40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 36 of 175  Not logged in ELOG logo
Entry  Tue Nov 17 21:10:35 2009, rana, Summary, Electronics, Busby Low Noise Box: Photos and Upgrades IMG_0217.JPGbusby-noise.png
    Reply  Wed Nov 18 00:38:33 2009, rana, Summary, Electronics, Voltage Noise of the SR560's OUTPUTs (the back panel) sr560.png
Entry  Wed Nov 18 01:12:15 2009, rana, Update, PEM, seismometers were not saturating during Halloween weekend Untitled.png
Entry  Wed Nov 18 14:55:59 2009, kiwamu, Update, Electronics, multi-resonant EOM --- circuit design ---- whole_circuit.pngdesigned.pngmont.png
Entry  Tue Nov 17 11:09:43 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
    Reply  Tue Nov 17 13:39:37 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
       Reply  Tue Nov 17 15:23:06 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
          Reply  Tue Nov 17 21:10:30 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
             Reply  Wed Nov 18 11:27:33 2009, Koji, josephb, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
                Reply  Wed Nov 18 12:33:30 2009, Koji, josephb, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC Untitled.png
       Reply  Wed Nov 18 16:24:25 2009, pete, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
Entry  Wed Nov 18 16:58:36 2009, kiwamu, Update, Electronics, multi-resonant EOM --- EOM characterization --- EOM_impedance.png
    Reply  Wed Nov 18 22:38:17 2009, Koji, Update, Electronics, multi-resonant EOM --- EOM characterization --- 
Entry  Thu Nov 19 09:25:19 2009, steve, Update, MOPA, water was added to the laser chiller htempwtr.png
Entry  Thu Nov 19 09:48:54 2009, steve, Update, PEM, construction effect varseism.png
Entry  Thu Nov 19 09:55:41 2009, josephb, Update, Computers, Trying to get testpoints on megatron 
Entry  Thu Nov 19 10:19:04 2009, josephb, Update, Computers, Megatron tst status 
Entry  Thu Nov 19 11:33:15 2009, josephb, Configuration, Computers, Megatron  
Entry  Thu Nov 19 16:04:48 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes 
    Reply  Thu Nov 19 18:49:55 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes 
Entry  Fri Nov 20 11:01:58 2009, josephb, alex, Configuration, Computers, Where to find RFM offsets 
Entry  Fri Nov 20 11:14:22 2009, josephb, alex, Configuration, Computers, test points working on megatron and we may have filters with switch outputs built in 
Entry  Fri Nov 20 11:32:48 2009, Haixing, Update, SUS, Magnetic levitation IntDiff.PNGS8007340.jpgS8007333.jpg
Entry  Fri Nov 20 13:54:45 2009, Alberto, Omnistructure, Environment, New Paper and Cardboard Recycling Bins Introduced to the 40m DSC_1030.JPGDSC_1031.JPG
Entry  Fri Nov 20 17:44:38 2009, Jenne, Update, Adaptive Filtering, Some svn shenanigans 
Entry  Mon Nov 23 00:46:09 2009, rana, rob, Update, PSL, ISS RIN: Its too high by 10x Untitled.png
Entry  Wed Sep 23 19:36:41 2009, rana, Update, PSL, RC temperature performance Untitled.pngUntitled.pnge.png
    Reply  Mon Nov 23 10:11:03 2009, steve, Update, PEM, long term temp fluctuation of the 40m lab 7ytemp.jpg
Entry  Fri Nov 20 16:18:56 2009, rob, Configuration, SUS, watchdog rampdown 
    Reply  Mon Nov 23 11:03:00 2009, steve, Update, SUS, jackhammer special well under control dig10d.pngP1050740.JPG
Entry  Fri Nov 20 00:18:45 2009, rana, Summary, Cameras, Video MUX Selection Wiki page 
    Reply  Mon Nov 23 16:28:12 2009, steve, Summary, Cameras, Video swicher options 
Entry  Mon Nov 23 19:36:28 2009, Jenne, Update, Adaptive Filtering, How to add ASS channels, so that they're saved to frames 
Entry  Mon Nov 23 21:36:38 2009, Koji, Update, IOO, Aligned PMC/RC 091123_PSL.png
Entry  Tue Nov 24 18:24:54 2009, Sanjit, Configuration, Adaptive Filtering, ASS channels added to framebuilder 
Entry  Tue Nov 24 14:33:22 2009, Alberto, Update, ABSL, working on the AP table 
    Reply  Tue Nov 24 19:16:02 2009, Alberto, Update, ABSL, working on the AP table 
Entry  Mon Nov 23 17:53:08 2009, Jenne, Update, Computers, 40m frame builder backup acting funny 
    Reply  Tue Nov 24 16:06:45 2009, Jenne, Update, Computers, 40m frame builder backup acting funny 
       Reply  Wed Nov 25 11:10:05 2009, Jenne, Update, Computers, 40m frame builder backup acting funny 
Entry  Wed Nov 25 12:28:22 2009, Jenne, Update, SUS, MC2 tripped 
Entry  Wed Nov 25 08:43:08 2009, Alberto, Update, ABSL, Working on the AP table 
    Reply  Wed Nov 25 15:42:27 2009, Alberto, Update, ABSL, Working on the AP table 
Entry  Mon Nov 23 21:30:29 2009, Jenne, Update, LSC, Measured MC length 
    Reply  Tue Nov 24 08:00:16 2009, rana, Update, LSC, Measured MC length 
       Reply  Tue Nov 24 10:36:21 2009, Koji, Update, LSC, Measured MC length 
          Reply  Wed Nov 25 03:05:15 2009, rob, Update, Locking, Measured MC length 
             Reply  Wed Nov 25 14:29:08 2009, rob, Update, Locking, Measured MC length--FSS trend FSStrendpowerjump.png
                Reply  Wed Nov 25 16:13:27 2009, rana, Update, PSL, Measured MC length--FSS trend 
                   Reply  Wed Nov 25 16:44:52 2009, Koji, Update, PSL, Measured MC length--FSS trend 091125_FSS.png
             Reply  Wed Nov 25 15:38:08 2009, rob, Update, Locking, Measured MC length 
Entry  Wed Nov 25 10:20:47 2009, Alberto, Update, ABSL, AbsL PLL not able to lock 
    Reply  Wed Nov 25 11:02:54 2009, Alberto, Update, ABSL, AbsL PLL not able to lock 
    Reply  Wed Nov 25 20:14:58 2009, Alberto, Update, ABSL, AbsL PLL not able to lock: problem fixed 
Entry  Wed Nov 25 20:28:17 2009, Alberto, Update, ABSL, Stopped working on the AbsL 
Entry  Wed Nov 25 20:44:48 2009, kiwamu, Update, Electronics, Multi-resonant EOM --- Q-factor ---- trans.pngeq1.pngimpedance.pngeq2.png
    Reply  Thu Nov 26 02:08:34 2009, Koji, Update, Electronics, Multi-resonant EOM --- Q-factor ---- 
Entry  Wed Nov 25 20:24:49 2009, Alberto, Update, ABSL, PLL Open Loop Gain Measured 2009-09-25_OLgain_g3png.png2009-09-25_OLgain_g6png.png
    Reply  Fri Nov 27 02:25:26 2009, rana, Update, ABSL, PLL Open Loop Gain Measured 
Entry  Sat Nov 28 20:27:12 2009, Koji, Update, PSL, FSS oscillation: Total gain reduced 091128_PSL.png
Entry  Sun Nov 29 16:56:56 2009, rob, AoG, all down cond., sea of red 
    Reply  Mon Nov 30 10:28:47 2009, Alberto, AoG, all down cond., sea of red 
       Reply  Mon Nov 30 11:29:40 2009, Alberto, AoG, all down cond., sea of red 
Entry  Mon Nov 30 11:45:54 2009, Jenne, Update, Computers, Wireless is back 
Entry  Mon Nov 30 16:23:51 2009, Jenne, Update, Computers, c1omc restarted 
Entry  Mon Nov 30 19:23:50 2009, Jenne, Update, MZ, MZ down 
Entry  Thu Dec 3 15:55:24 2009, Alberto, AoG, LSC, RF AM Stabilizer Output Power 
Entry  Fri Dec 4 18:54:03 2009, Jenne, Update, PEM, Ranger moved RangerSeismometer_SR560settings_4Dec2009.JPG
Entry  Sat Dec 5 14:41:07 2009, rob, AoG, all down cond., sea of red, again 
    Reply  Sat Dec 5 15:20:10 2009, Jenne, AoG, all down cond., sea of red, again 
Entry  Fri Dec 4 21:48:01 2009, Jenne, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered Oplev_IPang_screenshot_4Dec2009.png
    Reply  Fri Dec 4 23:17:55 2009, rob, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered 
       Reply  Sat Dec 5 01:40:11 2009, Koji, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered 
          Reply  Sat Dec 5 18:23:48 2009, Koji, Update, oplevs, Oplevs centered, IP_POS and IP_ANG centered Screenshot_091205_1830.png
Entry  Sat Dec 5 17:34:30 2009, rob, Update, IOO, frequency noise problem mcf.png
    Reply  Sat Dec 5 22:31:52 2009, rob, Update, IOO, frequency noise problem 
Entry  Mon Dec 7 09:38:05 2009, Koji, Update, VAC, Vent started 
Entry  Mon Dec 7 19:02:22 2009, Mott, Update, General, Reflectivity Measurements  Y1-45P_R.pngY1-45S_R.pngY1-50CC_R.png
Entry  Tue Dec 8 03:53:49 2009, kiwamu, Update, SUS, Free swinging spectra of ETMX  ETMX_air.png
Entry  Tue Dec 8 09:18:07 2009, Jenne, Update, Computers, A *great* way to start the day.... 
Entry  Tue Dec 8 10:20:33 2009, Alberto, DAQ, Computers, Bootfest succesfully completed 
Entry  Mon Dec 7 18:18:55 2009, Jenne, Update, COC, ETMX drag wiped 
    Reply  Tue Dec 8 13:03:26 2009, Koji, Update, COC, ETMY drag wiped 
Entry  Wed Dec 9 09:07:32 2009, steve, Update, PEM, high seismic activity seis24d.pngseis4h.pngP1050833.JPGP1050836.JPG
Entry  Wed Dec 9 10:53:41 2009, josephb, Update, Cameras, Camera client wasn't able to talk to server on port 5010, reboot fixed it. 
ELOG V3.1.3-