    Reply  Tue Jul 19 16:00:34 2022, yuta, Configuration, BHD, Fast channels for BHD DCPDs now available in c1lsc but not in c1hpc Screenshot_2022-07-19_14-26-39_c1hpc.pngScreenshot_2022-07-19_14-24-49_c1lsc.pngScreenshot_2022-07-19_15-51-25_GreenGreen.png
Entry  Tue Jul 19 18:41:42 2022, yuta, Update, BHD, Contrast measurements for Michelson and ITM-LO ContrastMeasurements.pdf
    Reply  Wed Jul 20 18:07:52 2022, Paco, Update, BHD, BHD MICH test BHD_MICH_OSC.pdf
    Reply  Thu Jul 21 21:50:47 2022, Tega, Configuration, BHD, c1sus2 IPC update 
    Reply  Fri Jul 22 15:05:26 2022, Tega, Configuration, BHD, c1sus2 shared memory and ADC fix Screenshot_2022-07-22_15-04-33_DCPD.pngScreenshot_2022-07-22_15-12-19_models.pngScreenshot_2022-07-22_15-15-11_ERR.pngScreenshot_2022-07-22_15-32-19_GDS.png
    Reply  Fri Jul 22 17:46:10 2022, yuta, Configuration, BHD, c1sus2 watchdog update and DCPD ERR channels Screenshot_2022-07-22_17-48-25.png
    Reply  Mon Jul 25 17:58:10 2022, Tega, Configuration, BHD, c1sus2 IPC dolphin issue update Screen_Shot_2022-07-25_at_5.43.28_PM.pngScreen_Shot_2022-07-25_at_5.21.10_PM.pngScreen_Shot_2022-07-25_at_5.30.58_PM.pngScreen_Shot_2022-07-25_at_5.35.19_PM.png
    Reply  Mon Jul 25 18:09:41 2022, Tega, Configuration, BHD, BHD Homodyne Phase control MEDM screen Screen_Shot_2022-07-25_at_6.12.08_PM.pngScreen_Shot_2022-07-25_at_6.18.09_PM.png
    Reply  Tue Jul 26 20:54:08 2022, Paco, Update, BHD, BHD MICH test - LO phase control 20220726_BICHD.pdf
    Reply  Wed Jul 27 18:30:50 2022, yuta, Update, BHD, LO beam power at BHD DCPDs is significantly lower than expected LOBeamAtBHD.JPGITMXSingleBounceAtBHD.jpg
Entry  Thu Jul 28 13:09:28 2022, yehonathan, Update, BHD, Mode matching considerations 
    Reply  Thu Jul 28 14:34:40 2022, Yehonathan, Update, BHD, LO beam power at BHD DCPDs is significantly lower than expected 
    Reply  Thu Jul 28 16:51:55 2022, Tega, Update, BHD, Shaking test for LO beam AS beam to BHD DCPDs Screenshot_2022-07-28_16-58-34_LOandASShaking.pngScreenshot_2022-07-28_18-08-55_DCPDPOPSuspensionCoherence.png
    Reply  Thu Jul 28 20:16:26 2022, Anchal, Update, BHD, Shaking test for LO beam AS beam to BHD DCPDs 
    Reply  Fri Jul 29 18:24:53 2022, Tega, Update, BHD, LO beam power improved by factor of 6 after LO and AS beam alignment LO_and_oldAS_settings.pngBHD_fringe_settings.pngScreenshot_2022-07-29_19-37-39.pngFromTheLeft-AS-POP-LO.JPG
    Reply  Mon Aug 1 18:42:39 2022, Tega, Configuration, BHD, c1sus2 IPC dolphin issue update c1sus2_dolphin.pngfb1_dxamin_status.pngdolphin_num_mem_init2.png
    Reply  Tue Aug 2 17:25:18 2022, Tega, Configuration, BHD, c1sus2 dolphin IPC issue solved c1lsc_IPC_status.pngFE_lsmod_dependencies_c1sus2_b4_after_iop_unpdate.png
    Reply  Wed Aug 3 16:00:51 2022, yuta, Update, BHD, BHD fringe aligned with reduced LO and AS beam clipping Screenshot_2022-08-03_15-46-36_BHDfringeAlmostUnclipped.png
    Reply  Tue Aug 9 15:33:12 2022, yuta, Update, BHD, BHD fringe contrast improved from 43% to 74% HPC-DCPD_B_OUT_1344118517_ITMY-LO.pngHPC-DCPD_A_OUT_1344118517_ITMY-LO.pngHPC-DCPD_B_OUT_1344118318_ITMX-LO.pngHPC-DCPD_A_OUT_1344118318_ITMX-LO.png
    Reply  Tue Aug 9 15:50:22 2022, Koji, Update, BHD, BHD fringe contrast improved from 43% to 74% 
Entry  Tue Sep 13 14:12:03 2022, Yehonathan, Update, BHD, Trying LO phase locking again Screenshot_2022-09-13_17-41-33.png
    Reply  Thu Sep 15 21:12:53 2022, Paco, Update, BHD, LO phase "dc" control lophase_oltf.pdflophase_noise_spectra.pdf
Entry  Tue Sep 20 15:40:07 2022, yehonathan, Update, BHD, Trying doing AC lock Screenshot_2022-09-20_15-38-44.png
Entry  Wed Sep 21 17:01:59 2022, Paco, Update, BHD, BH55 RFPD installed - part I IMG_3760.jpegIMG_3764.jpeg
    Reply  Thu Sep 22 19:51:58 2022, Anchal, Update, BHD, BH55 LSC Model Updates - part II 
    Reply  Fri Sep 23 14:10:19 2022, Radhika, Update, BHD, BH55 RFPD installed - part I IMG_3766.jpegIMG_3770.jpegIMG_3773.jpeg
    Reply  Fri Sep 23 18:31:46 2022, rana, Update, BHD, BH55 RFPD installed - part I 
    Reply  Fri Sep 23 19:04:12 2022, Anchal, Update, BHD, BH55 LSC Model Updates - part III 
    Reply  Mon Sep 26 11:39:37 2022, Paco, Update, BHD, BH55 RFPD installed - part II PXL_20220926_175010061.MOTION.jpgBH55_Transimpedance_Measurement.pdf
    Reply  Tue Sep 27 10:50:11 2022, Paco, Update, BHD, calibrated LO phase noise lo_phase_asd.pdf
    Reply  Wed Sep 28 16:37:26 2022, Paco, Update, BHD, calibrated LO phase noise; update lo_phase_asd.pdf
    Reply  Wed Sep 28 21:54:08 2022, Paco, Update, BHD, calibrated LO phase noise; update dcpd_phase_asd.pdflo_phase_asd.pdf
    Reply  Thu Sep 29 18:01:14 2022, Anchal, Update, BHD, BH55 LSC Model Updates - part IV 
    Reply  Fri Sep 30 20:18:55 2022, Paco, Update, BHD, LO phase noise with different actuation points BHDC_asd_actuation_point.png
Entry  Mon Oct 3 13:11:22 2022, Yehonathan, Update, BHD, Some comparison of LO phase lock schemes MICH_sens_vs_LO_phase.pdfLO_phase_sens_vs_LO_phase_RF.pdfLO_phase_sens_vs_LO_phase_double_audio.pdf
    Reply  Mon Oct 3 15:19:05 2022, Paco, Update, BHD, LO phase noise and control after violin mode filters filters_c1sus_lo1_lsc.pngBHDC_asd_act.pngboosted_lo_phase_control.png
    Reply  Thu Oct 6 11:12:14 2022, Anchal, Update, BHD, BH55 RFPD installation complete 
Entry  Thu Oct 6 18:50:57 2022, Anchal, Summary, BHD, BH55 meas diff angle estimation and LO phase lock attempts 
Entry  Fri Oct 14 17:04:28 2022, Radhika, Update, BHD, BH55 Q abnormality + fix IMG_3805.jpegIMG_3807.jpegBH55_IQDemodMeasuredDiff_1349737773.png
    Reply  Mon Oct 17 20:04:16 2022, Anchal, Update, BHD, BH55 RF output amplified BH55_RF_Amp_Working.pngrn_image_picker_lib_temp_1b072d08-3780-4b1d-9325-5795ed099d3d.jpgrn_image_picker_lib_temp_9d7ed3c0-7ff0-4ff7-9349-0211be397dc5.jpgrn_image_picker_lib_temp_05da14e1-eae0-4a84-8761-1c42b122cb1b.jpg
    Reply  Mon Oct 17 22:27:25 2022, rana, Update, BHD, BH55 RF output amplified 
    Reply  Wed Oct 19 11:09:20 2022, Radhika, Update, BHD, BH55 RF output amplified IMG_3840.jpegIMG_3847.jpeg
    Reply  Fri Oct 21 10:37:36 2022, Anchal, Summary, BHD, BH55 phase locking efforts 
    Reply  Fri Oct 21 16:15:10 2022, yuta, Summary, BHD, LO phase locking with BH55 audio dither trials Screenshot_2022-10-21_15-33-18_LO_OLTF_LO1_BH55_Q.pngScreenshot_2022-10-21_15-42-50_LO_OLTF_LO1_BHDCDIFF.pngScreenshot_2022-10-21_15-44-53_MICH_OLTF.pngScreenshot_2022-10-21_15-50-43_LO_OLTF_LO1_BH55_Q_MICH.pngScreenshot_2022-10-21_16-11-16.png
    Reply  Sat Oct 22 21:36:28 2022, rana, Summary, BHD, BH55 phase locking efforts 
    Reply  Mon Oct 24 18:01:00 2022, Paco, Summary, BHD, BHD actuation measurements OLTF_LOPhaseLocking_ITMYSingleBounce.pngActuationRatio_ITMY_AS1_AS4_LO1_LO2.png
    Reply  Tue Oct 25 08:25:00 2022, JC, Update, BHD, BHD fringe aligned with reduced LO and AS beam clipping 
    Reply  Tue Oct 25 17:27:11 2022, Paco, Summary, BHD, LO phase control with RF + audio sidebands Screenshot_2022-10-25_17-36-45_LOPHASELOCKED.pngScreenshot_2022-10-25_17-33-33_LOPHASELOCKING_MICHBHD_ELP80_280HzDither.png
    Reply  Wed Oct 26 16:04:12 2022, Paco, Summary, BHD, LO phase control with RF + audio sidebands 
    Reply  Thu Nov 3 20:07:01 2022, Anchal, Summary, BHD, AS1 coil balancing required 