    Reply  Mon May 18 16:28:18 2015, ericq, Update, General, some status 
       Reply  Mon May 18 18:03:12 2015, rana, Update, General, some status CPUtrend.png
          Reply  Tue May 19 00:19:23 2015, rana, Update, General, some status Screen_Shot_2015-05-19_at_12.17.39_AM.png
             Reply  Wed May 20 03:08:27 2015, rana, Update, General, some status 
    Reply  Mon May 18 17:42:14 2015, rana, ericQ, Update, General, some status 
       Reply  Tue May 19 18:55:12 2015, rana, ericQ, Update, General, some status 
          Reply  Wed May 20 11:41:59 2015, ericq, Update, General, some status 
    Reply  Mon Sep 21 00:51:36 2015, rana, Update, General, op340m, autoburt cron =? megatron 
       Reply  Mon Sep 21 11:40:30 2015, ericq, Update, General, Megatron maitenence 
          Reply  Tue Dec 1 17:26:14 2015, Koji, Update, General, Megatron maitenence 
             Reply  Tue Dec 1 20:20:16 2015, Koji, Update, General, Megatron maitenence 
Entry  Tue Dec 1 10:52:52 2015, Steve, Update, General, Dataviewer xAxisEndMissing.png
    Reply  Tue Dec 1 16:55:04 2015, Steve, Update, VAC, Dataviewer fixed 10yrsCC1&4M.png
Entry  Sat Nov 21 00:45:30 2015, Koji, Update, IOO, IMC fix PDRFsignal_cable.JPGQsignal_cable1.JPGQsignal_cable2.JPGQsignal_cable3.JPG
    Reply  Sat Nov 21 00:46:33 2015, Koji, Update, IOO, IMC OLTF IMC_OLTF.pdfPMC_noise_comparison.pdf
       Reply  Sun Nov 22 12:12:17 2015, Koji, Update, IOO, IMC OLTF 
    Reply  Sun Nov 22 07:09:01 2015, rana, Update, IOO, IMC fix 
       Reply  Sun Nov 22 12:07:09 2015, Koji, Update, IOO, IMC fix 
          Reply  Mon Nov 23 22:12:10 2015, Koji, Update, IOO, LO level check for the IMC demod board IMG_2137.JPGIMG_2138.JPG
             Reply  Wed Nov 25 04:24:21 2015, rana, Update, IOO, LO level check for the IMC demod board 
                Reply  Wed Nov 25 10:07:10 2015, Koji, Update, IOO, LO level check for the IMC demod board 
                   Reply  Wed Nov 25 16:46:10 2015, Koji, Update, IOO, LO level check for the IMC demod board D990511-40m_151123.pdf
                      Reply  Wed Nov 25 20:07:35 2015, rana, Update, IOO, LO level check for the IMC demod board 
                   Reply  Mon Nov 30 14:12:14 2015, ericq, Update, LSC, LO level check for the LSC RF distribution box 
                      Reply  Mon Nov 30 15:17:57 2015, Koji, Update, LSC, LO level check for the LSC RF distribution box 
Entry  Mon Nov 23 20:32:43 2015, Koji, Update, LSC, Frequency source fixed, IMC LO level adjusted 
    Reply  Mon Nov 23 21:48:49 2015, Koji, Update, LSC, Frequency source fixed, IMC LO level adjusted IMG_2136.JPGIMG_2129.JPGIMG_2133.JPG
       Reply  Thu Nov 26 19:39:27 2015, Koji, Update, LSC, Current state of the frequency source, and possible improvement RF_Frequency_Source.pdf
          Reply  Sun Nov 29 05:23:57 2015, rana, Update, LSC, Current state of the frequency source, and possible improvement 
             Reply  Sun Nov 29 12:32:26 2015, Koji, Update, LSC, Current state of the frequency source, and possible improvement 
Entry  Wed Nov 25 22:59:42 2015, yutaro, Update, LSC, AS table optics realignment 
Entry  Wed Nov 25 22:37:12 2015, yutaro, Update, LSC, removal of Gautam's cable in 1Y2 and restoration of POYDC 
Entry  Wed Nov 25 14:46:53 2015, gautam, Update, CDS, c1lsc models restarted 
Entry  Tue Nov 24 14:58:40 2015, yutaro, Update, LSC, ITMX misaligned 
Entry  Tue Nov 24 11:18:47 2015, yutaro, Update, Optical Levers, Beam centering for the oplev of ITMY  
Entry  Mon Nov 23 23:42:56 2015, ericq, Update, LSC, ALSY recovered 
    Reply  Tue Nov 24 01:14:23 2015, Koji, Update, LSC, ALSY recovered 
Entry  Mon Nov 23 14:45:39 2015, ericq, Update, Computer Scripts / Programs, New software 
Entry  Fri Nov 13 22:32:54 2015, Koji, Summary, PSL, PMC LO degraded, usual ERA-5 replacement, LO recovered PMC_LO.pngIMG_2093.JPGIMG_2091.JPGIMG_2095.JPGIMG_2096.JPG
    Reply  Sun Nov 15 22:43:48 2015, Koji, Summary, PSL, PMC LO degraded, usual ERA-5 replacement, LO recovered C1-MULTI_E6875C_TIMESERIES-1131408017-86400.pngC1-MULTI_E6875C_TIMESERIES-1131580817-86400.png
       Reply  Mon Nov 16 19:05:59 2015, Koji, Summary, PSL, PMC servo circuit review, follow up measurements 
          Reply  Mon Nov 16 21:32:49 2015, Koji, Summary, PSL, PMC servo circuit review, follow up measurements 
             Reply  Tue Nov 17 16:21:10 2015, Koji, Summary, PSL, PMC servo circuit review, follow up measurements 
                Reply  Wed Nov 18 16:51:58 2015, Koji, Summary, PSL, PMC servo calibration PMC_err_cal.pdf
                   Reply  Wed Nov 18 16:53:17 2015, Koji, Summary, PSL, PMC PZT capacitance 
                      Reply  Wed Nov 18 17:09:22 2015, Koji, Summary, PSL, PMC Servo analysis PMC_OLTF.pdfPMC_DSP.pdf
                         Reply  Fri Nov 20 15:44:12 2015, Koji, Summary, PSL, Added 17.5kHz LPF to the PMC servo PMC_OLTF.pdfPMC_noise_comparison.pdf
Entry  Thu Nov 19 17:06:57 2015, Koji, Configuration, CDS, Disabled auto-launching RT processes upon FE booting 
Entry  Wed Nov 18 10:10:53 2015, ericq, Update, CDS, c1iscey IO chassis missing brackets IMG_1505.jpgIMG_1506.jpg
    Reply  Thu Nov 19 15:16:24 2015, ericq, Update, CDS, c1iscey IO chassis now has brackets 
Entry  Thu Nov 19 14:50:34 2015, Max Isi, Update, General, New 2D histogram plot for summary pages C1-ALL_AB3834_HISTOGRAM2D-1131926417-86400.png
Entry  Wed Nov 18 20:49:05 2015, rana, Update, Computer Scripts / Programs, nodus boot getting full 
    Reply  Wed Nov 18 23:18:07 2015, ericq, Update, Computer Scripts / Programs, nodus /boot cleared up 
Entry  Wed Nov 18 17:32:36 2015, yutaro, Update, Optical Levers, Beam centering for the oplev of ITMY 
Entry  Tue Nov 17 14:31:25 2015, ericq, Update, CDS, 16Hz frame writing temporarily disabled 
    Reply  Tue Nov 17 20:57:43 2015, ericq, Update, CDS, 16Hz frame writing running again 
Entry  Wed Nov 11 22:11:15 2015, Koji, Update, SUS, PSL/IOO maintenance, TM SUS check up TM_SUS.pdfTM_SUS_SD.pdf
    Reply  Thu Nov 12 09:15:56 2015, Steve, Update, SUS, ITMX osems ITMX.png
       Reply  Fri Nov 13 15:20:24 2015, Steve, Update, SUS, OSEMs OSEMs.pngPOSbiasOFF.png
    Reply  Thu Nov 12 09:41:02 2015, Steve, Update, PSL, PMC PMC_ITMX.png
    Reply  Tue Nov 17 00:57:21 2015, ericq, Update, SUS, ITMX UL calmed? TM_nov17.pdfITMX_sensortrend.png
       Reply  Tue Nov 17 15:59:23 2015, rana, Update, SUS, ITMX UL calmed? 
Entry  Tue Nov 17 15:49:23 2015, Koji, Configuration, IOO, MC Autolocker modified 
Entry  Mon Nov 16 16:18:34 2015, gautam, Update, General, water leak along Y-arm? 
    Reply  Tue Nov 17 10:06:53 2015, Steve, Update, General, water leak in east arm eastArmLeakyPipeInsideWall.jpgwd18ft.jpg
ELOG V3.1.3-