Entry  Tue Dec 29 04:28:27 2009, kiwamu, rana, haixing, Update, Cameras, New Video Switch Installed 
Entry  Tue Dec 29 13:57:20 2009, Rana, Kiwamu, and Haixing, Update, Photos, Photos of video switch box 
Entry  Wed Dec 30 09:57:53 2009, steve, Update, PSL, thirsty water chiller htemp60d.png
Entry  Wed Dec 30 10:58:48 2009, Alberto, Update, General, All watchdogs tripped this morning 
    Reply  Wed Dec 30 18:01:03 2009, Alberto, Rana, Update, General, All watchdogs tripped this morning 
Entry  Wed Dec 30 20:33:36 2009, rana, alberto, Configuration, Cameras, ITMY & MC2 Camera work DSC_1064.JPGDSC_1065.JPGDSC_1066.JPG
Entry  Wed Dec 30 22:17:07 2009, kiwamu, Update, General, Camera input and monitor output 
Entry  Sun Jan 3 08:23:39 2010, rana, Configuration, CDS, autoburt.pl 'fixed' for post 2009 years 
Entry  Mon Jan 4 09:52:40 2010, rana, Configuration, Cameras, ITMX camera and PSL channels 
Entry  Mon Jan 4 17:26:01 2010, Mott, Update, General, T & R plots for Y1 and Y1S mirrors 
Entry  Tue Jan 5 09:18:38 2010, Alberto, Omnistructure, Electronics, Universal PDH Box Stored in the RF Cabinet 
Entry  Tue Jan 5 10:26:32 2010, Alberto, Steve, Omnistructure, Environment, Added new wall cable-racks DSC_1068-1.JPGDSC_1070-1.JPG
    Reply  Tue Jan 5 11:00:04 2010, rana, Omnistructure, Environment, Added new wall cable-racks 
Entry  Tue Jan 5 13:23:45 2010, Alberto, Omnistructure, Environment, turning page 
Entry  Tue Jan 5 01:31:09 2010, Jenne, Update, WienerFiltering, New Wiener Filters installed in PEM IIR matrix on OAF screen MCwino-FFtest_4Jan10_sameFiltersAsinEPICS.pngOAF-FF_test_4Jan10.png
    Reply  Tue Jan 5 17:32:59 2010, Jenne, Update, WienerFiltering, New Wiener Filters installed in PEM IIR matrix on OAF screen OAF-FF_test_5Jan10.png
Entry  Mon Jan 4 17:21:30 2010, Jenne, Configuration, IOO, Elusive Mode Matching Solution found! Awesome_MM_Solution.png
    Reply  Wed Jan 6 03:44:41 2010, Koji, Configuration, IOO, Elusive Mode Matching Solution found! 
Entry  Wed Jan 6 16:48:52 2010, steve, Bureaucracy, SAFETY, copied NPRO key nprokey.JPG
Entry  Thu Jan 7 14:08:46 2010, Jenne, Update, Computers, We haven't had a bootfest yet this week.....so today's the day 
    Reply  Thu Jan 7 14:55:36 2010, Jenne, Update, Computers, We haven't had a bootfest yet this week.....so today's the day 
Entry  Fri Jan 8 10:03:04 2010, Alberto, Omnistructure, LSC, SPOB shutter was closed 
Entry  Fri Jan 8 10:38:35 2010, josephb, koji, Update, Computers, RFM and Megatron 
Entry  Fri Jan 8 11:43:22 2010, josephb, alex, Update, Computers, RFM and Megatron 
Entry  Fri Jan 8 15:40:14 2010, josephb, alex, Update, Computers, RFM and RCG 
Entry  Fri Jan 8 18:20:12 2010, steve, Metaphysics, Treasure, Rob now can concentrate on his thesis rob2.JPGrob3.JPGrob1.JPG
Entry  Fri Jan 8 20:13:49 2010, Alberto, JoB, Configuration, Computers, The 40m Kaiser Permanent Reboot Marathon pasadena_marathon.JPG
Entry  Sat Jan 9 09:47:03 2010, Alberto, Update, LSC, Problems trying to lock the arms 
    Reply  Sat Jan 9 11:07:30 2010, Alberto, Update, LSC, Problems trying to lock the arms 
Entry  Sat Jan 9 15:02:01 2010, Alberto, Update, ABSL, PRC scanning 
Entry  Sun Jan 10 13:32:09 2010, Haixing, Update, SUS, transfer function measurement of the quadrant maglev circuit  6x
    Reply  Sun Jan 10 15:47:26 2010, Koji, Update, SUS, transfer function measurement of the quadrant maglev circuit  
       Reply  Sun Jan 10 16:50:34 2010, Haixing, Update, SUS, transfer function measurement of the quadrant maglev circuit  
          Reply  Sun Jan 10 17:15:25 2010, Koji, Update, SUS, transfer function measurement of the quadrant maglev circuit  
Entry  Mon Jan 11 09:18:44 2010, Alberto, Update, General, Measurement running 
    Reply  Mon Jan 11 11:06:53 2010, Alberto, Update, ABSL, Measurement running 
Entry  Mon Jan 11 16:59:14 2010, Alberto, Update, ABSL, Interferometer Busy 
Entry  Mon Jan 11 19:36:13 2010, Alberto, Update, ABSL, Measurement running 
    Reply  Mon Jan 11 21:49:17 2010, Jenne, Update, ABSL, Measurement running 
Entry  Sun Jan 10 23:22:56 2010, Jenne, Summary, General, Scattering Measurements of 35W Beam Dumps P1090014_copy.JPGScatterometerSetup.png
    Reply  Tue Jan 12 09:14:52 2010, steve, Summary, General, Scattering Measurements of 35W Beam Dumps 
Entry  Tue Jan 12 09:37:05 2010, Alberto, Update, ABSL, IFO available 
Entry  Tue Jan 12 13:24:50 2010, Haixing, Update, SUS, Quadrant Magnetic Levitation schmematic.png
Entry  Sun Jan 10 16:05:51 2010, Alberto, Omnistructure, Environment, Lab Thermostats Temperature Lowered by 1 deg F 
    Reply  Mon Jan 11 10:01:06 2010, Alberto, Omnistructure, Environment, Lab Thermostats Temperature Lowered by 1 deg F 
       Reply  Tue Jan 12 14:28:01 2010, steve, Summary, Environment, lab temp of 7 years labtemp7y.png
Entry  Wed Jan 13 12:01:06 2010, Alberto, Update, Computers, c1dcuepics, c1lsc rebooted this morning 
Entry  Wed Jan 13 12:03:00 2010, Alberto, Update, ABSL, Measurement now running. Please be careful 
Entry  Thu Jan 14 11:44:06 2010, josephb, Summary, Computers, Memory locations for TST model for ITMY 
Entry  Fri Jan 15 11:21:05 2010, josephb, Update, Computers, Megatron and tst model for ETMY 
Entry  Fri Jan 15 18:53:05 2010, josephb,peter,koji, Update, Computers, Attempted locking with Megatron replacing ETMY front end 
Entry  Sun Jan 17 05:22:42 2010, rana, Configuration, Computers, ELOG script change 
Entry  Mon Jan 18 09:44:36 2010, Alberto, Bob, Omnistructure, Environment, No rain water infiltrations so far 
Entry  Mon Jan 18 18:34:01 2010, Alberto, Update, ABSL, Measurement in progress 
    Reply  Mon Jan 18 20:58:40 2010, Alberto, Update, ABSL, Measurement in progress 
Entry  Tue Jan 19 02:39:57 2010, kiwamu, Update, Electronics, design complete --- triple resonant circuit for EOM --- realistic.pngscaling.png
    Reply  Tue Jan 19 03:20:28 2010, Koji, Update, Electronics, design complete --- triple resonant circuit for EOM --- 
Entry  Sun Jan 17 19:18:55 2010, Alberto, Update, Computers, Boot fest to restart the computer and c1iscey not responding. 
    Reply  Tue Jan 19 10:30:29 2010, josephb, Update, Computers, Boot fest to restart the computer and c1iscey not responding. 
Entry  Tue Jan 19 12:54:39 2010, Alberto, Update, ABSL, Measurement in progress 
Entry  Tue Jan 19 16:21:18 2010, Alberto, Update, ABSL, Watchdogs not working and then fixed 
Entry  Mon Jan 18 23:44:19 2010, kiwamu, Update, Electronics, triple resonant circuit for EOM whole_circuit.pngdesigned_circuit.png
    Reply  Tue Jan 19 00:10:44 2010, rana, Update, Electronics, triple resonant circuit for EOM 
    Reply  Tue Jan 19 02:40:38 2010, Koji, Update, Electronics, triple resonant circuit for EOM 
       Reply  Tue Jan 19 03:04:14 2010, Koji, Update, Electronics, triple resonant circuit for EOM 
       Reply  Tue Jan 19 03:27:47 2010, kiwamu, Update, Electronics, Re: triple resonant circuit for EOM 
          Reply  Tue Jan 19 23:26:07 2010, kiwamu, Update, Electronics, Re:Re: triple resonant circuit for EOM matching_edit.pngeq1.pngdesigned_response.png
Entry  Thu Jan 21 10:09:27 2010, Koji, Summary, IOO, Photos of the optical tables 
Entry  Wed Jan 20 20:11:56 2010, Alberto, Update, ABSL, Some preliminary results from measuring PRC's transmissivity for an amplitude modulated beam 2010-01-19_PRCtransmissivityVsModel.png
    Reply  Thu Jan 21 10:31:13 2010, Koji, Update, ABSL, Some preliminary results from measuring PRC's transmissivity for an amplitude modulated beam 
Entry  Thu Jan 21 11:08:30 2010, kiwamu, steve, Update, VAC, Dry Pump replacement DSCN0428.JPG
Entry  Thu Jan 21 15:16:16 2010, josephb, koji, Summary, Computers, Megatron used to lock Y arm 
Entry  Thu Jan 21 17:23:30 2010, josephb,alex,koji, HowTo, Computers, RCG code fixes CDO32.png